HomeMy WebLinkAbout20120965 Ver 2_401 Application_20140614o/��oFry�w,a rF�9Oc
O Niii� 'C
2 0 1 4 0 5 8 9
$ PAID
Office Use Only:
Corps action ID no.
DWQ project no.
Form Version 1.4 January 2009
Page 1 of 10
PCN Form — Version 1.4 January 2009
Pre - Construction Notification (PCN) Form
A.
Applicant Information
1.
Processing
1 a.
Type(s) of approval sought from the Corps:
❑X Section 404 Permit ❑ Section 10 Permit
1b.
Specify Nationwide Permit (NWP) number: 14 or General Permit (GP) number: 3886
1c.
Has the NWP or GP number been verified by the Corps?
❑ Yes ❑X No
1d.
Type(s) of approval sought from the DWQ (check all that apply):
401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit
❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization
1 e.
Is this notification solely for the record
because written approval is not required?
For the record only for DWQ
401 Certification:
❑ Yes ❑X No
For the record only for Corps Permit:
❑ Yes ❑X No
1f.
Is payment into a mitigation bank or in -lieu fee program proposed for
mitigation of impacts? If so, attach the acceptance letter from mitigation bank
or in -lieu fee program.
❑ Yes ❑X No
1g.
Is the project located in any of NC's twenty coastal counties. If yes, answer 1h
below.
❑ Yes ❑X No
1h.
Is the project located within a NC DCM Area of Environmental Concern (AEC)?
❑ Yes ❑X No
2.
Project Information
2a.
Name of project:
Autumn Creek Farm access driveway
2b.
County:
Guilford
2c.
Nearest municipality / town:
Summerfield, NC
2d.
Subdivision name:
na
2e.
NCDOT only, T.I.P. or state project no:
na
3.
Owner Information
3a.
Name(s) on Recorded Deed.
Piedmont Land Conservancy
3b.
Deed Book and Page No.
R 7182, PG2725 -2741 D
3c.
Responsible Party (for LLC if
applicable):
'
Kevin Redding, Executive Director - 1 -S
3d.
Street address:
1515 W. Cornwallace, suite 205 JUN -
3e.
City, state, zip:
Greensboro, NC, 27404
3f.
Telephone no.:
336- 691 -0088
336 -691- 0044►ch
3g.
Fax no.:
3h.
Email address:
kredding @piedmontland.org
Page 1 of 10
PCN Form — Version 1.4 January 2009
4. Applicant Information (if different from owner)
4a Applicant is
❑ Agent Q Other, specify Owner
4b- Name
4c Business name
(if applicable)
4d Street address
4e City, state, zip
4f Telephone,no -
4g Fax no
4h Email address
S. AgentlConsultant Information (if applicable)
5a Name
5b Business name
(if applicable)
5c Street address
5d City, state, zip
5e Telephone no
5f ,Fax,no
5g Email address
Page 2 of 10
B.
Project. Information and Prior Project History
1.
Property Identification
1a
Property identification no (tax PIN or parcel ID)
PIN 7940051736
lb
Site coordinates (in decimal degrees)
I Latitude 36 236339 Longitude 79 876473
1c- Property size
156 acres
2.
Surface Waters
2a
Name of�nearest body,of water to proposed project
Haw River
2b
Water Quality Classification of nearest receiving water
WS -V, Impaired
2c ,River basin
Cape Fear
3:
Project Description
3a Describe the existing conditions on the site,and the general,land use in the vicinity of the project,at the time of this
application
The PLC property is farm land behind a residential subdivision in the rural part of northern Guilford County The property is 156 acres with upland
open old fields in the interior and forested riparian buffers on'three sides A,conservation easement has been placed on the property that prevents
disturbance of the npanan,areas on the property with one<exception being the access,road
3b
List the total estimated acreage of all existing wetlands on the property 2 -3 ,, e d ;. "no 400CLA 1,crosev► e4 -wens
3c-
List the total estimated linear feet of,all existing streams (intermittent and perennial) on the property 6,000 ,",1 u7oo,
3d Explain the purpose of the proposed project
Remove current under size culvert, install new larger,culvert upstream, realign driveway to avoid adjacent property
3e Describe the overall protect in detail, including the type of equipment,to be used
Remove the current culvert, restore the banks in that area, move upstream, install a larger culvert, relocate the access driveway, seed and stabilize
4.
