Loading...
HomeMy WebLinkAboutSW3220302_Plansheet C06 - Grading_Drainage Plan_20220601\ PROP. RETAINING WALL - (BY OTHERS) TOW: 861.09 i 04-CB I , 11 RIM: 856.31 BOW: 857.17 PROP. 4" TRENCH DRAIN i BOW: 857.171 ALONG BACK OF SIDEWALK UNDISTURBED BUF IE 857.25 ADJACENT TO WALL. TIE INTO TOW:860.80 TOW:860.87 04-CB FUTURE MANUFACTURING BOW: 86047 BUILDING 12,000 SF . BOW: 860.80 - 857.25 859.22 - 4.775 AC - ' DB 2990-6 4 FFE: 857.25 OD O V m 859.62 �s 859.22 00 n � CD_ 857,05 857.25 857.25 857.25 n w - `, r' 856.71 57.17 857.17 857.17 N 856.71 T _ \ 8° i 857.17 , 857.43 �� _ 857.09 857.09° 856.59 C' 856.68 856.59 � n 856.59 856.59 856.01 ` S - 856.59 856.63 856.23 856 PIP \ 856.65 857 856.63 856.19 v - \ FLUSH 856.02 855.98 I 856.46 856.38 2% MAX. SLOPE ALL DIRECTIONS 854.64 g56 ACROSS ADA SPACES \ g55 �6p 856.14 8 - s 856.12 S) 856 PIPE 02CB-03CB 212 LF OF 15" CLASS III RCP 855.99 \ 856356 855 \03-CB FT / 854 853 B52 851 8 \ 02 CB ` RIM:855.37 ` 849 848 RIM:854.12� \ PIPE 01 FES-02CB 38 LF OF 24" CLASS III RCP, 8-RING / \ ` / 01-FES INV IN:842.10 (02-CB) \ UNDISTURBED TREE LINE CROWN ATLANTIC CO. (TYP.)\\ RIP -RAP ENTIRE DB 1 1 13-540 BOTTOM OF FOREBAY UNDISTURBED BU ER `M ACCESS EASMENT RIM REFERENCE POINT DISTURBED LIMITS \ �_ D 2.69 AC STORMWATER DETENTION / SAND FILTER WATERSHED LINE UNDERGROUND POWER \ WS-IV CRITIC GAS LINE CABLE LINE � - ----`-� LAKE NORMAN LUTHERAN CH. �- - SEWER UMP DB 555-731 EX. ROOF LEADER FOR EX. BUILDING/yam. w TO BE RE-ROUTED TO TIE INTO 06-CB AS SHOWN _- w \ \ / NOT IN WATERSHED \ / UNDISTURBED TREE LINE 30.8'X ° (TYP.) 20' EX. UNDISTURBED 68.4' a / 06 CB BUFFER ° \ 7-- ' RIM:846.60 A / BOW:858.66 g56 855 854 g53 52 � ° \ 1 III a - - 850.0� 8 g50 g49 8 849.28 / 853.26 849.66 I I\ 850.43 2' WIDE CONCRETE 853.77 35 \ CHUTE 850.850.01 \ 853.90 co (10 \ h 854.27 PIPE 05CB-06CB 112 LF OF 15" CLASS IV RCP, O-RING 851.57 \/`PD 851.64 `b y0, ti 851.27 847.82 854.00 � w`' 10 851.33 850.78 ��0 849.73 w�Q � 847.53 57.16 `bV 850.86 849.29 I 853.55 � - X. STORM MANHOLE 849.64 849.31 RIM! 8.46.6 850.30 INV IN: 39.5 INV OUT8:839.4 \ / �� Y Lrn PROP. 4" TRENCH DRAIN 847 AT BOTTOM OF LOADING DOCK RY COMMERCIAL BUILDING FFE: ➢ \ III 847 18 �� (TIE INTO EX. STORM SYSTEM) ONE STORY � �0 EX. BUILDING z Z 0co 00 17,030 SF _ LOADINGK WELL - 847.40 1 1 1 1 15" RCP EX. WATER INVERT: 8 METER GAS LINE 1 1 1 1 C BLE LINE 1 1 1 1 � 1 1 1 1 1 1 � 1 ➢p -V -7 I l , 1 m O p- �JGN 