Loading...
HomeMy WebLinkAboutSW3220302_Plansheet C09 - Misc. Detail_20220601SKIMMER SEDIMENT BASIN DESIGN CRITERIA DRAINAGE AREA < 10 AC. ACRES) IN. LENGTH TO 2:1 WIDTH RATIO MAX. LENGTH TO 6.1 WIDTH RATIO PLAN VIEW NOTES: 1. REFER TO NCESCPDM SECTION #6.64 FOR ADDITIONAL DESIGN EMBANKMENT SPECIFICATIONS LENGTH REGARDING SKIMMER SEDIMENT BASINS. 2. REFER TO STD. #30.19 INFLOW 10, FOR BAFFLE SPACING MIN. AND INSTALLATION 3. TURBIDITY CURTAIN (CLDS #30.23) MAY BE USED IN LIEU OF SKIMMER POROUS BAFFLES (CLDS DEWATERING #30.19). MIN. 1800 AVERAGE AREA* DEVICE VOLUME = 4. SKIMMER INVERT WIDTH LENGTH REQUIRED PER C. PER AC. EMERGENCY ELEVATION = BASIN DISTURBED) * AREA OF BASIN WATER SPILLWAY BOTTOM FE V MIN. SURFACE AT TOP OF PRIMARY SPILLWAY L 5. H = SPILLWAY 325 ELEVATION - SKIMMER SURFACE (gQ_ FT. INVERT ELEVATION AREA PER CFS REQUIRED Q10) CROSS-SECTION VIEW BAFFLES (GI DATA BLOCK L BASIN DRAINAGE AREA ACRES) DENUDED AREA (ACRES) QTo BASIN VOLUME BASIN SURFACE AREA CLEANOUT DEPTH (FT.) H/2 H (FEET) Z (FEET) (FEET)(FEET) LA(Fl) W SKIMMER DIAMETER SKIMMER DIAMETER REQUIRED (CUBIC FT.) PROVIDED (CUBIC FT.) REQUIRED (SQ FT.) PROVIDED (SQ FT.) 2.34 2.03 6.6 3,654 5,679 2,157 3,538 1.25 3.5 5 10 10 2 1.4 N-1 SKIMMER SEDIMENT BASIN ARM ASSEMBLY "C" ENCLOSURE WATER ENTRY UNIT PERSPECTIVE VIEW PVC VENT SCHEDULE 40 PVC ELBOW PIPE PVC PIPE PVC END CAP-, WATER SURFACE o PVC END CAP PVC PIPE X 1 112" HOLES IN N PVC TEE UNDERSIDE 51 PVC TEE PLATE ORIFICE FLEXIBLE f HOSE SCHEDULE 40 0 PVC PIPE END VIEW FRONT VIEW SCHEMATIC OF SKIMMER TAKEN FROM PENNSYLVANIA EROSION AND SEDIMENT POLLUTION CONTROL MANUAL, MARCH 2O00. "I" REFERS TO THE HEIGHT FROM INVERT OF FLEXIBLE HOSE ON SKIMMER TO THE INVERT OF THE PRIMARY SPILLWAY. NOT TO SCALE SKIMMER STD. N0. REV. 30.02E 12 STEEL POST 4' MAX. I WIRE FENCING WASHED STONE HARDWARE CLOTH (NCDOT #5 OR #57) BETWEEN POSTS ZZ / (IF APPLICABLE) AND COVERED BY STONE STEEL POST °<G C f0^> HARDWARE CLOTH WOVEN FILTER FABRIC `tit 2� WASHED STONE GENERAL NOTES: \ / WASHED SrQNe / (NCDOT #5 OR #57) 1. SEDIMENT SHALL BE REMOVED AND TRAP #5 RESTORED TO ITS ORIGINAL DIMENSIONS - - - - - - - - - - - - - - - __ - III=III=III=III=III=III=III=III=III=III=III=III=III=III=III=1 = _ SLOW WHEN THE SEDIMENT HAS ACCUMULATED \ A 1 III III =1I 1=1I 1=1I1=1I -III II III III III -III -III -III -III -III III III III III III -III II 1=1I 1=1I1=1I1=1 I1=1 I1=1 1=1 1=1 1=1 1=1 1=1 1=1I 1=1I 1=1I1=1 -III -III- 1=1 1=ll - - p-- TO 1/2 THE DESIGN DEPTH OF