Jurisdictional Determinations
4a
Haverjurisdictional wetland or stream determinations by the
Corps or State been requested or obtained for this property /
project (including all prior phases) in the past?
❑ Yes ❑ No ® Unknown,
Comments
4b
Ifthe Corps made the jurisdictional determination, what type
of determination was made?
❑ Preliminary ❑ Final
4c
If yes, who delineated the jurisdictional areas?
Name (if known)
Agency /Consultant Company
Other
4d
If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation
5.
Project History
5a
Have permits or certifications been requested nor obtained for
this project (including all prior phases) in the, past?
O Yes ❑ No ❑ Unknown
5b If yes, explain in detail according to "help file"' instructions
DVVQ# 12 -0965, November 5, 2012 SAW- 2012 - 01390, November 14, 2012
6.
Future Project,Plans
6a
Is this a phased project?
❑ Yes ❑X No
6b
If,yes, explain
Page 3 of 10
PCN Form - Version 1, 4 January 2009
M�I"Nw�
C. Proposed Impacts Inventory
1'. Impacts Summary
1a Which sections were completed below for your project (check all that apply)
❑ Wetlands Streams — tributaries ❑ Buffers ❑ Open'Waters ❑ Pond'Construction
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this-question for each'wetland area impacted
2a
Wetland impact
number
Permanent (P) or
Temporary-
2b
Type of impact
2c
Type of wetland
2d
Forested
2e
Type of jurisdiction
Corps (404,10) or
DWQ (401, other)
2f
Area of
impact
(acres)
W1 -
Choose one
Choose one
Yes /No
-
W2
Chooseone
Choose one
Yes /No
-
W3
Choose one
Choose one
Yes /No
-
W4 =
Choose one
Choose one
Yes /No
-
W5 -
Choose,one
Choose one
Yes /No
-
W6
Choose.one
Choose one
Yes /No
-
2g Total Wetland'Impacts:
2h Comments
There are no wetlands at the point of this stream crossing
3. Stream Impacts
If'there,are perennial or intermittent stream impacts (including temporary impacts)' proposed on the site, then,complete this
question for'all'stream sites impacted
3a
Stream impact
number
Permanent (P) or
Temporary (T)
3b
Type of impact
3c
Stream name
3d
Perennial (PER) or
intermittent (INT)?
3e
Type,of
jurisdiction
3f
Average
stream
width
(feet)
3g
Impact
length
(linear
feet)
S1 P
Culvert
UT`to HaW'River
PER
Corps
5
78
S2 -
Choose one
-
S3 -
Choose one
-
S4 -
Choose one
-
S5 -
Choose one
-
S6 -
Choose one
-
3h Total,strearn and tributary impacts
31 Comments
This is to'install one large culvert, see,attached plans prepared by Ecologic Associates, P A
Page 4 of 10
PCN Form — Version 1 4 January 2009
4. Open Water Impacts
If there,are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open,water of
the "U S then indivil ually list all open water impacts below
4a
4b
4c
4d
4e
Open water
Name of waterbody
impact number
(if applicable)
Type of°impact
Waterbody
Area of impact,(acres)
Permanent (P)' or
type
Temporary
01 -
Choose one
Choose
02 -
Choose one
Choose
03 -
Choose one
Choose
04 -
Choose one
Choose
4f Total open water impacts
4g Comments
5. Pond or Lake Construction
If pond or lake, construction„ proposed, the complete the chart below
5a
5b
5c
5d
5e
Pond ID number
Proposed use or
Wetland Impacts (acres)
Stream Impacts (feet)
Upland
purpose of pond
(acres)
Flooded
Filled
Excavated
Flooded
'Filled
Excavated
P1
Choose one
P2
Choose one
5f Total:
5g Comments
5h Is a dam high hazard permit required?
