Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW6220401_Design Calculations_20220621 (5)
• " I " `e PROJECT NAME Cameron Commercial DATE )3-16-22 PROJECT NO 1766 DESIGN PHASE PRELIM CONSTR / X / REVISION LOCATION Harnett County, North Carolina BY CSB RECORD OTHER CHECKED BY (SPECIFY) n= 0.013 9= 226 h= 26 STORM DRAINAGE SCHEDULE CONTINUED AREAS (INLETS) INLET AREA (AC) INLET Cc RUNOFF COEFF. INLET DISCHARGE (CFS) Q (+) UPSTREAM BYPASS (CFS) Q(-) INLET BYPASS (CFS) CAPTURED INLET DISCHARGE (CFS) TOTAL AREAS (AC) INLET TIME (MIN) PIPE TIME (MIN) Tc TIME OF CONC. (MIN) I INTENSITY (IN/HR) Cc RUNOFF COEFF. FROM TO DI-1 DI-2 DI-1 0.30 0.92 2.01 0.00 0.00 2.01 0.30 5.00 0.00 5.00 7.29 0.92 DI-2 DI-3 DI-2 0.38 0.92 2.55 0.00 0.00 2.55 0.68 5.00 0.29 5.29 7.22 0.92 DI-3 CI-4 DI-3 0.30 0.92 2.01 0.00 0.00 2.01 0.98 5.00 0.57 5.57 7.16 0.92 CI-4 DI-5 CI-4 0.19 0.85 1.18 0.00 0.00 1.18 1.17 5.00 0.88 5.88 7.09 0.91 DI-5 SDMH-6 DI-5 0.10 0.65 0.47 0.00 0.00 0.47 1.27 5.00 1.42 6.42 6.97 0.89 SDMH-6 PO-7 SDMH-6 0.00 0.00 0.00 0.00 0.00 0.00 1.27 5.00 1.66 6.66 6.92 0.89 Roof Drain SDMH-6 Roof Drain 0.39 0.95 2.70 0.00 0.00 2.70 0.39 5.00 0.00 5.00 7.29 0.95 RI-8 FES-9 RI-8 1766-Storm Drainage.As 10-YEAR Date: 6/21/2022 Time: 7:10 AM Page 1 of 4 • " I " `c PROJECT NAME Cameron Commercial DATE 03-16-22 PROJECT NO 1766 DESIGN PHASE PRELIM / / CONSTR / X / REVISION LOCATION Harnett County, North Carolina BY CSB RECORD OTHER CHECKED BY 0 (SPECIFY) n= 0.013 9= 226 h= 26 STORM DRAINAGE SCHEDULE - CONTINUED Q DISCHARGE (CFS) Q SIDE- STREAM (CFS) SLOPE DIA. (IN) CAPACITY (FULL) (CFS) V FULL (FPS) LENGTH (FT) SEGMENT TIME (MIN) UPPER INV. (FT) LOWER INV. (FT) UPSTREAM TOP ELEV. (FT) FROM TO CIA DI-2 2.01 0.00 0.0050 15 4.6 3.7 64 0.29 322.00 321.68 325.54 DI-2 DI-3 4.52 0.00 0.0050 15 4.6 3.7 64 0.29 321.68 321.36 326.02 DI-3 CI-4 6.45 0.00 0.0050 18 7.4 4.2 76 0.30 321.11 320.73 326.52 CI-4 DI-5 7.54 0.00 0.0050 24 16.0 5.1 165 0.54 320.23 319.40 326.65 DI-5 SDMH-6 7.86 0.00 2.70 0.0052 24 16.3 5.2 77 0.25 319.40 319.00 328.07 SDMH-6 PO-7 10.51 0.0387 24 44.5 14.2 39 0.05 318.00 316.50 327.09 2.70 Roof Drain SDMH-6 0.00 0.0101 15 6.5 5.3 238 0.75 325.50 323.10 RI-8 FES-9 3.33 0.0306 18 18.4 10.4 49 0.08 319.50 318.00 323.65 1766-Storm Dminagexls 10-YEAR Date: 6/21/2022 Time: 7:10 AM Page 2 of 4 • " ` ` PROJECT NAME Cameron Commercial ` DATE 03-16-22 