Loading...
HomeMy WebLinkAboutSW3220302_Plansheet EX01 - Proposed Drainage Area_202206130000 ' /a - -- -- -- FUTURE MANUFACTURING - - BUILDING 12,000 SF \ - 4.775 AC +- DB 2990-6 4 V, \ V �\ co ) - I 1 A d - 86 857 862------ - 56 j 8 a55 FT6 855 854 853 852 DA TOBMP 2.742 AC \ \ 1 19,449 SF DRAINAGE AREA TO BMP ` IMPERVIOUS TO BMP 1.674 AC CROWN ATLANTIC CO. \ \\ 72,929 SF DB 1 1 13-540 �\ w CID �� 1 UNDERGROUND POWER 11 WATERSHED LINE WS-IV CRITICAL GAS LINE CABLE LINE - -----`-- -G LAKE NORMAN LUTHERAN CH. - � SEWER UMP DB 555-731 ASSUME ALL ,w OFFSITE DRAINAGE IS 100% BUA2,11 SF 6 SF w ___­"W7`T_ERSHED LINEmono - ! NOWWON - NOT IN WATERSHED 30.8'� d \ - W ALL -*Now =c� T III / 856 855 53 - ----- ----------- 8 852 851850 849 g54 N I a rz ➢� II I hry i EX. STORM MANHOLE RIM: 846.5 INV IN: 839.5 INV OUT: 839.4 I _/� 1% 847 `_-- � \� I ID m COMMERCIAL BUILDING 6 ONE STORY C > EX. BUILDING = Z I / °' 17,030 SF CO LOADING �LKPIELL OD I O / NEW ADDITION , d 5,203 SF O �m o a 8 d 4 d 4 11 \ 1 847 q� PROP. BYPASSED DRAINAGE AREA = 0.568 AC (24,760 SF) 467 j �ab E PROP. IMPERVIOUS BYPASSED = 0.508 AC (22,148 SF) REA ® PROP. NON -IMPERVIOUS BYPASSED = 0.060 AC (2,612 SF) TRACK 84 B43- monon i •® INLET (TO BE CONVERTED TO CURB T AFTER PH EC) - g5� $43� - GRATE: 843.4' INV: - CURB INLET (TO BE CONVERTED INV:841.1' DRAINAGE AREA TO JUNCTION BOX AFTER PH1 EC) TO BYPASS BMP GRATE: 844.2' INV IN & OUT: 840.8' EX. STORM STRUCTUI RIM: 84� INV IN & OUT: 83E EX. 15" RCP PIPE 60' RIGHT OF WAY PER DEED BOOK 787-339 (30' EACH SIDE OF BOUNDARY) :TAL BUILDING TO REMAIN (DA TO BMP + DA OF BYPASS) THE INVESTMENT CO. DB 2224-807 PB 15-417 IMPERVIOUS SUMMARY ITEM SQUARE FOOT ACRES PERCENTAGE OF TOTAL SITE TOTAL SITE AREA 195,759 SF 4.494 AC N/A EXISTING BUA 50,545 SF 1.16 AC 25.82 % EXISTING BUA TO BE REMOVED 16,572 SF 0.38 AC 8.47 % EXISTING BUA TO REMAIN 33,973 SF 0.78 AC 17.35 % PROP. PARKING 51,222 SF 1.18 AC 26.17 % PROP. SIDEWALK 1,600 SF 0.04 AC 0.82 % PROP. BUILDING 17,203 SF 0.39 AC 8.79 % FUTURE BUA 17,360 SF 0.40 AC 8.87 % PROPOSED BUA 87,385 SF 2.01 AC 44.64 % TOTAL NEW IMPERVIOUS 121,358 SF 2.79 AC 61.99 % IMPERVIOUS NET CHANGE 70,813 SF 1.63 AC 36.17 % TOTAL PERVIOUS 74,401 SF 1.71 AC 38.01 % -- 15" RC EX. WATER INVERT METER GAS LI C BLE LINE 1 11 1 1 1 1 1 -•Q 1 � I �c) rn I 1 o J c �PN 1 c I � 1 � 11 IMPERVIOUS SUMMARY - BMP ITEM SQUARE FOOT ACRES TOTAL SITE AREA 195,759 SF 4.49 AC DRAINAGE AREA 119,449 SF 2.74 AC OFFSITE BUA TO BMP 2,116 SF 0.05 AC ONSITE BUA TO BMP 70,813 SF 1.63 AC TOTAL BUA TO BMP 72,929 SF 1.67 AC ITEM PERCENTAGE BUA % OF SITE AREA 37.25 % BUA % OF DA 61.05 % 1. CONTRACTOR IS FULLY RESPONSIBLE FOR CONTACTING APPROPRIATE PARTIES AND ASSURING THAT EXISTING UTILITIES ARE LOCATED PRIOR TO BEGINNING CONSTRUCTION. 2. CONTRACTOR IS RESPONSIBLE FOR PLACING BARRICADES USING FLAGMEN, ETC., AS NECESSARY TO INSURE SAFETY TO THE PUBLIC. 3. ALL PAVEMENT CUTS, CONCRETE OR ASPHALT, ARE TO BE REPLACED ACCORDING TO STANDARDS OF THE DEPARTMENT OF TRANSPORTATION. 4. SHORING WILL BE ACCORDING TO OSHA TRENCHING STANDARDS PART 1926 SUBPART P, OR AS AMENDED. A Know what's below. Call before you dig. E O U O CO o. CD 01 M �O CN U N0,0 _c WU Lu C? LU U Z 0 3 W W J U > LU U Q ^�^, LU p Q� O U L0 � m W V �� ?_ (\^ U � o w Q Z W i Q 7C) "- 3Q O O WN W Lo Z a U r U O Lrj J � 00 O Q I� Q LU 0 LU Z � Z Q LU w LU L.L LU 1-0 > r n v W 0 I..L J W V) � W LU � z � Q Q W m ^/ 1._L Z 0 W 0 � z CL r�' REVISIONS: A2022-3-29 1ST EC REVIEW 2 2022-5-13 NCDEQ COMMENTS 3 2022-6-9 NCDEQ COMMENTS POST -DEVELOPMENT DA.DWG PROJECT NUMBER: 221011 DATE: 2/4/2022 DRAWN BY: KIW EXO1 12 SHEET OF POST -DEVELOPMENT DA.DWG - PLOT: Kennedy - THU. 6-9-2022 2:41 PM