❑ Yes ❑ No If yes, permit ID no
51 Expected pond surface area (acres)
5j Size of pond watershed (acres)
5k Method of construction
6. Buffer Impacts (for DWQ)
If project will impact a protected riparian buffer, then complete the chart below If yes, then individually list all buffer impacts
below If,an 'im acts require mite ation, then you MUST fill out Section D of this form
6a. Project'is in which, protected basin?
❑ Neuse ❑ Tar - Pamlico ❑ Catawba ❑ Randleman ❑ Other
6b
6c
6d
6e
6f
6g
Buffer Impact
Reason for impact
Stream name
Buffer
Zone 1
Zone 2
number —
mitigation
impact
impact
Permanent (P) or
required?
(square
(square
Tem ora
feet )
feet
B1 -
Yes /No
B2 -
Yes /No
B3 -
Yes /No
B4 -
Yes /No
B5 -
Yes /No
B6 -
Yes /No
6h Total Buffer Impacts:
61 Comments
Page 5 OT 1U
D. Impact Justification and Mitigation
1. Avoidance and Minimization
la Specifically describe measures taken to avoid or minimize the proposed impacts in designing project
We are only °installing a�smgle lane dnveway A conservation easement has been placed on the remainder of the property to eliminate any impacts to
the remaining 4500+ feet of riparian buffers 'The,easement specifically mentions the conservation values of the protect include protection of water
quality and -we will ensure thafthe construction crew exceeds these expectations
1b Specifically describe measures taken to avoid or minimize, the proposed impacts through construction techniques
We will only disturb the minimum area need to do,the fob We will seed and install sediment,control measures;as construction proceeds We will
remove and restore the current culvert location before moving on to the new installation We will use native species
2. Compensatory Mitigation for Im acts,to Waters of the U.S. or Waters of the State
26 Does the project require Compensatory Mitigation for
impacts to Waters of the U S or Waters of the State ?'
❑ Yes ❑X No
'2b If yes, mitigation is required by (check all that apply)
r
❑ DWQ ❑ Corps
2c If yes, which mitigation option will be used for this
project?
❑ Mitigation bank
❑ Payment to in -lieu fee program
❑ Permittee Responsible Mitigation
'3. Complete if Using a Mitigation Bank
'3a Name of Mitigation Bank
3b Credits.Purchased (attach receiptland letter)
Type Choose one
Type Choose one
Type Choose one
Quantity
Quantity
Quantity
3c Comments
4. Complete if Making a Payment to In -lieu Fee Program
4a Approval letter from in -lieu fee program is attached
❑ Yes
4b Stream mitigation requested
linear feet
4c, If using stream mitigation, stream temperature
Choose one
4d Buffer mitigation requested (DWQ only)
square feet
4e Riparian wetland mitigation requested
acres
4f Non - riparian °wetland mitigation', requested
acres
4g Coastal (tidal) wetland mitigation requested
acres
4h Comments
5. Complete if`Using,a Permittee Responsible Mitigation Plan
5a If using a permittee responsible mitigation ,plan, provide a description of the proposed mitigation plan
Page 6 of 10
PCN Form — Version 14 January 2009
6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ
6a Will the project result in an impact within, a, protected riparian buffer that requires
buffer`mitigation?
Yes ❑X No
,6b If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation Calculate the
amount of mitigation required
Zone
6c
Reason for impact
6d
Total impact
(square feet),
Multiplier
6e
Required mitigation
(square feet)
Zone 1
3 (2 for Catawba)
Zone 2
1 5
6f Total buffer mitigation required:
6g If buffer mitigation is,regwred, discuss what type of mitigation is proposed (e g , payment to private mitigation bank,
permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund)
6h Comments
Page 7 of 10
E.
Stormwater Management and Diffuse,Flow Plan (required by DWQ)
1.
Diffuse Flow Plan
la
Does the project include or is it adjacent to protected riparian buffers identified
within one of the NC Riparian Buffer Protection Rules?
❑ Yes ® No
1 b
If yes, then is ,a diffuse flow plan included? If no, explain why
❑ Yes ❑ No
2.