THE TRAP. sroRAGE AREA A = I -III -III I -III -III -III -III -III -III -III -III -III -III -III -III -III -III I III=III Ill III=III=III=III=III=III=1�1=1�1=1�1=III=III=III=III=III=1 -1�1=III=_I -III -III- w uo - II ITI-I ' LL 2 REMOVED SEDIMENT SHALL BE DEPOSITED „III - -�I-ICI - -III-III=III=III-1' -III-III-III=III=III=III=III-III= -III-' IN A SUITABLE AREA AND IN SUCH A 00 -III-III-III -IiI-III-� L=1�1-' - MANNER THAT IT WILL NOT ERODE. ANCHOR SKIRT; o 0 EXCAVATE TRENCH AND COMPACT 3. THE STRUCTURE SHALL BE INSPECTED BY o 0 o 0 SACKFUL THE FINANCIALLY RESPONSIBLE PARTY OR STORAGE AREA o HIS AGENT AFTER EACH STORM EVENT R. CATCH AND REPAIRS MADE AS NECESSARY. BASIN 4. CONSTRUCTION OPERATIONS SHALL BE CARRIED \J OUT IN SUCH A MANNER THAT EROSION AND Cf WATER POLLUTION ARE MINIMIZED. GENERAL NOTES: MAINTENANCE NOTES: 5. THE SEDIMENT TRAP SHALL BE REMOVED AND THE AREA STABILIZED WHEN THE DRAINAGE 1. SEDIMENT FILTER OUTLET AND HARDWARE CLOTH SHALL BE 16 INCHES HIGH BUT NO 1. FILTER OUTLETS SHALL BE INSPECTED BY THE FINANCIALLY RESPONSIBLE PARTY OR HIS AGENT IMMEDIATELY AFTER EACH RAINFALL AND LEAST DAILY DURING BASIN HAS BEEN PROPERLY STABILIZED. TALLER THAN 18 INCHES. B PROLONGED RAINFALL. ANY REPAIRS NEEDED SHALL BE MADE IMMEDIATELY. PLAN VIEW 2. HARDWARE CLOTH SHALL BE ANCHORED TO THE STEEL POSTS SECURELY USING 6. ON LARGER DRAINAGE AREAS RIP RAP MAY APPROPRIATE ANCHORS. HARDWARE CLOTH SHALL BE KEYED IN A MINIMUM OF 12 INCHES 2. THE STONE SHALL BE REPLACED PROMPTLY AFTER ANY EVENT THAT HAS CLOGGED BE REQUIRED UNDER THE WASHED STONE. / I 1 IN LENGTH AND BACKFILLED PROPERLY AS SHOWN IN ABOVE DETAIL. HARDWARE CLOTH TO OR REMOVED IT. BE SAME AS STD. #30.09 (19 GAUGE, 1/4" SPACING). 3. POSTS SHALL BE NO MORE THAN 4 FEET APART. 3. SEDIMENT DEPOSITS SHOULD BE REMOVED WHEN DEPOSITS REACH HALF THE HEIGHT OF THE BARRIER. ANY SEDIMENT DEPOSITS REMAINING IN PLACE AFTER THE SILT $5 WASHED STONE a Q 4. SITE OUTLETS AT ANY POINT SMALL CONCENTRATED FLOWS ARE ANTICIPATED AND AT THE FENCE OUTLET IS REMOVED SHALL BE DRESSED TO CONFORM TO THE EXISTING GRADE, PREPARED AND SEEDED. _ FLOW Dc ly DIRECTION OF THE INSPECTOR. Alm 12" MIN. LIP" IIFIII=' ":y�l CATCH BASIN 3'-4' SECTION A -A SILT FENCE OUTLET INLET ZONE 25% OF SURFACE AREA 30.06C INLET ZONE 25% GENERAL NOTES: T OF SURFACE AREA 1. DRIVE 5' STEEL POST AT LEAST y OUTLET ZONE 25% 24" INTO SOLID GROUND. OF SURFACE AREA 2. USE STAPLES 1' APART HORIZONTALLY AND VERTICALLY TO ATTACH THE FILTER FABRIC \ �'V\Q / X TO THE WIRE FENCE. 