Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW3220305_Plansheet CD-000-100-5 - Demolition Plan_20220621
U) W Q 0 Q _U Q o ry o> W J U) U � U p Q Q CO U d M Lq It N N O N N W H Q 0 H O J d O O O O O 0 U 6 00 Nt Ln LLI 75 Q Z W J_ LL O fD N >0 d U m U m d U) W Q 0 Q _U Q o ry o> W J U) U � U p Q Q CO U d N N O N N W H Q 0 H O J d O O O O 0 U 6 00 Nt Ln LLI 75 Q Z W J_ LL O fD N >0 d U m U m d 1 r0/N " PLASTIC 3 UIT Q F w 2„ Pw—Pw w w \Q�&It' G�GQ rIN 6'tX 2.74' C� �\ `Lo541.48 3 GHQ 0tK 1 6 /2" NPW � STICZ''dA7l D/ e jTIC 3 \ 2 GRA TE=553.34' Uj NDI o z -� 13 i n INV 1N=543.34' Q INV OUT=543.04' HIGH T WASTE ACTIVATED SLUDGE 4 4 " ClP W La 12 J� I•', CIP _ C D/ 1 ?i ) /V10 I 13 GRA TE=552.38' 1" PLAST PW 2" STL W NO ACCESS 3(ABANDON 1 / ss ss / ue RA TE=552 00' e V 1N=545.82' ' 3 Gy F� 14 V 1N=545.96' V OUT=545.58' co c 12 mac, o`Q U �� oAL DI Ab; GRA TE--553.62' INV IIV=547.99' G\Q �t O �, O,A INV OUT 547.39' r lb / V) i0 / ��• m DI GRA TE=552.59' �' U c INV 1N=549.53' � • INV OUT=549.48' 6 CIP 13 / o uE 4 �® 8 O 1 6 / SG=560.80' D/ GHQ IN =555.63(3"ClP) ® BOX GRA TE=552 77' GHQ V 1N=554. 50 (6'CIP) " ® IN 1IV=552 77' RATE=565.92' ��10 NV OUT=554.22(6'CIP) 6CIP E 2A INV OUT=550.83' C / V OUT=560.3 40 G J SSMH 17 R/M=558.39' 36" FULL —NO ACCESS w o PRIMARY CLARIFIER 0 m ® HPOAS NO. 6 19 O BASIN NO. 5 11 PLAN NORTH o INSET SCALE: 1" = 30' /I ❑ 7 --- =_=__ 0 • ` ` . ____-______ U) W Q 0 Q B _U Q ry o W J co U U p Q Q co U d 0 �n N N O N N W Q 0 O J d (D 0 N 0 0 0 0 0 U 0 0 Nt LO li.i A Q z W ILL 0 c0 N 0 U m U M 0- ❑ I J CULV END X 13 a13 e e 1 t•: BUILDING I ODOR CONTROL SYSTEM ® o ICI APPROX FURNACE BUILDING e 0 0 2 ALKALINITY FEED FACILITY 3 4 5 MATCH LINE SEE DRAWING CD-000-101 ♦ ® I 0 ASH DISPOSAL SITE NO. 1 �♦ 8 0 0 24" PID 0 0 ♦ I ♦ O � © )© 0 ` 8" PW � 0 ` / 16 GRAVITY THICKENER NO. 2 0= O 0 0 ♦♦ I w w I I `♦ I ADMINISTRATION 10 _ PLAN BUILDING � NORTH INSET ♦♦ ` SCALE: 1" = 30' ♦ ♦ 15 ♦ 0 0 ♦� `♦♦ I l ♦ 15 ` ♦ I 7 7 0 o F ---- I 0 7-_____- 3 5 0 I co 0 ------ O HIGH MAST 1 I W l C? z o J U �< Q o W 3 3Uj I I ® 1 � HIGH MAS ® • I WASTE I ACTIVATED 12 SLUDGE 3 I I� 3 h® 130 o � � ® ® BOX 2A h • • • 3 ® Ie0 ® 0 I El He HPOAS �] BASIN NO. 5 2 PRIMARY CLARIFIER NO. 6 e • THICKENED ® SLUDGE PS • • 0 MATH LINE SEE DRAWING CD-000-104 / \ J PLAN NORTH SITE DEMOLITION PLAN 2 SCALE: 1" = 40' 3 PRIMARY SLUDGE PS NO. 3 PRIMARY CLARIFIER \® NO. 5 n C 5 • 6 GENERAL NOTES: 1. SEE DRAWING C-000-001 FOR GENERAL NOTES AND SOIL