'Stormwater Management Plan
2a
What is the overall percent imperviousness of this project?
006%
2b
Does this project re uire a Stormwater, Management Plans
❑ Yes ® No =
2c
If'this project DOES NOT require a Stormwater Management PI -an, explain why -
This
project disturbs'less than one half acre of land overall, and much less then that will be this culvert realignment
385 feet of single lane driveway,
one stream crossing =total land cleared of 0 2754 acres
2d
If this project DOES require a Stormwater Management Plan, then,provide a brief, narrative description of the plan
2e
Who will be responsible for the review of'the Stormwater Management Plan
3.
Certified Local Government Stormwater Review
3a
In which local govern ment's_ ju nsdiction is,this project?
Summerfield, NC
❑ Phase II
3b
Which of the following locally - implemented stormwater management programs
apply (check'all,that apply)-
El NSW
'❑ USMP
❑ Water Supply Watershed
Q Other Jordon Lake Rules
3c
Has the approved Stormwater Management Plan with proof of approval "been
El Yes ®No
attached?
4.
DWQ Stormwater Program Review
[]Coastal counties
❑HQW
4a
Which of the following state - implemented stormwater management °,programs apply
(check all that apply)
❑ORW
❑Session Law 2006 -246
❑ Other
4b
Has the approved Stormwater Management Plan with proof of approval been
❑ Yes ® No
attached?
5.
DWQ401 Unit Stormwater Review
5a
Does the Stormwater Management Plan meet the appropriate requirements?
❑ Yes ❑ No
5b
Have,all of the 401 Unit submittal requirements been met?
❑ Yes ❑'No
Page 8 of 10
PCN Form — Version 1 4 January 2009
F. Supplementary Information
1.
Environmental Documentation (DWQ Requirement)
1a
Does the project involve an expenditure of publlc,(federal /state /local) funds or the
❑ Yes, ❑X No
use of public (federal /state) land?
lb
If you answered "yes" to the above, does the project require preparation of an
environmental document pursuant to the requirements of the National or State
❑ Yes ❑ No
(North Carolina) Environmental Policy Act (NEPA/SEPA)?
1c 'Ifyou answered "yes" to the above, has the document review been finalized by the
State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval
❑ Yes ❑ No
letter)
Comments
2:
Violations (DWQ Requirement)
2a
Is the site In violation of DWQ Wetland Rules (15A NCAC 2H 0500), Isolated
Wetland Rules (15A NCAC 2H 1300), DWQ Surface Water or Wetland Standards,
❑ Yes 0 No
or Riparian Buffer Rules (15A NCAC 2B 0200)?
2b
Is,this,an after - the - fact °permit application?
❑ Yes ❑X No
2c
If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s)
3.
Cumulative Impacts (DWQ Requirement)
3a
Will this project (based on past and reasonably anticipated future impacts) result in
❑ Yes MM
additional development, which could impact nearby downstream water ,quality?
3b
If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact,analysis in accordance with the
most recent DWQ policy If you answered "no," provide a short narrative description
4
Sewage Disposal (DWQ Requirement)
4a Clearly detail the, ulti mate, treatment methods and disposition (non - discharge or discharge)
of wastewater generated from,
the proposed project, or available capacity of °the subject facility
Not,applicable
Page, 9 of l 0
PCN Form — Version 1 4 January 2009
5 Endangered Species and Designated Critical Habitat (Corps Requirement)
5a Will this project occur in or near an area with federally protected species or
❑ Yes ❑X No
habitat?
5b Have you checked with the USFWS concerning Endangered,Species Act
❑ Yes ❑X No
impacts?
5c If yes, indicate the USFWS Field Office you have contacted
-
5d What data.,sources did you use to determine whether your site'would impact Endangered Species or Designated Cntical
Habitat?
NC Natural Heritage Program, Guilford County Natural Heritage Inventory, NC Wildlife Resources Commission and PLC staff personal experience
from conducting 25 years of biological, wetland and stream investigations in the piedmont,of North Carolina
6. 'Essential Fish Habitaf(Corps Requirement)
6a Will this protect occur in or near an, area designated as essential fish habitat?