1 3. MINIMUM BAFFLE SPACING IS 10'. FLOW \ X 4. THE FLOOR OF THE BASIN IN THE OUTLET ZONE AND BERMS \ ' SHOULD BE SEEDED o IMMEDIATELY AFTER THE BASIN i o IS CONSTRUCTED. / eAR%/1 5. REFER TO NCESCPDM SECTION l / BERM X #6.65 FOR SPECIFIATIONSDITION AL /x 4'-0" MAX. SPACING X =x (TYPICAL) 700 g/m' 5' STEEL COIR FABRIC OR EQUIVALENT FL 8" X 6' TRENCH BACKFILL AND COMPAC FENCE AND FABRIC BURIED IN TRENCH LENGTH AS NECESSARY TO GO THRU DIKE 4' MIN. PIPE 1.5' MIN. 12 FLEXIBLE PIPE TIE DOWN 10' MAX. SPACING TIE DOWN AT END _ _I DIAMETER (D) PROFILE * AT LESS THAN 1% SLOPE RIP -RAP -� 0I ToH NOT TO SCALE BAFFLE INSTALLATION STD REV. 30.19 115 RIP RAP & WASHED STONE FILTER BERM (OLDS 30A 2) = )IMENT PIT * * * I, I EA I' RTH DIKE NOT TO SCALE STONE INLET PROTECTION STD NG REV. 30.08 KEY/ANCHOR MATERIAL AT TOP OF SLOPE. JERAL NOTES: LAY BLANKETS LOOSELY AND STAKE OR STAPLE TO MAINTAIN DIRECT CONTACT WITH THE SOIL DO NOT STRETCH. * DIMENSIONS SHOWN ARE MINIMUM, MANUFACTURED PRODUCTS MAY HAVE ADDITIONAL REQUIREMENTS THAT MUST BE M ET. SLOPE SURFACE SHALL BE FREE OF ROCKS, SOIL CLODS, STICKS, GRASS. MAT/BLANKETS SHALL HAVE GOOD SOIL CONTACT. THE DETAIL SHOWN IS FOR SLOPE MATTING. FOR CHANNEL OR PIPE OUTFALL MATTING SPECIFICATIONS, PLEASE REFER TO NCESCPDM STANDARD #6.17 AND MANUFACTURER'S GUIDELINES. I FABRIC 4' ABOVE SOURCE WATER. KEY/ANCHOR MATERIAL TO TOE OF SLOPE. EMBANKMENT MATTING DETAIL NOTES: 1. CLASS OR MEDIAN SIZE OF RIPRAP AND LENGTH, WIDTH AND DEPTH OF APRON TO BE DESIGNED BY THE ENGINEER. SEDIMENT PIT NOT REQUIRED IF BASIN 2. REFER TO THE CHARLOTTE MECKLENBURG STORM WATER DESIGN MANUAL FOR RIPRAP IS LOCATED DOWNSTREAM APRON DESIGN STANDARDS. OF PIPE OUTLET. (VOLUME PER OLDS 30.12) 3. RIPRAP SHOULD EXTEND UP BOTH SIDES OF THE APRON AND AROUND THE END OF THE PIPE OR CULVERT AT THE DISCHARGE OUTLET AT A MAXIMUM SLOPE OF 2:1 AND A HEIGHT NOT LESS THAN TWO THIRDS THE PIPE DIAMETER OR CULVERT HEIGHT. 4. THERE SHALL BE NO OVERFLOW FROM THE END OF THE APRON TO THE SURFACE OF THE RECEIVING CHANNEL. THE AREA TO BE PAVED OR RIPRAPPED SHALL BE UNDERCUT SO THAT THE INVERT OF THE APRON SHALL BE AT THE SAME GRADE (FLUSH) WITH THE SURFACE OF THE RECEIVING CHANNEL. THE APRON SHALL HAVE A CUTOFF OR TOE WALL AT THE DOWNSTREAM END. 5. THE WIDTH OF THE END OF THE APRON SHALL BE EQUAL TO THE BOTTOM WIDTH OF THE RECEIVING CHANNEL. MAXIMUM TAPER TO RECEIVING CHANNEL 5:1. 6. ALL SUBGRADE FOR STRUCTURE TO BE COMPACTED TO 95% OR GREATER. 