HomeMy WebLinkAboutMayo Monofill General Permit File (27)Georgoulias, Bethany From: Georgoulias, Bethany Sent: Friday, December 20, 2013 1117 AM To: 'Langley, Shannon' Cc: Bennett, Bradley; Pickle, Ken Subject: Mayo Steam Plant Monofill NCG12 COC Hi Shannon, I wanted to update you on the status of the Certificate of Coverage for the Mayo Monofill under NCG12., We have obtained approvals from both the Raleigh Regional Office DWR and DEMLR,staff. I am finalizing the COC and issuance letter before I leave today. Since Bradley and I are both out much of the rest of the year, we'd prefer to sign and issue the final permit on Monday, January 6`h, when we are both back in the office. Will that date work for you all? Bradley returns before than I do (January 2 "d), if for some reason it needs to be issued,that week prior. Please advise us if you feel that's necessary. We'll'email you an electronic copy of the final COC once ibis issued. Thanks, and I hope you have a good holiday! Bethany Bethany Georgoulias, Environmental Engineer NCDENR / Division of Energy, Mineral, and Land Resources Storrnwater Permitting Program 1612 Mail Service Center, Raleigh, NC 27699 -1612 512 N. Salisbury Street, Raleigh, NC 27604 919 / 807 -6372 (phone); 919 / 807 -6494 (fax) Website: http: /. /portal.ncdenr org /web /Ir /stormwater E -mail correspondence to and from this address may be subject to the North Carolina,Public Records law and may be disclosed to third parties. - - - -- Original Message ----- From:,Langley,, Shannon [ma'ilto: Shannon .Langley @duke- energy.com] Sent: Tuesday, December10, 2013 10:16 AM To: Georgoulia -s, Bethany Cc. Bennett, Bradley; Pickle, Ken Subject: RE': Question about Mayo Steam Plant Thanks Bethany. We are trying -to have it complete by the end of the year. I am at home °and do not have the SOC with me but my recollection is that the updated construction schedule we provided to DWR gives us a little bit more time than that. The schedule timeframe you provided should work. If we can see a draft copy, please forward. Thanks. 'Shannon From-,Georgoulias, Bethany [ bethany.georgoulias @ncdenr.gov] Sent: Tuesday, December 10, 2013 9:58 AM To: Langley, Shannon Cc: Bennett, Bradley; Pickle, Ken Subject RE: Question about Mayo.Steam Plant * ** This is an EXTERNAL email. Exercise caution. DO'NOT open attachments or click links from unknown senders or unexpected email. * ** Hi Shannon, I am close to completing a draft of the Certificate.of Coverage with supplemental monitoring requirements,for NCG12. It will include a few additional para mete rs;through the cycle-of the permit, with an initial larger sampling suite for dust the (1) first sampling period and (2) the sampling period in 2017 pHdr`to renewal application., We expect this to be a low risk site, and our goal is for'these results to help preserve the option of continued, overage under NCG12 at renewal. I'm working with both DWR and DEMLR.staff�at the Raleigh Regional Office before finalizing the.000, and we need to get final concurrence from DEMLR staff at the RRO. Dave Parnell' was out on vacation at the end of November,, but I will be checking in with him and his Supervisor this week. I plan to have a COC for'internal concurrence by'the end of the week and anticipate being-able,to issue it before the Christmas holidays, as long as DWR and DEMLR staff are in,agreement. What is,the expected operation date of the Monofill, and does it reflect a certain date in the SOC? Thanks, Bethany Bethany Georgoulias, Environmental Engineer NCDENR / Division of Energy, Mineral, and Land Resources Storrnwater Permitting Program 1612 Mail Service Center, Raleigh, NC 27699 =1612 512 N. Salisbury Street, Raleigh, NC 27604 919 / 807- 6372,(phone); 919 / 807- 6494'(fax) Website: hitp: // portal .ncdenr.org /web /Ir /stormwater Email correspondence to and from this address may be subject to the North Carolina Public Records law and may be disclosed to third parties. 7