❑ Yes ❑X No
6b What data sources did you use to determine whether your site would impact Essential Fish Habitat?
Phone conversation with WRC fishery biologist Jessica Bauman
7 Historic or Prehistoric Cultural Resources (Corps Requirement)
7a, Will this project occur in or near an area that the,state, federal or tribal
governments have designated as having historic or cultural preservation
❑ Yes ® No
status (e g , National Historic Trust designation or properties significant in
North Carolina history and archaeology)?
7b What data sources did you use to determine whether your site would impact historic or archeological resources?
Town of Summerfield Planning Department
8 Flood Zone Designation (Corps Requirement)
8a Will this project occur in a, FEMA - designated 100 -year floodplain?
❑ Yes ❑X No
,8b If yes, explain how project meets FEMA requirements
8c. What sources) ,did you use to make the floodplain determination?
Site survey that mapped'the 100 year floodplain,and Town of Summerfield Planning Department
Kevin Redding
/
Applicant/Agent's Printed'Name
Date
Applicant/Ag t' Signature
(Agent's signature,isw lid my if an authorization
letter from the a cant is provided
Page 10 of 10
SCALE 1:200000
0 10000 '10000 30000 40000 60000
FEET
079 9000000°
W 079 8000000`
W 079.700)000'
W 079.6
O
+
+
m
Autum
-. - Creek
arm
Z
-
z
0
"
0
O
}�a
O
N
i
::a a
O
seph 44,S
�.
Vol
o
o
Ali
0
40e
/ 40
2g q�
170 y vs
/?w4l,
Vicinity Map: Autumn Creek Farm
Vice ty ap
Z
Z
0
0
on R
o
4 w l
r
(D
Cl)
•.
COPYTOOt
2008 MYM, 2006- 2614TomTo
M
0'79,900'0000*
1
w 679.800 000° w 079.7040010-
1 --
W 079.
I --
i�
SCALE 1:200000
0 10000 '10000 30000 40000 60000
FEET
- X, * I;j IV"
H CAROLINA - SHEET NUMBER UMBER 2
ROCKINGHAM COUNTY
a
(�vi l f �d Cv�h�y Sri �s 1Ma�
pfu+VVAV\
bV%V.0,V.'44j
ccc. CcC
-eq
z Y,,V, V4
I
vijf
'T
2., otlas
J►JNVAV3SNO3 4NVl 1NOWO3ld °
as bnosr aom3MS 0 u..w rota 711 'ollaasr133m
3K / -iK /M :31404W Vam xm w W W O ad
WoW- wwp•••• 7' +'UMOO V m w73 :83NMO A183dOad
'z ^ = Q =
z
:)N `OHOSSN331l9 z" �Z z
�N al31ia3WWns
z
M33V:) NwninV -1N3W3JVld3l1 A�NVAIl35N0� ONVI 1NOW031d > o
IH3Ain:) 11N3WN911V3H OVOa SS3:):)V z
:A8 03dVd3dd :133fO8d 1N311O Y g N ° °
a —J
Cm) /
CD
/0
CD
C
I
—760
�- d
xxlN ^
a/ Q h
_ :
OSL —
\
—
F
_
Q�1-
QQ� �.