BORING INFORMATION. VI Vrr1 1 AND • ENVIRONMENTAL ENGINEERING AND CONSULTING 309 East Morehead Street, Suite 160, Charlotte, NC 28202 (704) 358-7204 North Carolina Board of Examiners for Engineers and Survevors License No. F-0785 SEAL 02/20/22 9:26 AM 0 KEYNOTES: 1 SAW CUT AND DEMOLISH EXISTING DRIVE. FINAL DRAWINGS - FOR REVIEW 2 SAW CUT AND DEMOLISH EXISTING CURB AND GUTTER. PURPOSES ONLY - NOT C 3 DEMOLISH EXISTING STORMWATER STRUCTURE. RELEASED FOR CONSTRUCTION 4 DEMOLISH EXISTING STORMWATER PIPE. 5 DEMOLISH EXISTING LAMP POST. 6 DEMOLISH SECTION OF ABANDONED POTABLE WATER PIPE AND INSTALL ENDCAPS. 7 SAW CUT AND DEMOLISH SECTION OF ROAD TO ALLOW FOR UTILITY INSTALLATION. WSACC 8 DEMOLISH EXISTING VEGETATION. 9 DEMOLISH EXISTING 6" NPW. 1S4AR * KStaiMlicbpty * 014SAS 18001 Il 10 RELOCATE EXISTING FIRE HYDRANT ASSEMBLY. ROCKY RIVER 11 SEE DRAWING C-000-100 FOR BENCHMARK INFORMATION. REGIONAL 12 DUCT BANK AND MANHOLE SHALL BE DEMOLISHED AFTER INSTALLATION OF NEW 12.47KV DUCT BANK AND FEEDERS WASTEWATER TO EXISTING AERATION BASIN TRANSFORMERS PER DESIGN TREATMENT PLANT BY SOUTHEASTERN CONSULTING ENGINEERS, INC. CONSTRUCTED AS PART OF A SEPARATE PROJECT. PHASE 3 EXPANSION 13 RELOCATE P/T-14 AND INSTALL NEW DUCT BANK AND FIBER REVISIONS CABLES TO RECONNECT WAS AND AERATION BASIN PLCS TO THE NETWORK. REV DATE DESCRIPTION 14 DEMOLISH EXISTING 6" SC. 15 EXISTING ELECTRICAL CONCRETE PADS TO BE DEMOLISHED BY SOUTHEASTERN CONSULTING ENGINEERS (SCE) AS PART OF A SEPARATE PROJECT. PADS WILL BE REMOVED PRIOR TO THE BEGINNING OF THE RRRWWTP PHASE 3 EXPANSION. 16 EXISTING STORAGE CONTAINERS TO BE RELOCATED BY WSACC PRIOR TO THE BEGINNING OF CONSTRUCTION. • 111 1 j� 111 1 i� KEY PLAN SCALE: 1" = 500' 6 LINE IS 2 INCHES AT FULL SIZE DESIGNED: D. WRIGHT DRAWN: R. JAMES CHECKED: K. DEVENDORF CHECKED: D. VARJABEDIAN APPROVED: K. DEVENDORF FILENAME 154689-C D-000-102. D W G BC PROJECT NUMBER 156673 CLIENT PROJECT NUMBER CIVIL SITE DEMOLITION PLAN 2 DRAWING NUMBER C D-000-102 ##SHEET NUMBER t1-t1- OF C U) W Q 0 Q _U Q o ry o> W J U) U � U p Q Q CO U d ti N N O N N W H Q 0 H O J d M O O O O 0 U 6 00 Nt Ln LLI 75 Q Z W J_ LL O fD N >0 d U m U m d U) W Q p Q U_ Q ry o ry a W J U) U � U p Q Q U) U d o� N N O N r N W Q p H 0 J d V r1 O r O O O p U rn 00 It Ln r cW G Q z W J_ L.L O Nt r N r >p d U m_ U m d U) W Q 0 Q _U Q o ry o> W J U) U � U p Q Q CO U d 0 0 LO N N O N N W H Q 0 H O J d Ln O O O O 0 U 6 00 Nt Ln LLI 75 Q Z W J_ LL O fD N >0 d U m U m d