1 1 �` 11 /INVEIT:8`3.1'\ 1 _ c - � 1 � 1 \ 845.64 \ 11 845.85 846.17 846.83 / - 845.45 845.06 845.54 845.58 ------ 20' 467 C�b� 845.92 845.51 EX. 15" HDPE PIPE ASPHALT PARKING AREA c �h 1 UET L�K \ �\ 844 844.15 - 1 - - - r�4L� O-R1NG- --- -(itJ REMA17 SS N - _ 854.94 `F OF 18' ClA 1 \ Cg p5C > 83 05-C B g ��{k p1PE02 I� i 8� �� \ RIM: 8 7 3 / _ 6" MIN. OF SEPARATION BETWEEN BOT. OF PROP. STORM PIPES AND TOP OF EX. STORM PIPES. CONTRACTOR TO CONTACT a50 a ENGINEER IF FIELD CONDITIONS DO NOT ALLOW FOR 1' OF SEPARATION. (PROVIDE CONCRETE CRADLE AT CROSSING 848 ^' /I EQUIVALENT TO DETAIL PROVIDED ON SHEET C1 1) b 20' BMP ACCESS EASEMENT ml - 846 w ff 9 rp a1 PROP. 10' WIDE BERM @ EL: 847.00 847.03 \ ° • 70 z \�� NEW ADDITION DOWNSPOUTS O7 846.62 847.32 FFE: 847.40 \\ TO SURFACE DISCHARGE I / (REFER TO ARCH PLANS FOR LOCATIONS) 846.66 846.73 5,203 SF 9 846.48 846.22 846 845.67 846.01 84641 20' BMP ACCESS EASEMENT 843- _-- INLET (TO BE CONVERTEDTO O CURB INLET AFTER PH EC) GRATE: 845.0 843.94 INV: 841.1' CURB INLET (TO BE CONVERTED TO JUNCTION BOX AFTER PH EC) I GRATE:8##.2` 845.14 INV IN & OUT: 840.8' v� U 0CID /i 1 CP 1 CP / EX. 15" RCP PIPE 1 PIPE OCS PIPE 51 LF OF 15" CLASS III RCP, O-RING / I 0 ' - C SEE SHEET C12 FOR BMP DETAILS.\ "' v DOGHOUSE MANHOLE OVER EX. RCP pb OCS ` / Cb `o� PROP. JB-03 SAND FILTER TO NOT BE INSTALLED UNTIL VO RIM:843.47 AFTER SITE IS STABILIZED AND MEETING WITH `r Cs 847 INV IN:838.29 (EX JB-04) CP CATCH BASIN (CB) RIM REFERNECE POINT \ EROSION CONTROL INSPECTOR IS HELD - ?'�� Sp I INV IN:838.50 (OCS) N•T• • \� _ - ` �s�cP20' CLASS C LAND ` APE B F Jj INV OUT:838.29 \ \ 15' ETA 847 PROVIDE WASTOP INLINE CHECK VALVE OR EQUIVALENT - RIM REFERENCE POINT �60' RIGHT OF WAY _ ON OCS OUTLET PIPE. (SEE DETAIL SHEET C1 1) �1 -- PER' flEE6gOOK 787-339 (30' EACH SIDE OF BOUNDARY) PROP. 10' WIDE SPILLWAY @ EL: 845.50 (LINE SPILLWAY WITH RIP -RAP) � I YARD INLET (YI) RIM REFERNECE POINT - N.T.S. ADA NOTES: A MAX SIDEWALK RUN SLOPE = 5 % - MAX SIDEWALK CROSS SLOPE = 2 % *NOTE* SPOT ELEVATIONS SHOWN AT CURB SPOT ELEVATION NOTES: LOCATIONS ARE FLOWLINE ELEVATIONS TOW: TOP OF WALL \ UNLESS OTHERWISE NOTED. BOW: BOTTOM OF WALL \ GENERAL NOTES: UNDER STRUCTURES, BUILDING SLABS, STEPS, AND PAVEMENTS, SCARIFY AND RECOMPACT TOP 12 INCHES (300 MM) OF EXISTING SUBGRADE AND EACH LAYER OF BACKFILL OR FILL SOIL MATERIAL AT 100 PERCENT. 