Cr W
N
/ 2 =
°NO�
Z \
j _ m
\
Q 0 0
LLi
CL V) O "tZ \
°�°
Q
O W 7 Q \
z
C) 0Q
O
o
J
C, I
W
Q rn
W
o F- /
�s
of /
Q /
N
Q '
/ I f
i
/
/
CD
C
I
—760
�- d
xxlN ^
a/ Q h
_ :
OSL —
\
ADNVA)13SNO3 WWI aI 1NOWO3ld Q
as 'ano��ae° aV�uaO LeY+d°f tfMLZ ON 'OaOB5N33lp �'
ZOTO -M /M 3NONd nzty zoe w d W y p
3 suvaom 3=1003 H3NM0 A163dMd N Z d rn Z
3N baOBSN33a9 z N' ' d c z
3N al31�a3WWf1S A3N"H3SN0� aNVI 1NOWa31d
En W,s� G oiJ a
low H33V3 NwninV -1N3W33Vld3a > ° 's ue w W �p
la3Alf I iN3WN9lIV3V aVOH SS333V g' �O" H uj v
F--
= o
•A9 a3NVd38d 1 rOdd 1N3113 s a �'
g
YN
\ I �
I
+
BR
>so
0000
0000E
000°
o000
000
0000
o0
0000
000
0000
000
00 o 0 o 0
o
o000
000
_J
Q
e�
LLJ
'fil
LL-
e�
CYO
Q
m
a Xx
86
o
U
�
W
m
4-
LA l
OO pi o
LY
a
J
�
0
I/
U
j
g
YN
\ I �
t?'
e
d a t
+
m
+
BR
>so
0000
0000E
000°
o000
000
0000
o0
0000
000
0000
000
00 o 0 o 0
o
o000
000
_J
Q
e�
W
Z
O
Qg
Ch
&
O
w
V
e
0
I/
PIN
j
�
1 1 1
a
1
' J
O
000
LiJ
000
0000
Z
Z
Z
1 1
1 1 1 1
Q
0
°
O
U
J
e�
U
t?'
e
d a t
10
+
m
+
BR
>so
0000
0000E
000°
o000
000
0000
o0
0000
000
0000
000
00 o 0 o 0
o
o000
000
4�4
3
R
a'�
6 �
e�
V
I I I
0
I/
PIN
O
1 1 1
1 1 1
a
UN
O
000
000
0000
00000 o
Z
1 1
1 1 1 1
0
°
O
I I I
J
U
U
V)
I
kB
a
cn
I I
Q�
O
I I
&
I I
Ila
Lij
U
I I I
F—
I
I I
0
!Y
1 1 1
1 1 1 1
rg
j
1 1
1 1 1 1
d
a
U
10
,� q
+ >
o ao
m B
+
m
+
BR
>so
0000
0000E
000°
o000
000
0000
o0
0000
000
0000
000
00 o 0 o 0
o
o000
000
4�4
3
R
a'�
6 �
e�
0
I/
O
000
000
0000
00000 o
0
°
J
U
Ila
Lij
0
rg
d
a
LLJ
J
�Q
,� q
+ >
o ao
m B
i
APPROXIMATE LOCATION OF :SPECIAL FLOOD H ZAR� ARE
AS TRACED FROM F.E.M. FLOOD INSURAN RASE MAP.
3710793000) AND 3710 94000), BOTH STH EFFECTIVE
DATE: U VE X2(387
E N ci
0 M a
V � W
� N g
U M N
o coo a
O M U
mo
L;A W
3 O a
=o
� N
F
d'
0
v
708' NOR\TH
-Al
a n In
4n \
Rn 1;D0
SCALE: = 20'
NO. I DESCRIPTION I DATE
REVISIONS
PLAN DESIGNER:
GRADING &
DRAINAGE
r A
SCALE: 1 "=20'
DATE: 5/19/14
SHEET 1 OF _2
DRAWING N0.
ow
®
U
d �
m
N N
a
Q
W
�
Q N p
Q
O
U m
W
ooz
mW
waw
�
v
W
z
W
V�
�,
W
z�
z
Wi
z
0
��
(�
Q
I.L
J
'
cc
Q�Lu
uiz2
W z
®
2
_
3::2
O in
®
V
N
uJ
J
IL
�
Fes-
%A
UJ
Lli
-LLJ
)
W
OC
m
0
V
0
w
V
w
m
Q
m
708' NOR\TH
-Al
a n In
4n \
Rn 1;D0
SCALE: = 20'
NO. I DESCRIPTION I DATE
REVISIONS
PLAN DESIGNER:
GRADING &
DRAINAGE
r A
SCALE: 1 "=20'
DATE: 5/19/14
SHEET 1 OF _2
DRAWING N0.
ow
1 �2»-'
BEVEL[16"Max.