7. THE PLACING OF FILL, EITHER LOOSE OR COMPACTED IN THE RECEIVING CHANNEL SHALL NOT BE ALLOWED. EXTEND TO EDGE OF DISTURBANCE - CONSTRUCTION SPECIFICATIONS: 1. THE TOP OF THE EARTH DIKE OVER THE INLET PIPE AND THOSE 4. THE SOIL AROUND AND UNDER THE INLET PIPE AND ENTRANCE DIKES CARRYING WATER TO THE PIPE SHALL BE AT LEAST 1.5 FEET SECTION SHALL BE HAND TAMPED IN 4" LIFTS TO THE TOP OF HIGHER AT ALL POINTS THAN THE TOP OF THE INLET PIPE. THE EARTH DIKE. 2. THE PIPE SHALL BE FLEXIBLE WITH WATER TIGHT CONNECTING 5. FOLLOW-UP INSPECTION AND ANY NEEDED MAINTENANCE SHALL BANDS. FLEXIBLE PIPE SHOULD BE STAKED ON EITHER SIDE. BE PERFORMED AFTER EACH STORM BY THE FINANCIALLY RESPONSIBLE 3. A RIP RAP APRON SHALL BE PROVIDED AT THE OUTLET, IF PARTY OR HIS AGENT. EMPTYING INTO A DISTURBED AREA. 6. OUTLET PIPE SHOULD BE TAKEN OVER OR THROUGH ANY SILT FENCE, TAKING CARE NOT TO VOID THE EFFECTIVENESS OF THE SILT FENCE. NOT TO SCALE FLEXIBLE PIPE SLOPE DRAIN 30.04 ► olm[emay-11■1 30.20 8. NO BENDS OR CURVES IN THE HORIZONTAL ALIGNMENT OF THE APRON WILL BE PERMITTED. PLAN 9. FILTER FABRIC SHALL BE INSTALLED ON COMPACTED SUBSTAGE PRIOR TO PLACEMENT OF RIP RAP. 10. ANY DISTURBED AREA FROM END OF APRON TO RECIEVING CHANNEL MUST BE STABILIZED. D'e sLDPE_ II®II®II®III®II®II®II�IIF_illl==1111= USE USDA NOMOGRAPH FROM NO SEDIMENT AND EROSION CONTROL MANUAL OR CHARLOTTE MECKLENBURG STORM WATER DESIGN MANUAL FOR DESIGN DATA. _ _ - --IRIIII II®LIE IN_ ®II€ RIP RAP SUMMARY CHART OUTLET La W1 W2 T* H EX. FES 10 11.25 3.75 0.9 0.9 1 -6 FILTER FABRIC LAP (IF NEEDED) ELEVATION NATURAL GRADE m �I M RIP RAP A=_ I H 13II �I � ITS null 1 T (THICKNESS) NOTE: LAYER OF FILTER FABRIC MINIMUM H-2/3 PIPE DIAMETER * d50 (see fig 8.06 a&b "NC SEDIMENT AND EROSION CONTROL MANUAL" dmax = 1.5 = d50 APPROVED DATE I 02/2007 SECTION B-B T = 1.5 X dmax. RIP RAP APRON AT PIPE OUTEALES OTHER THAN AT SWIM STD. REV. 20.23 GENERAL NOTES: 1. AREA UNDER EMBANKMENT SHALL BE CLEARED, GRUBBED, AND STRIPPED OF ANY VEGETATION AND ROOT MATERIAL. THE BASIN AREA SHALL BE CLEARED. 2. THE FILL MATERIAL FOR THE EMBANKMENT SHALL BE FREE OF ROOTS OR OTHER WOODY VEGETATION AS WELL AS OVERSIZED STONES ROCKS ORGANIC MATERIAL OR OTHER OBJECTIONABLE MATERIAL. THE EMBANKMENT SHALL BE COMPACTED BY TRAVERSING WITH EQUIPMENT WHILE BEING CONSTRUCTED. SPILLWAYS SHOULD NOT BE CONSTRUCTED THROUGH FILL SECTIONS. ALL SPILLWAYS SHOULD BE LINED AND/OR RIPRAPPED. 