Loading...
HomeMy WebLinkAbout20220507 Ver 1_RAI Response Letter_signed_20220602Anchor QEA of North Carolina, PLLC 231 Haywood Street Asheville, North Carolina 28801 828.281.3350 Andrew W. Moore Environmental Specialist II — Asheville Regional Office Water Quality Regional Operations Section NCDEQ — Division of Water Resources 2090 U.S. Hwy. 70 Swannanoa, N.C. 28778 ANCHOR OEA June 2, 2022 Re: Pre -Construction Notification Submittal for Culvert Installation and Sewer -line Crossing Response to Request for Additional Information Given Highland Farms — Campus Redevelopment Phase 2 Project Buncombe County, North Carolina Dear Mr. Andrew Moore, On March 30, 2022, Anchor QEA of North Carolina, PLLC (Anchor QEA) submitted a pre -construction notification (PCN) on behalf of Givens Highland Farms, LLC (GHF) for the above -referenced project for proposed work including a culvert installation and sewer -line crossing, under Nationwide Permit (NWP) 29. One copy of the PCN was also submitted via the electronic ePCN form to the North Carolina Department of Environmental Quality, Division of Water Resources, as required by Water Quality General Certification No. (GC) 4256. In supplication to the PCN, please find the responses to your request for additional information (RAI) terms, as received by Anchor QEA on April 25, 2022 (Attachment A). Your RAI was supplemented by a May 2, 2022, email from Amanda (Fuemmeler) Jones of United States Army Corps of Engineers with an additional request (Attachment B). On behalf of GHF, Anchor QEA provides the following responses. DWR Comments Received April 25, 2022: 1. Please provide an agent authorization form from Givens Highland Farms, LLC granting you signature authority. You may find a sample agent authorization form here https://www.saw.usace.army.mil/Portals/59/docs/regulatory/regdocs/Permits/SAMPLE AGENT A UTHORIZATION FORM.pdf .[15A NCAC 02H .0502(a)] Response on Behalf of GHF Please see the attached signed authorization form from Ken Kramer of Givens Highland Farms. June 2, 2022 Page 2 2. Please provide a map that delineates the boundaries of the land proposed to be utilized by the applicant in carrying out the activity; the location, dimensions, and type of any structures erected or to be erected on the lands for use in connection with the activity; and the location and extent of the receiving waters, including wetlands within the boundaries of the lands. [15A NCAC 02H .0502(a)(9)] Response on Behalf of GHF: Please see the included civil construction site plans, with callouts to the above -referenced locations and areas. The boundaries of land to be utilized and receiving waters are shown on the title page Sheet G1.0, the location of impact for the sewer line is shown on Sheets C2.0 and C7.0, and the location of impact for the culvert is shown on Sheets C2.0 and C5.0. There are no wetlands on site and the receiving waters are: an unnamed tributary to the Swannanoa River, North Fork Swannanoa River, and the Swannanoa River. 3. All work in or adjacent to streams shall be conducted so that the flowing stream does not come in contact with the disturbed area. Therefore, dewatering methods will be necessary to temporarily dewater the stream channel during culvert and sewer line installation. Please provide a construction sequence that details the method of dewatering to be utilized at the site and the sequence of construction events to be followed to ensure compliance with this condition. [15A NCAC 02H .0506(b)(3)] Response on Behalf of GHF: A dewatering construction sequence has been added to G2.1. and a detail has been included in Civil Site Sheet C5.3 as detail 3. A note has been added to Sheet G2.0 — Sewer Utility Notes 10. These sheets are included in the Attachment C of selected sheets. Please refer to the redlines on the included sheet set. 4. Please provide a stream restoration detail for proposed temporary stream impact S2. [15A NCAC 02H .0506(b)(3)] Response on Behalf of GHF: Typical trench backfill and stream restoration detail for the impact activities is shown as details 1 and 2 in Civil Site Sheet C7.3 and is included in the Attachment B of Selected Sheets. This activity is also described in the construction sequence on Sheet G2.1. Please refer to the redlines on the included sheet set. June 2, 2022 Page 3 USACE Comment Received May 2, 2022: The application we have does not include any plans showing the proposed impacts which should be included as well. Response on Behalf of GHF: Please see the included civil construction site plans, with callouts to the above -referenced impact locations and areas. The boundaries of land to be utilized during construction are shown on the title page Sheet G1.0, the location of impact for the sewer line is shown on Sheets C2.0 and C7.0, and the location of impact for the culvert is shown on Sheets C2.0 and C5.0. We appreciate your assistance with this project. Please do not hesitate to contact me at rcork@anchorqea.com if you have any questions or need additional information. Sincerely, Robert Cork, PE, MEng Anchor QEA of North Carolina, PLLC Cc: Amanda (Fuemmeler) Jones, United States Army Corps of Engineers Ken Kramer, Givens Highland Farms, LLC Alexandra Baratucci, Anchor QEA of North Carolina, PLLC Enclosures: • Attachment A NCDEQ — Division of Water Resources RAI Email received April 25, 2022 • Attachment B USACE Email Response received May 2, 2022 • Attachment C Agent Authorization Form • Attachment D Selected Sheets from Civil Construction Set, as relevant to the RAI