1. RETAINING WALLS WILL OVER 4' TALL REQUIRE A SEPARATE PERMIT AND INSPECTION. 1. UNDER WALKWAYS, SCARIFY AND RECOMPACT TOP 6 INCHES (150 MM) BELOW SUBGRADE AND COMPACT EACH LAYER OF BACKFILL OR FILL SOIL MATERIAL AT 95 PERCENT. 2. ALL STORM WATER CATCH BASINS, INLETS, MANHOLES, ETC. SHALL BE PERMANENTLY LABELED AS "NO DUMPING, DRAINS TO RIVER" AND INCLUDE A FISH SYMBOL. 2. UNDER TURF OR UNPAVED AREAS, SCARIFY AND RECOMPACT TOP 6 INCHES (150 MM) BELOW SUBGRADE AND COMPACT EACH LAYER OF BACKFILL OR FILL SOIL MATERIAL AT 85 PERCENT. 1.1 SOIL FILL (GEOTECH REPORT SHALL TAKE PRECEDENCE OVER THIS SPECIFICATION IF EXISTS.) 3. FOR UTILITY TRENCHES, COMPACT EACH LAYER OF INITIAL AND FINAL BACKFILL SOIL MATERIAL AT 95 PERCENT. A. PLOW, SCARIFY, BENCH, OR BREAK UP SLOPED SURFACES STEEPER THAN 1 VERTICAL TO 4 HORIZONTAL SO FILL MATERIAL WILL BOND WITH EXISTING MATERIAL. 1.4 GRADING B. PLACE AND COMPACT FILL MATERIAL IN LAYERS TO REQUIRED ELEVATIONS AS FOLLOWS: A. GENERAL: UNIFORMLY GRADE AREAS TO A SMOOTH SURFACE, FREE OF IRREGULAR SURFACE CHANGES. COMPLY WITH COMPACTION REQUIREMENTS AND GRADE TO CROSS SECTIONS, LINES, AND ELEVATIONS INDICATED. 1. UNDER GRASS AND PLANTED AREAS, USE SATISFACTORY SOIL MATERIAL. 1. PROVIDE A SMOOTH TRANSITION BETWEEN ADJACENT EXISTING GRADES AND NEW GRADES. 2. UNDER WALKS AND PAVEMENTS, USE SATISFACTORY SOIL MATERIAL. EX. STORM STRUCTURE 2. CUT OUT SOFT SPOTS, FILL LOW SPOTS, AND TRIM HIGH SPOTS TO COMPLY WITH REQUIRED SURFACE TOLERANCES. RIM: 845.9 3. UNDER STEPS AND RAMPS, USE ENGINEERED FILL. INV IN & OUT: 836.8 B. SITE ROUGH GRADING: SLOPE GRADES TO DIRECT WATER AWAY FROM BUILDINGS AND TO PREVENT PONDING. FINISH 4. UNDER BUILDING SLABS, USE ENGINEERED FILL. SUBGRADES TO REQUIRED ELEVATIONS WITHIN THE FOLLOWING TOLERANCES: 5. UNDER FOOTINGS AND FOUNDATIONS, USE ENGINEERED FILL. 1. TURF OR UNPAVED AREAS: PLUS OR MINUS 1 INCH (25 MM). C. PLACE SOIL FILL ON SUBGRADES FREE OF MUD, FROST, SNOW, OR ICE. 2. WALKS: PLUS OR MINUS 1 INCH (25 MM). \ 1.2 SOIL MOISTURE CONTROL 3. PAVEMENTS: PLUS OR MINUS 1/2INCH (13 MM). REVISE PERCENTAGES IN THIS ARTICLE ACCORDING TO GEOTECHNICAL ENGINEER'S WRITTEN RECOMMENDATIONS. C. GRADING INSIDE BUILDING LINES: FINISH SUBGRADE TO A TOLERANCE OF 1 /2 INCH (13 MM) WHEN TESTED WITH A 10-FOOT UNIFORMLY MOISTEN OR AERATE SUBGRADE AND EACH SUBSEQUENT FILL OR BACKFILL SOIL LAYER BEFORE (3-M) STRAIGHTEDGE. \A. COMPACTION TO WITHIN 2 PERCENT OF OPTIMUM MOISTURE CONTENT. 