Loading...
HomeMy WebLinkAboutNCC212409_NOT Closeout Documents_20220615Division of Energy, Mineral and Land Resources County: Cherokee Project: Murphy Retail Store Person financially responsible: Robert M. Broadway Address: 216 Westside Square Huntsville, AL 35801 River basin: Hiwassee Project # CHERO-2021-001 Case # 1. Project location: West US 64, Murphy, NC Pictures: No: ❑ Yes: ❑✓ Video: ❑ Digital: ❑✓ 2. Weather and soil conditions: clear; dry First inspection: Yes: ❑ No: ❑✓ 3.a. Has NCGO1 Certificate of Coverage been issued at time of inspection? Yes: ❑✓ No: ❑ 3.b. NCGO1 Certificate of Coverage onsite? Yes: ❑ No: ❑ Not Applicable: ❑✓ 4. Is site currently under notice of violation? Yes: ❑ No: ❑✓ 5. Is the site in compliance with S.P.C.A. and rules? Yes: ❑✓ No: ❑ If no, check violations below: 6. Violations: ❑ a. No approved plan, G.S. 113A-57 (4) and 15A N.C.A.0 413.0107(c) H g. Inadequate buffer zone, G.S. 113A-57(1) ❑ b. Failure to follow approved plan, G.S. 113A-57(5) h. Graded slopes and fills too steep, ❑ c. Failure to submit revised plan, G.S. 113A-54.1(b) and G.S. 113A-57(2) or 15A N.C.A.C. 413.0124 15A N.C.A.C. 413.0118(a) ❑ i. Unprotected exposed slopes, G.S. 113A ❑ d. Failure to provide adequate groundcover, G.S. 113A-57(3) and ❑ j. Failure to install and maintain measures, 15A N.C.A.C. 413.0107(b) 15A N.C.A.C. 413.0113 ❑ ffi❑ k. Failure to self -inspect G.S. 113A-54.1(e) e. Insufficient measures to retain sediment on site, G.S. 113A-57(3) 15A N.C.A.C. 413.0131 ❑ f. Failure to take measures to protect property, 15A N.C.A.C. 413.0105 ❑ 1. Other (describe) - (e) 7. Is the site in compliance with NPDES Permit NCG 010000? Yes: ❑✓ No: ❑ Not Applicable: ❑ If no, check violations below: ❑ m. Discharge without a permit, G.S. 143-215.1(a) and 15A N.C.A.C. 02H .0126 ❑ n. Failure to develop or adhere to approved plan, NCG 010000, Part I ❑ O. Failure to manage construction site pollutants, NCG 010000 Part 11, F ❑ p. Failure to provide ground stabilization, NCG 010000 Part 11, E ❑ q. Failure to meet self -inspection, reporting and record -keeping requirements, NCG 010000, Part III ❑ r. Failure to install and maintain BMP's, NCG 010000 Part II, G.2-3 ❑ s. Failure to dewater sediment basin from surface, NCG 010000, Part II, 13.8 or GA ❑ t. Bypass of stormwater control facilities, NCG 010000, Part II, G.5-6 ❑ u. Other (describe) 8. Site out of compliance with NOV deadline? Yes: ❑ No: ❑ Not Applicable: ❑✓ 9. Has sedimentation damage occurred since last inspection or at 1' inspection? Yes: ❑ If yes, where? (check all that apply) No: ❑✓ Lake/natural watercourse on the tract: ❑ Lake/natural watercourse off the tract: ❑ Other property: ❑ Description: Stormwater Discharge Outfall with sediment loss: Degree of damage: slight: ❑ moderate : ❑ severe: ❑ 10. Contact made with (name): NSA Title: Inspection report given: ❑ or sent: ❑✓ to person financially responsible. Date given/sent: 6/15/22 11. Corrective actions needed: Inspection performed by request for project close out. Site is stable and approved for close out. Report by: Bryan Shamblin Date of inspection: 6/13/22 ec: Others present: Time arriving on site: 12:15 PM Time leaving site: 12:20 PM Page 1 of 3 Revised 02122021 Division of Energy, Mineral and Land Resources County: Cherokee Project: Murphy Retail Store Project # CHERO-2021-001 11. Corrective actions needed (continued) ❑ Submit an adequate sedimentation and erosion control plan for approval, covering all areas disturbed or to be disturbed. ❑ Install all sedimentation and erosion control measures as shown on the approved plan. ❑ Submit a revised sedimentation and erosion control plan for approval for the following areas: ❑ Provide adequate permanent ground cover on all areas where development has been completed according to the time limits in the approved plan, including the following areas: ❑ Install erosion and sediment control devices sufficient to retain sediment on the tract at the following areas: ❑ Install temporary sediment traps or basins and associated diversions as shown on the approved plan, including the following locations: ❑ Install adequate drop inlet protection as shown on the approved plan, including the following locations: ❑ Provide an adequate stream buffer zone of sufficient width to confine visible sedimentation within the 25 % of the buffer nearer the land disturbance using natural or artificial means (minimum 25-foot width in Trout Waters) including the following areas: ❑ Reduce the angle of graded slopes to an angle on which vegetative ground cover may be established including the following locations: ❑ For disturbed areas less than one acre, provide adequate temporary or permanent ground cover on all graded slopes where rough or fine grading has been completed for 21 calendar days, including the following locations: ❑ Maintain all sedimentation and erosion control measures as specified in the approved plan and as required to prevent sedimentation damage including the following locations ❑ Inspect site and document self -inspections during or after each phase of the plan. ❑ Obtain NCGO10000 Certificate of Coverage as required. ❑ Properly handle concrete to avoid contact with surface waters, wetlands or buffers and prevent discharge from site. ❑ Relocate soil stockpiles at least 50 feet away from storm drain inlets or surface waters. ❑ Provide adequate temporary or permanent ground cover on areas where land -disturbing activity has ceased in 7 or 14 days according to NCG 01000 permit conditions at the following areas: ❑ Provide and dewater sediment basins with a drainage area of one acre or greater with a skimmer or flashboard riser. ❑ Route the flow of stormwater from the following location(s) into a control facility or measure: ❑ Inspect all erosion and sedimentation control measures and storm discharge outfalls at least weekly and within 24 hours of a rainfall event of 1.0 inch or greater and complete self -monitoring reports. ❑ Maintain a rain gauge in good working order and record daily rainfall amounts. 12. Comments: Report by: Bryan Shamblin Date of inspection: 6/13/22 Page 2 of 3 Revised 02122021 Division of Energy, Mineral and Land Resources County: Cherokee Project: Murphy Retail Store Project # CHERO-202 1 -001 Check only one box, if closing out project. ❑ Permanent ground cover sufficient to restrain erosion has been established. No additional self -inspection or monitoring is required. Project is released and coverage under the NPDES General Stormwater Permit for Construction Activities is terminated. ✓❑ Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCG01) must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at: https://edoes.deq.ne.gov/Forms/NCGO1-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. Report by: Bryan Shamblin Date of inspection: 6/13/22 Page 3 of 3 Revised 02122021