2/3 TO 3/4
TOTAL LENGTH
i
CHANNEL RESTORATION DETAIL
BO,JLDERS TO
STABILIZE BANKS
LIVE STAKES JOINT
PLANTED CSA 3' SPACING
3'+/-
MATCH EXISTING
CHANNEL WIDTH
1 Ofd MATCH
EX TING BANKS
FOOTER ROCKS
(ONSITE BOULDERS)
SEED & MULCH
BANKS AND DISTUR3ED AREA
CULVERT CROSS SECTON (TYP)
DRIVEWAY SURFACE MIN 4" GRAVEL TYPICAL
INVERT
EL 740.0 +/-
#57 WASHED STONE MIN. 6 INS THICK
BELOW PIPE AND COMPACT UNDER HAUNCHES
TO SPRING UNE. NCDOT TYPE 3 FILTER FABRIC
SHALL BE PLACED BENEATH ALL STONE MATERIALS.
CULVERT PROFILE THRU CL
13'
EL 749.0 +/-
O O O O O O O O
000000p0 24" MINIMUM 00000000 MINIMUM 24" CLASS 1 RIP RAP
000�000o00 SOIL COVER 000000000000000 ON NCDOT TYPE 3 FILTER FABRIC
/ 1.5 z 1.5 \
1
1/ 128" x 83" X 45' \' g'
10'+/- ALUMINIZED STEEL PIPE ARCH \ \ SECTIONS
INV IN INV OUT
EI 740.0+/-\ / EI 739.6+/ -
DETAILS
AILS
CIRCULAR PIPE BEDDING & BACKFILL DETAIL
COMPACTED
SOIL BACKFILL
nDivnalA V ci iDcnr'r
MINIMUM
L COVER
SPRING LINE
=D STONE MIN. 6 INS THICK
E AND COMPACT UNDER HAUNCHES
TO SPRING LINE. NCDOT TYPE 3 FILTER FABRIC
SHALL BE PLACED BENEATH ALL STONE MATERIALS.
E N ci
O t0 CL
U M
NIn
a_
Uou
In
O CSO
U M
N
C,
W0
Z \
O
CL N
0
0
v
n. 0
O
N I�
FW— N
Q
O Z
N
Q N O
0
m
Oj m W
O w
CJOW
WCL0
•
.�
— — . — . . — — — •24" t rNIMUM —
— — — -
-
cic
COMPACTED
SOIL BACKFILL
OR STEEPER IF
— — — —
— — SOLID GROUND
•
a
Lu•
FILTER FABRIC BETWEEN
— — ALUMINIZED STEEL PIPE ARCH —
— SOIL AND STONE FOR
— SPAN 128" WIDE BY 83" TALL
SEPARATION (BOTH SIDES)
•
SPRING LINE
INVERT
EL 740.0 +/-
#57 WASHED STONE MIN. 6 INS THICK
BELOW PIPE AND COMPACT UNDER HAUNCHES
TO SPRING UNE. NCDOT TYPE 3 FILTER FABRIC
SHALL BE PLACED BENEATH ALL STONE MATERIALS.
CULVERT PROFILE THRU CL
13'
EL 749.0 +/-
O O O O O O O O
000000p0 24" MINIMUM 00000000 MINIMUM 24" CLASS 1 RIP RAP
000�000o00 SOIL COVER 000000000000000 ON NCDOT TYPE 3 FILTER FABRIC
/ 1.5 z 1.5 \
1
1/ 128" x 83" X 45' \' g'
10'+/- ALUMINIZED STEEL PIPE ARCH \ \ SECTIONS
INV IN INV OUT
EI 740.0+/-\ / EI 739.6+/ -
DETAILS
AILS
CIRCULAR PIPE BEDDING & BACKFILL DETAIL
COMPACTED
SOIL BACKFILL
nDivnalA V ci iDcnr'r
MINIMUM
L COVER
SPRING LINE
=D STONE MIN. 6 INS THICK
E AND COMPACT UNDER HAUNCHES
TO SPRING LINE. NCDOT TYPE 3 FILTER FABRIC
SHALL BE PLACED BENEATH ALL STONE MATERIALS.
