Loading...
HomeMy WebLinkAboutSW3220302_Plansheet - Existing Drainage Area_202206011025.00' - N 83°20'00" E - - LAKE NORMAN LUTHERAN CH. DB 555-731 / 1 -WATERSHED INOT IN WATERSHED - _ - � 974.53' - - - \ \ EX. YARD INLET �\ RIM: 861 / 8 INV OUT: \ (TO BE REMOVED AFTER PH 1 EC) _ EXISTING BYPASSED DRAINAGE AREA = 1.63 AC (71,003 SF) P AC • EX NON -IMPERVIOUS RVIOUS BYPASSED 40.6964AC (30,318 SF) WATERSHED LINE UNDERGROUND POWER / i WS-IV CRITICAL GAS LINE - - CABLE LINE - -_-----`------- --- APPROX. LOCATION OF EXISTING BUILDING ROOF LEADER. CONTRACTOR SEWER LIMP TO FIELD VERIFY. (TO BE RE-ROUTED AFTER PH1 EC)7z LUILDING FFE: 847.4. ONE STORY COMMERCIAL B 4.775 AC +- \ DB 2990-634 �� 21 ASPHALT PARKING AREA (TO BE REMOVED) \ b / I EX. STORM MANHOLE 17 \ / RIM:846.5 \ \ INV O I INV OUT:T: 83 839.4 APPROX. LOCATION \ - OF EX. 15" HDPE PIPE A / b N O \ / O EX. 15 RCP PIPE CROWN ATLANTIC CO. \ \ DB 1 1 13-54010 / cn \� �15' �El AC S 87 29'58"W _ _ EX. STORM STRUCTURE RIM: 845.9 INV IN & OUT: 836.8 EX. 15" RCP PIPE (TO BE REMOVED AFTER PH1 EC) SIDEWALK \ --------- 72.5 ASPHALT PARKING AREA 46.7' EX. 15" HDPE PIPE 844 15' SETBACK � .26' S86°15'38'W8 _ � INLET (TO BE CONVERTED TO CURB INLET AFTER PH1 EC) -�43� - GRATE: 843.4' INV: 841.1' CURB INLET (TO BE CONVERTED TO JUNCTION BOX AFTER PH1 EC) GRATE: 844.2' INV IN & OUT: 840.8' 60' RIGHT OF WAY PER DEED BOOK 787-339 (30' EACH SIDE OF BOUNDARY) IAPPROX. LOCATION OF EX. 1-STORY METAL BUILDING I I I EX. 15" HDPE PIPE EX. FES INV: 836.4 THE INVESTMENT CO. DB 2224-807 PB 15-417 111�, i50.47' 15" RCP R� EX. WATER INVERT: 843.7' I ♦ METER GAS LINE ' 1 I BLE LINE III ; 1 N° °� — III i 1� m a° I— a III II c 1 Z I a o 1,II, �JGN c 70 1. CONTRACTOR IS FULLY RESPONSIBLE FOR CONTACTING APPROPRIATE PARTIES AND ASSURING THAT EXISTING UTILITIES ARE LOCATED PRIOR TO BEGINNING CONSTRUCTION. 2. CONTRACTOR IS RESPONSIBLE FOR PLACING BARRICADES USING FLAGMEN, ETC., AS NECESSARY TO INSURE SAFETY TO THE PUBLIC. 3. ALL PAVEMENT CUTS, CONCRETE OR ASPHALT, ARE TO BE REPLACED ACCORDING TO STANDARDS OF THE DEPARTMENT OF TRANSPORTATION. 4. SHORING WILL BE ACCORDING TO OSHA TRENCHING STANDARDS PART 1926 SUBPART P, OR AS AMENDED. /INVEST: T.1' 1 I 1 1 N O ow I � w , rf, 15" RCP I INVERT: 42.8' I 0I r I g Know whatis below. aD Call before you dig. 0 U O CD E a �O � O U N co M W w Z Z 3 W W J U 7- 0 W J c � m D o, L Q p r, mW cq ?_ - W Q Z W IL W W N 0 zQ 7jD N z O - Lri J � OQ Q N W E S NORTH ARROW 0 15 30 60 GRAPHIC SCALE V=30 FT. CI•A R �� �•, ••�PNLS �p / *,NN 0•*_ __ • 5�/3�2022.•' • 77��1111111\\\�\ Q LU I..L Q w M O < LU v) o co z z a; Z LUL0 LL w i Q LU O '0 w Q Q 0 0 - J W c/i LL/) LJJ U z LU Q CL c m z1-0 LU z U O Q a- z LU LU Q Lu I^.L I..L REVISIONS: A2022-3-29 1ST EC REVIEW 2 2022-5-13 NCDEQ COMMENTS EX. DA TO OUTFALL PRE-DEV .DWG PROJECT NUMBER: 221011 DATE: 2/4/2022 DRAWN BY: KIW SHEET 12 OF EX. DA TO OUTFALL (PRE-DEV).DWG - PLOT: Kennedy - TUE. 5-24-2022 3:18 PM