3. SEDIMENT SHALL BE REMOVED AND TRAP RESTORED TO ITS ORIGINAL DIMENSIONS WHEN THE SEDIMENT HAS ACCUMULATED TO DEPTH SHOWN ON STANDARD. REMOVED SEDIMENT SHALL BE DEPOSITED IN A SUITABLE AREA IN SUCH A MANNER THAT IT WILL NOT ERODE. 4. THE TRAP SHALL BE INSPECTED AFTER EACH RAIN AND REPAIRS MADE AS NECESSARY. 5. CONSTRUCTION OPERATION SHALL BE CARRIED OUT IN SUCH A MANNER THAT EROSION AND WATER POLLUTION IS MINIMIZED. 6. ALL CUT AND FILL SLOPES SHALL BE 2:1 OR FLATTER, UNLESS CERTIFIED BY REGISTERED GEOTECHICAL ENGINEER. 7. SEDIMENT BASIN EMBANKMENTS SHOULD BE PROVIDED WITH EROSION CONTROL AND STABILIZATION. 8. STORAGE AREA MAY BE CONSTRUCTED IN ANY SHAPE PROVIDED THE MINIMUM STORAGE VOLUME REQUIREMENT IS MET. THE BASIN SHOULD ALSO BE ORIENTED SUCH THAT THE FILTER AND THE MAIN FLOW OF WATER AND SEDIMENT ARE ON OPPOSITE ENDS ON THE LONGER BASIN DIMENSIONS. 9. THE LENGTH OF THE STONE OUTLET (SPILLWAY) IS TO BE BASED ON A 10 YEAR STORM. 10. WHENEVER TOPOGRAPHY ALLOWS, THE BASIN LENGTH SHOULD BE TWICE (2X) THE BASIN WIDTH, TO ALLOW FOR SETTLING. BAFFLES SHALL BE INSTALLED IN ALL BASINS. IT. CLEANOUT STAKES SHALL BE PLACED IN ALL SEDIMENT BASINS AT THE LOW POINT IN THE BASIN. THE STAKES SHALL BE MARKED SHOWING THE HALF FULL, CLEANOUT POINT, OF THE BASIN. 12. SAFETY FENCING 3' HIGH SHOULD BE PLACED AROUND ALL SEDIMENT BASINS. 13. FOR DESIGN OF SEDIMENT BASINS, REFER TO THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES, EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL. 14. FOR SLOPES GREATER THAN 10' IN LENGTH AND PROTECTED BY SILT FENCE AT THE TOE OF THE SLOPE, SLOPE TERRACING WILL BE REQUIRED. 15. THE BERM ON SEDIMENT BASINS SHALL BE SEEDED ONCE FINAL GRADE HAS BEEN REACHED. THE SILT FENCE MAY BE REMOVED IF PERMISSION HAS BEEN GRANTED BY THE CITY LAND DEVELOPMENT INSPECTOR AFTER THE GRASS HAS GERMINATED AND STABLE GROUND HAS BEEN ESTABLISHED. 16. WASHED STONE AND WIRE BACKING SHALL BE USED WITH SILT FENCE WHENEVER SILT FENCE IS PLACED AT THE TOE OF A SLOPE >10' VERTICAL OR ALONG ANY CHANNEL OR WATER COURSE GENERAL_ NOTES -SEDIMENT BASINS GENERAL NOTES: 1. RIPRAP SIZE TO BE DESIGNED BY ENGINEER. 2. CHECK DAMS MAY BE USED IN SLOPING DITCHES OR CHANNELS TO SLOW VELOCITY OR TO CREATE SEDIMENT TRAPS. 3. ENSURE THAT MAXIMUM SPACING BETWEEN DAMS PLACES THE TOE OF THE UPSTREAM DAM AT THE SAME ELEVATION AS THE DOWNSTREAM DAM (SEE DIAGRAM BELOW). CLASS B RIP nI-III_ = A� MAXIMUM SPACING _ B III_III]II_III_III= _ - JI_IIL111=III=III=III_IIL _11=III_III_ 11L111_III=III= A AND B ARE AT EQUAL ELEVATIONS PLAN CROSS SECTION 1 30.03E3 ONE IAX NTER NOT TO SCALE TEMPORARY ROCK CHECK DAM STD. NQ REV. 30.10A 115 NOTES: 1. A STABILIZED ENTRANCE PAD OF 2-3" OF WASHED STONE AND/OR RAILROAD BALLAST SHALL BE LOCATED WHERE TRAFFIC WILL ENTER OR LEAVE THE CONSTRUCTION SITE ONTO A PUBLIC STREET. 