E N ci
O t0 CL
U M
NIn
a_
Uou
In
O CSO
U M
N
C,
W0
Z \
O
CL N
0
0
v
n. 0
O
N I�
FW— N
Q
O Z
N
Q N O
0
m
Oj m W
O w
CJOW
WCL0
NO. I DESCRIPTION I DATE
REVISIONS
PLAN DESIGNER:
S•i6 " _
• • • • • • • • • • • • • �!�!�! �!�!�!�!�!�!�!�!�!�!�!�lrl-��l ��1�!!llllllll���lrlllllllllllllllllll!�!�!�!�!�!�!�! !�!�l�l�i�l�l�l�l�l�l�l�l�l��� • • • • • • • • • • • • • , • , • - • • • • • • • , • . • . •'
.............
............. ................
CLASS 1 RIP RAP OR
EQUIVALENT NATURAL STONE
MINIMUM 30 INCHES THICK
ON FILTER FABRIC
REPLACE UNSUITABLE MATERIAL
WITH SURGE STONE OR #3 WASHED STONE
ON FILTER FABRIC
BEDDING 6 INS MI+,%IIMUM
#57 WASHED STOH;IE
CLASS 1 RIP RAP OR
EQUIVALENT NATURAL STONE
MINIMUM 30 INCHES THICK
ON FILTER FABRIC
SCALE: NTS
DATE: 5/19/14
SHEET 2 OF 2
DRAWING NO.
ow
•
.�
Lij
W
cic
r
•
a
Lu•
•
LLJ
•
t
•
•h
z
ILA
•
u
s
LU
.
.
.
FLno■
.
NO. I DESCRIPTION I DATE
REVISIONS
PLAN DESIGNER:
S•i6 " _
• • • • • • • • • • • • • �!�!�! �!�!�!�!�!�!�!�!�!�!�!�lrl-��l ��1�!!llllllll���lrlllllllllllllllllll!�!�!�!�!�!�!�! !�!�l�l�i�l�l�l�l�l�l�l�l�l��� • • • • • • • • • • • • • , • , • - • • • • • • • , • . • . •'
.............
............. ................
CLASS 1 RIP RAP OR
EQUIVALENT NATURAL STONE
MINIMUM 30 INCHES THICK
ON FILTER FABRIC
REPLACE UNSUITABLE MATERIAL
WITH SURGE STONE OR #3 WASHED STONE
ON FILTER FABRIC
BEDDING 6 INS MI+,%IIMUM
#57 WASHED STOH;IE
CLASS 1 RIP RAP OR
EQUIVALENT NATURAL STONE
MINIMUM 30 INCHES THICK
ON FILTER FABRIC
SCALE: NTS
DATE: 5/19/14
SHEET 2 OF 2
DRAWING NO.
ow
r
•
t
•h
z
ILA
LU
ui
FLno■
NO. I DESCRIPTION I DATE
REVISIONS
PLAN DESIGNER:
S•i6 " _
• • • • • • • • • • • • • �!�!�! �!�!�!�!�!�!�!�!�!�!�!�lrl-��l ��1�!!llllllll���lrlllllllllllllllllll!�!�!�!�!�!�!�! !�!�l�l�i�l�l�l�l�l�l�l�l�l��� • • • • • • • • • • • • • , • , • - • • • • • • • , • . • . •'
.............
............. ................
CLASS 1 RIP RAP OR
EQUIVALENT NATURAL STONE
MINIMUM 30 INCHES THICK
ON FILTER FABRIC
REPLACE UNSUITABLE MATERIAL
WITH SURGE STONE OR #3 WASHED STONE
ON FILTER FABRIC
BEDDING 6 INS MI+,%IIMUM
#57 WASHED STOH;IE
CLASS 1 RIP RAP OR
EQUIVALENT NATURAL STONE
MINIMUM 30 INCHES THICK
ON FILTER FABRIC
SCALE: NTS
DATE: 5/19/14
SHEET 2 OF 2
DRAWING NO.
ow