PROJECT NO 1766 DESIGN PHASE PRELIM CONSTR REVISION / / / X / LOCATION Harnett Count , North Carolina BY CSB RECORD OTHER CHECKED BY 0 (SPECIFY) n= g= h= 0.013 226 26 HYDRAULIC GRADE LINE PIPE HYDRAULIC SIDESTREAM AREA RADIUS SUMMATION (FT) (FT) (CFS) Hf He 90 DEG=0.7 60 DEG=0.55 HEAD LOSS He BEND LOSS Hb K'S 30 DEG=0.28 15 DEG=0.10 Ht BEND LOSS K CONTINUED FRICTION SLOPE (FT/FT) FRICTION VELOCITY (FPS) FROM TO CIA DI-2 1.2272 0.3125 0.00 0.06 0.01 0.01 0.00 0.09 0.10 0.0010 1.63 DI-2 DI-3 1.2272 0.3125 0.00 0.31 0.05 0.07 0.02 0.46 0.10 0.0049 3.67 DI-3 CI-4 1.7671 0.3750 0.00 0.29 0.05 0.07 0.02 0.43 0.10 0.0038 3.64 CI-4 DI-5 3.1416 0.5000 0.00 0.18 0.02 0.03 0.06 0.30 0.70 0.0011 2.39 DI-5 SDMH-6 3.1416 0.5000 0.00 0.09 0.02 0.03 0.01 0.16 0.10 0.0012 2.49 SDMH-6 PO-7 3.1416 0.5000 2.70 0.08 0.04 0.06 0.09 0.28 0.55 0.0021 3.33 Roof Drain SDMH-6 1.2272 0.3125 0.00 0.41 0.02 0.03 0.04 0.50 0.55 0.0017 2.19 RI-8 FES-9 1.7671 0.3750 0.00 0.05 0.01 0.02 0.02 0.10 0.28 0.0010 1.88 1766-Storm Dminagexls 10-YEAR Date: 6/21/2022 Time: 7:10 AM Page 3 of 4 " I"`DESIGN NAME Commercial 7H.,'..ft 03-16-22 PROJECT NO 1766 PHASE PRELIMCT CONSTR / Xron REVISIONION County, North Carolina BY CSB RECORD OTHER CHECKED BY 0 (SPECIFY) n= 0.013 g= 226 h= 26 HYDRAULIC GRADE LINE - CONTINUED DESIGN CRITERIA: 1. DESIGN FOR THE 10 YR STORM 2. ASSUME TIME OF CONCENTRATION TO AN INDIVIDUAL INLET = 5 MIN. (Unless otherwise noted) 3. INTENSITY = g/(h+T), FOR 10 YR STORM (g and h were derived from Raleigh -Durham Intensity - Duration -Frequency Charts, REF: NC Erosion and Sediment Control Planning and Design Manual) 4. MANNINGS "n" FACTOR= 0.013 5. RUNOFF COEFICIENT Cc=0.50 (Per CR-7107) OUTLET W.S. ELEV (FT) INLET W.S. ELEV. FLOW CONDITION CONTROL FREE- BOARD (FT) COMMENTS FROM TO OUTLET INLET USE CONTOL CONTROL (FT) (FT) (FT) DI-1 DI-2 322.89 322.98 322.74 322.98 OUTLET 2.56 OK DI-2 DI-3 322.44 322.89 322.89 322.89 OUTLET 3.13 OK DI-3 CI-4 321.93 322.36 322.44 322.44 INLET 4.08 OK CI-4 DI-5 321.44 321.74 321.48 321.74 OUTLET 4.91 OK DI-5 SDMH-6 321.28 321.44 320.67 321.28 319.48 WATER SURFACE: 321.44 321.28 321.00 OUTLET 6.63 OK SDMH-6 PO-7 321.00 OUTLET 5.81 OK 324.10 Roof Drain SDMH-6 324.60 326.33 326.33 INLET RI-8 FES-9 319.20 319.30 320.40 320.40 INLET 3.25 OK EXISTING GROUND: 318.50 1766-Storm Drainage.As 10-YEAR Date: 6/21/2022 Time: 7:10 AM Page 4 of 4