2. FILTER FABRIC OR COMPACTED CRUSHER RUN STONE SHALL BE USED AS A BASE FOR THE CONSTRUCTION ENTRANCE. 3. THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR FLOWING OF SEDIMENT ONTO PUBLIC STREETS OR EXISTING PAVEMENT. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH ADDITIONAL STONE AS CONDITIONS WARRANT AND REPAIR OR CLEANOUT OF ANY MEASURES USED TO TRAP SEDIMENT. 4. ANY SEDIMENT SPILLED, DROPPED, WASHED, OR TRACKED ONTO PUBLIC STREETS MUST BE REMOVED IMMEDIATELY. ANY AGGREGATE TRACKED INTO THE ROADWAY MUST BE SWEPT BACK ONSITE ON A NIGHTLY BASIS. 5. WHEN APPROPRIATE, WHEELS MUST BE CLEANED TO REMOVE SEDIMENT PRIOR TO ENTERING A PUBLIC STREET. WHEN WASHING IS REQUIRED, IT SHALL BE DONE IN AN AREA STABILIZED WITH CRUSHED STONE WHICH DRAINS INTO AN APPROVED SEDIMENT BASIN SEE STD. NO. 30.11B. 6. CDOT MAY REQUIRE A STANDARD COMMERCIAL DRIVEWAY (STD. 10.24 & 10.25) TO ACCESS THE CONSTRUCTION SITE IF THE DRIVEWAY IS ON A THOROUGHFARE, OR ON ANY STREET WITH AN EXISTING SIDEWALK TO REMAIN OPEN DURING CONSTRUCTION. 7. FOLLOW WORK AREA TRAFFIC CONTROL HANDBOOK (WATCH) FOR SIDEWALK CLOSURE OR DETOUR/DIVERSION. 0 EXISTING GROUND SOIL STABILIZATION FABRIC UNDER 2-3" OF WASHED STONE PUBLIC STREET Ex. CONC. DRIVEWAY APRON WITH SIDEWALK AT BACK OF CURB (IF RETAINED DURING CONSTRUCTION.) w U m d NOT TO SCALE STABILIZED CONSTRUCTION ENTRANCE STD NO REV. 30.11A 115, 6' MAX. WOVEN FILTER FABRIC ,o STEEL POST FFLOWILTER FABRIC u=Q C O S F 4" ANCHOR SKIRT; EXCAVATE TRENCH AND COMPACT BACKFILL GENERAL NOTES: 1. WOVEN FILTER FABRIC BE USED WHERE SILT FENCE IS TO REMAIN FOR A PERIOD OF MORE THAN 30 DAYS. 2. STEEL POSTS SHALL BE 5'-0" IN HEIGHT AND BE OF THE SELF -FASTENER ANGLE STEEL TYPE. MAINTENANCE NOTES: 3. TURN SILT FENCE UP SLOPE AT ENDS. 1. FILTER BARRIERS SHALL BE INSPECTED BY THE FINANCIALLY RESPONSIBLE PARTY 4. ORANGE SAFETY FENCE IS REQUIRED AT BACK OF SILT FENCE WHEN GRADING IS OR HIS AGENT IMMEDIATELY AFTER EACH RAINFALL AND AT LEAST DAILY DURING PROLONGED RAINFALL. ANY REPAIRS NEEDED SHALL BE MADE IMMEDIATELY. ADJACENT TO SWIM BUFFERS, STREAMS OR WETLANDS (REFER TO SWIM BUFFER GUIDELINES). THE COLOR ORANGE IS RESERVED FOR VISUAL IDENTIFICATION OF 2. SHOULD THE FABRIC DECOMPOSE OR BECOME INEFFECTIVE PRIOR TO THE END ENVIRONMENTALLY SENSITIVE AREAS. OF THE EXPECTED USABLE LIFE AND THE BARRIER STILL IS NECESSARY, THE FABRIC SHALL BE REPLACED PROMPTLY. 