1.1 FIELD QUALITY CONTROL E 1. DO NOT PLACE BACKFILL OR FILL SOIL MATERIAL ON SURFACES THAT ARE MUDDY, FROZEN, OR CONTAIN FROST OR A. TESTING AGENCY: OWNER WILL ENGAGE A QUALIFIED GEOTECHNICAL ENGINEERING TESTING AGENCY TO PERFORM TESTS \ ICE. AND INSPECTIONS. 2. REMOVE AND REPLACE, OR SCARIFY AND AIR DRY, OTHERWISE SATISFACTORY SOIL MATERIAL THAT EXCEEDS OPTIMUM B. ALLOW TESTING AGENCY TO INSPECT AND TEST SUBGRADES AND EACH FILL OR BACKFILL LAYER. PROCEED WITH MOISTURE CONTENT BY 2 PERCENT AND IS TOO WET TO COMPACT TO SPECIFIED DRY UNIT WEIGHT. SUBSEQUENT EARTH MOVING ONLY AFTER TEST RESULTS FOR PREVIOUSLY COMPLETED WORK COMPLY WITH REQUIREMENTS. _--------- - \ 1.3 COMPACTION OF SOIL BACKFILLS AND FILLS C. FOOTING SUBGRADE: AT FOOTING SUBGRADES, AT LEAST ONE TEST OF EACH SOIL STRATUM WILL BE PERFORMED TO VERIFY DESIGN BEARING CAPACITIES. SUBSEQUENT VERIFICATION AND APPROVAL OF OTHER FOOTING SUBGRADES MAY BE BASED \ ON A VISUAL COMPARISON OF SUBGRADE WITH TESTED SUBGRADE WHEN APPROVED BY ARCHITECT. A. PLACE BACKFILL AND FILL SOIL MATERIALS IN LAYERS NOT MORE THAN 8 INCHES (200 MM) IN LOOSE DEPTH FOR MATERIAL COMPACTED BY HEAVY COMPACTION EQUIPMENT, AND NOT MORE THAN 4 INCHES (100 MM) IN LOOSE D. TESTING AGENCY WILL TEST COMPACTION OF SOILS IN PLACE ACCORDING TO ASTM D 1556, ASTM D 2167, ASTM D 2922, \ DEPTH FOR MATERIAL COMPACTED BY HAND -OPERATED TAMPERS. AND ASTM D 2937, AS APPLICABLE. TESTS WILL BE PERFORMED AT THE FOLLOWING LOCATIONS AND FREQUENCIES: B. PLACE BACKFILL AND FILL SOIL MATERIALS EVENLY ON ALL SIDES OF STRUCTURES TO REQUIRED ELEVATIONS, AND E. PAVED AND BUILDING SLAB AREAS: AT SUBGRADE AND AT EACH COMPACTED FILL AND BACKFILL LAYER, AT LEAST ONE UNIFORMLY ALONG THE FULL LENGTH OF EACH STRUCTURE. TEST FOR EVERY 2000 SQ. FT. (186 SQ. M) OR LESS OF PAVED AREA OR BUILDING SLAB, BUT IN NO CASE FEWER THAN THREE ____-- ----- TESTS. --------- ------ C. COMPACT SOIL MATERIALS TO NOT LESS THAN THE FOLLOWING PERCENTAGES OF MAXIMUM DRY UNIT WEIGHT ACCORDING TO ASTM D 698: 4. FOUNDATION WALL BACKFILL: AT EACH COMPACTED BACKFILL LAYER, AT LEAST ONE TEST FOR EVERY 100 FEET (30 M) OR LESS OF WALL LENGTH, BUT NO FEWER THAN TWO TESTS. 