Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW6220401_Design Calculations_20220621 (4)
Cameron Commercial Wet Pond #1 SCS curve number Hydraulic Soil Group: A Area SCS CN Building (sf) 17,113 98 Sidewalk (sf) 2,916 98 Pavement (sf) 46,998 98 Pond (sf) 5,046 98 Open space (sf) 26,516 39 Offsite -open space (sf) 69 Offsite -impervious (sf) 98 Total (sf) 98589 82 98589 Total (ac) 2.26 Rational Coefficient Pre -development Post -development Area C Area C Building (sf) 501 0.95 Building (sf) 17,113 0.95 Sidewalk (sf) 0.95 Sidewalk (sf) 2,916 0.95 Pavement (sf) 0.95 Pavement (sf) 46,998 0.95 Open space (sf) 64,638 0.30 Pond (sf) 5,046 0.95 Offsite -open space (sf) 0.40 Open space (sf) 26,516 0.30 Offsite -impervious (sf) 0.95 Offsite -open space (sf) 0.30 Offsite -impervious (sf) 0.95 Total (sf) 65139 0.30 Total (ac) 1.50 Total (sf) 98589 0.78 Total (ac) 2.26 1766-Runoff coefficient .xls Printed 6/21/2022