5. DRAINAGE AREA CAN NOT BE GREATER THAN 1/4 ACRE PER 100 FT OF FENCE. 3. SEDIMENT DEPOSITS SHOULD BE REMOVED WHEN DEPOSITS REACH APPROX. HALF 6. SLOPE LENGTHS CAN NOT EXCEED CRITERIA SHOWN IN TABLE 6.62A NORTH CAROLINA THE HEIGHT OF THE BARRIER. ANY SEDIMENT DEPOSITS REMAINING IN PLACE EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL. AFTER THE SILT FENCE IS REMOVED SHALL BE DRESSED TO CONFORM TO THE EXISTING GRADE, PREPARED AND SEEDED. 7. DO NOT INSTALL SEDIMENT FENCE ACROSS STREAMS, DITCHES, WATERWAYS OR OTHER AREAS OF CONCENTRATED FLOW. NOT TO SCALE TEMPORARY SILT FENCE STD. NO. REV. 30.06A 1 5 FOR LATE WINTER AND SOIL AMENDMENTS: EARLY S P R N O: FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2,000 LB/ACRE GROUND AGRICULTURAL LIMESTONE AND 750 LB/ACRE 10-10-10 FERTILIZER SEEDING MIXTURE: MULCH: RYE (GRAIN) - 120 LB/ACRE APPLY 4,000 LB/ACRE STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH ANNUAL LESPEDEZA (KOBE) - 50 LB/ACRE ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING (OMIT ANNUAL LESPEDEZA WHEN DURATION TOOL OF TEMPORARY COVER IS NOT TO EXTEND BEYOND JUNE) MAINTENANCE: REFERTILIZE IF GROWTH IS NOT FULLY ADEQUATE. RESEED, FERTILIZE AND MULCH IMMEDIATELY FOLLOWING SEEDING DATES: EROSION OR OTHER DAMAGE JAN. 1 - MAY 1 FOR SUMMER, SOIL AMENDMENTS: FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2,000 LB/ACRE GROUND AGRICULTURAL LIMESTONE AND 750 LB/ACRE 10-10-10 FERTILIZER SEEDING MIXTURE: GERMAN MILLET - 40 LB/ACRE MULCH: (A SMALL -STEMMED SUDANGRASS MAY BE APPLY 4,000 LB/ACRE STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH SUBSTITUTED AT A RATE OF 50 LB/ACRE) ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL SEEDING DATES: MAY 1 - AUG. 15 MAINTENANCE: REFERTILIZE IF GROWTH IS NOT FULLY ADEQUATE. RESEED, FERTILIZE AND MULCH IMMEDIATELY FOLLOWING EROSION OR OTHER DAMAGE r FOR ALL: SOIL AMENDMENTS: /-1 FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2,000 LB/ACRE GROUND AGRICULTURAL LIMESTONE AND 1,000 LB/ACRE 10-10-10 FERTILIZER SEEDING MIXTURE: RYE (GRAIN) - 120 LB/ACRE MULCH: APPLY 4,000 LB/ACRE STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH SEEDING DATES: ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING AUG. 15 - DEC 30 TOOL MAINTENANCE: REPAIR AND REFERTILIZE DAMAGED AREAS IMMEDIATELY. TOPDRESS