5. TRENCH BACKFILL: AT EACH COMPACTED INITIAL AND FINAL BACKFILL LAYER, AT LEAST ONE TEST FOR EVERY 150 FEET (46 M) NOTE: OR LESS OF TRENCH LENGTH, BUT NO FEWER THAN TWO TESTS. NO WETLANDS ARE PRESENT ON THIS SITE. 6. WHEN TESTING AGENCY REPORTS THAT SUBGRADES, FILLS, OR BACKFILLS HAVE NOT ACHIEVED DEGREE OF COMPACTION SPECIFIED, SCARIFY AND MOISTEN OR AERATE, OR REMOVE AND REPLACE SOIL MATERIALS TO DEPTH REQUIRED; RECOMPACT AND RETEST UNTIL SPECIFIED COMPACTION IS OBTAINED. I IAPPROX. LOCATION OF EX. 1-STORY METAL BUILDING I I I GAS•''64 INVESTMENT COMPANY LLC PIN#: 4603652708 EX. 15"HHDPE PIPE EX. FES INV: 836.4 LINCOLN COUNTY FARM BUREAU PIN#: 4603652654 ENSURE EXISTING OUTFALL HAS A GRADED FLAT RIP -RAP APRON TO THE SIZING SHOWN ON THE RIP -RAP APRON DETAIL ON SHEET C09 Structure Table Structure Name Structure Details 01-FES PIPE 01 FES-02CB: INV IN = 842.100 RIM = 854.124 02-CB PIPE 02CB-05CB: INV IN = 842.250 PIPE 02CB-03CB: INV IN = 842.250 PIPE 01 FES-02CB: INV OUT = 842.250 RIM = 855.366 03-CB PIPE 03CB-04CB: INV IN = 850.000 PIPE 02CB-03CB: INV OUT = 849.800 04-CB RIM = 856.310 PIPE 03CB-04CB: INV OUT = 851.000 RIM = 846.561 05-CB PIPE 05CB-06CB: INV IN = 843.000 PIPE 02CB-05CB: INV OUT = 843.000 06-CB RIM = 846.601 PIPE 05CB-06CB: INV OUT = 843.550 Pipe Table NAME SIZE LENGTH SLOPE MATERIAL 01 FES-02CB 24" 38.29' 0.39% CLASS III RCP, O-RING 02CB-03CB 15" 211.67' 3.57% CLASS III RCP 02CB-05CB 18" 183.26' 0.41% CLASS IV RCP, O-RING 03CB-04CB 15" 125.00' 0.80% CLASS III RCP 05CB-06CB 1 15" 112.25' 1 0.49% CLASS IV RCP, O-RING 1. CONTRACTOR IS FULLY RESPONSIBLE FOR CONTACTING APPROPRIATE PARTIES AND ASSURING THAT EXISTING UTILITIES ARE LOCATED PRIOR TO BEGINNING CONSTRUCTION. 2. CONTRACTOR IS RESPONSIBLE FOR PLACING BARRICADES USING FLAGMEN, ETC., AS NECESSARY TO INSURE SAFETY TO THE PUBLIC. 3. ALL PAVEMENT CUTS, CONCRETE OR ASPHALT, ARE TO BE REPLACED ACCORDING TO STANDARDS OF THE DEPARTMENT OF TRANSPORTATION. 4. SHORING WILL BE ACCORDING TO OSHA TRENCHING STANDARDS PART 1926 SUBPART P, OR AS AMENDED. Know what's below. Call before you dig. 0 U O O CO a N CD O 0 U n,CNO00 U W Lu U Z 0 3 w W J ULL. > Z< U Q ^^, W m J n, V 1 ^ / LU LU 0 U C° w iD Cq Z = o L Z w Q c� n, itn W IIOnC L Z U V r Q U O LO J � Oq Q N W E S NORTH ARROW 0 15 30 60 GRAPHIC SCALE 1"=30 FT. \\\�\w ►CIA .•'•�pNDs p / . N C'7 o LU V) -q 00 00 `4 U Z Z � z,0 Q m C12 > 1..� LU 6 W1 r V I..L J LU V) L LU � z V) 0Q W m I LU z U r n Q � z lJ r�l REVISIONS: A2022-3-29 1ST EC REVIEW 2 2022-5-13 NCDEQ COMMENTS C06 - GRADING.DWG PROJECT NUMBER: 221011 DATE: 2/4/2022 DRAWN BY: KIW C06 12 SHEET OF C06 - GRADING.DWG -PLOT: Kennedy- TUE. 5-24-2022 3:10 PM