Loading...
HomeMy WebLinkAboutJune 14 Site inspectionWetland Inspection Report Project Num: 20201723 Version: 1 Status: Issued Project Name: NCDOT - Replace Bridge 8 on NC 704 Project Type: Replace bridge with bridge County: Stokes Region: Winston-Salem Location: NCDOT - Replace Bride 8 on NC 704 Latitude: +360 30' 52" Longitude: -80' 18' 11" SW Plan Location: Site Owner Name: NC DOT Division 9 Inspection Date: 6/14/2022 Reason for Inspection: Routine Inspection Type: Site Inspection (DOT) Inspection Contact Person: Title: Phone: On -Site Representative(s): Primary Inspector: Dave Wanucha Phone: 336-776-9703 Secondary Inspector(s): Facility Compliance Status: 0 Compliant ❑ Not Compliant Program Areas: 401 (includes isolated/non-404) Question Areas: Permit (401 WQC) Inspection Summary: page 1 Site Number: 20201723 Owner: Tippett, Lyndo Inspection Date: 6/14/2022 Inspection Type: Site Inspection (DOT) Reason for Visit: Routine Permit (401 WOO Yes No NA NE Does the impact(s) match what was approved in the 401 WQC or non 404 permit? 0 ❑ ❑ ❑ Are the culverts and/or filled areas installed properly? ❑ ❑ 0 ❑ Is the site compliant with additional conditions of the 401 WQC or non 404 permit? 0 ❑ ❑ ❑ Comment: I met with DOT staff and contractors to review progress on bridge construction. Delays have occured due to supply issues. northside bents were installed along with causeway. Staff were instream attempting to make repairs to turbidity curtain that came loose during a storm event and subsequent high flows. No turbidity issues were evident. page 2