WITH 50 LB/ACRE OF NITROGEN IN MARCH. IF IT IS NECESSARY TO EXTEND TEMPORARY COVER BEYOND JUNE 15, OVERSEED WITH 50 LB/ACRE KOBE LESPEDEZA IN LATE FEBRUARY OR EARLY MARCH. FOR ADDITIONAL INFORMATION, REFER TO NCDENR EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL (ESCPDM), SECTION 6.10. FOR PERMANENT SEEDING SPECIFICATIONS, INCLUDING SEED BED PREP, SEASONAL LIMITATIONS FOR SEEDING OPERATIONS, THE KINDS OF GRADES OF FERTILIZERS, THE KINDS OF SEED, AND THE RATES OF APPLICATION OF LIMESTONE, FERTILIZER, AND SEED, REFER TO NCDENR ESCPDM SECTION 6.11 AND THE CHARLOTTE LANDSCAPE CONSTRUCTION STANDARDS SECTION 04200 SEEDING AND SODDING OF TURFGRASS. TEMPORARY SEEDING SCHEDULE STD N0 REV. 11 30.17 9 1" REBAR FOR BA - REMOVAL FROM INLI (REBAR NOT INCLUDE[ OPTIONAL OVERFLOW SILTSACK DUMP LOOPS (REBAR NOT INCLUDED) CF�cTti, a a o 4 C d a a v 0 USE SILT SACKS ON ALL INLETS CURB OPENING EXPAI R ES WIDTH = W SIDE VIEW INSTALLED SILTSACK® SPECIFICATIONS NOTE: THE SILTSACK@ WILL BE MANUFACTURED FROM A WOVEN POLYPROPYLENE FABRIC THAT MEETS OR EXCEEDS THE FOLLOWING SPECIFICATIONS. HI -FLOW SILTSACK® (FOR AREAS OF MODERATE TO HEAVY PRECIPITATION AND RUN-OFF) PROPERTIES TEST METHOD UNITS GRAB TENSILE STRENGTH ASTM D-4632 265 LBS GRAB TENSILE ELONGATION ASTM D-4632 20 % PUNCTURE ASTM D-4833 135 LBS MULLEN BURST ASTM D-3786 420 PSI TRAPEZOID TEAR ASTM D-4533 45LBS UV RESISTANCE ASTM D-4355 90 % APPARENT OPENING SIZE ASTM D-4751 20 US SIEVE FLOW RATE ASTM D-4491 200 GAL/MIN/SQ FT PERMITTIVITY ASTM D-4491 1.5 SEC -1 DETAIL OF INLET SEDIMENT CONTROL DEVICE WITH CURB DEFLECTOR OIL-ABSORBANT SILTSACK® (FOR AREAS WHERE THERE IS A CONCERN FOR OIL RUN-OFF OR SPILLS) DEPENDING ON YOUR PARTICULAR APPLICATION, THE SILTSACK& CAN BE MADE FROM EITHER ONE OF THE ABOVE FABRICS WITH AN OIL-ABSORBANT PILLOW INSERT OR, MADE COMPLETELY FROM AN OIL-ABSORBANT SILTSACK, WITH A WOVEN PILLOW INSERT. SILTSACK - INLET PROTECTION N.T.S. E O U 0 c O - 00 O P >O CD � 1? � 0) U M W Lu z 3 UZ 0 > �3 3 W W J U 0 No < - U _ O J Ql no CD Q o O � mW Z 2 U O ZQ Li Q (� a Q w N Q ) •• U Z V Q J r N Z � r L6 ___J co Q CA �-••• •L-PNDS • A •� / D m . v 5//3/2022.•\� \� IIII11 ('7 ujCo O � 00 N U z�1 z W Lo �/ W I U- W In O > Q W ui W w ' J W to W Q W v, > ^a u I..L Z w Lu z U 0 � Z REVISIONS: A2022-3-29 1ST EC REVIEW -5-13 NCDEQ COMMENTS a2022 C09 - DETAILS.DWG PROJECT NUMBER: 221011 DATE: 2/4/2022 DRAWN BY: KIW 12 SHEET C09 OF C09 - DETAILS.DWG - PLOT: Kennedy - TUE. 5-24-2022 3:11 PM