HomeMy WebLinkAboutSW3220305_Plansheet - Notes_20220325 (2)PROJECT DESCRIPTION 1 I 2 3 I 4 5 I 6 PERMANENT STABILIZATION DETERMINED BY THE PLAN APPROVING AUTHORITY. THIS PROJECT INCLUDES THE MECHANICAL AND ELECTRICAL IMPROVEMENTS TO EXPAND THE TREATMENT CAPACITY OF THE ROCKY RIVER REGIONAL WASTEWATER TREATMENT PLANT (RRRWWTP) IN CABARRUS COUNTY, NORTH CAROLINA. EXISTING SITE CONDITIONS THE EXISTING SITE IS LOCATED IN A LOW DENSITY RESIDENTIAL AREA AND IS IN THE YADKIN PEE DEE RIVER BASIN. ROCKY RIVER IS THE RECEIVING WATER COURSE AND HAS A CLASS 'C' CLASSIFICATION. ADJACENT SITE THE PROJECT AREA IS GENERALLY BOUNDED BY SIMPLICITY ROAD AND BREEZY LANE TO THE NORTH AND ROCKY RIVER TO THE EAST, WEST, AND SOUTH. OFF -SITE AREAS THERE WILL BE NO OFF -SITE AREAS DISTURBED AS A RESULT OF THIS PROJECT. THE STAGING AND STOCKPILE LOCATIONS WILL OCCUR WITHIN THE LIMITS OF DISTURBANCE FOR EACH PHASE OF WORK. THE DESIGN -BUILDER SHALL LOCATE TEMPORARY SOIL STOCKPILES WITHIN THE LIMITS OF DISTURBANCE OR AS APPROVED BY THE DESIGN -ENGINEER. SOIL STOCKPILES SHALL BE PROTECTED WITH TEMPORARY SILT FENCE AND STABILIZED WITH SEED AND MULCH OR OTHERWISE BE PROTECTED WITH SEDIMENT TRAPPING MEASURES. EROSION AND SEDIMENT CONTROL AREAS PERMANENT SEEDING SHALL BE APPLIED TO ALL DISTURBED SOIL AREAS PER SPECIFICATION 3292 19.13. STORMWATER RUNOFF ADDITIONAL IMPERVIOUS AREA FROM A NEW ROAD AND PARKING AREA WILL BE BE ADDED IN AN EXISTING GRASSY AREA ON SITE. THE RUNOFF FROM THIS AREA WILL BE DIRECTED TO AN EXISTING GRASSY SWALE BEFORE DISCHARGING TO AN EXISTING PERMANENT SEDIMENT BASIN WHERE IT WILL BE TREATED. THE REST OF THE PROJECT INCLUDES MINIMAL ADDITIONAL IMPERVIOUS SURFACES. RUNOFF WILL BE DIRECTED TO THE EXISTING STORMWATER FEATURES ON SITE. GROUND STABILIZATION IN ACCORDANCE WITH NPDES CONSTRUCTION STORMWATER GENERAL PERMIT NCG010000, SECTION II.B.2 GROUND STABILIZATION REQUIREMENTS ARE AS FOLLOWS AND ARE IDENTIFIED ON NPDES STABILIZATION SHEETS IN THE PLAN SET: 1. ALL PERIMETER DIKES, SWALES, DITCHES, AND PERIMETER SLOPES STEEPER THAN 4H:1V SHALL BE PROVIDED TEMPORARY OR PERMANENT STABILIZATION WITH GROUND COVER AS SOON AS PRACTICABLE BUT IN ANY EVENT WITHIN 7 CALENDAR DAYS FROM THE LAST LAND -DISTURBING ACTIVITY. 2. ALL OTHER DISTURBED AREAS SHALL BE PROVIDED TEMPORARY OR PERMANENT STABILIZATION WITH GROUND COVER AS SOON AS PRACTICABLE BUT IN ANY EVENT WITHIN 14 CALENDAR DAYS FROM THE LAST LAND -DISTURBING ACTIVITY. LIMITS OF DISTURBANCE ARE DELINEATED ON EROSION AND SEDIMENT CONTROL SHEETS. MAINTENANCE SCHEDULE DESIGN -BUILDER SHALL INSTALL EROSION AND SEDIMENT CONTROL MEASURES WITHIN THE LIMITS OF DISTURBANCE. IN GENERAL, EROSION AND SEDIMENT CONTROL MEASURES SHALL BE CHECKED DAILY, EROSION AND SEDIMENT CONTROL MEASURES WILL INCLUDE TEMPORARY SILT FENCE, SILT MAINTAINED CONTINUOUSLY, RELOCATED AS NECESSARY, AND SHALL BE WATERED, C FENCE OUTLETS, CONSTRUCTION ENTRANCES, INLET PROTECTION, SLOPE DRAINS, DIVERSION FERTILIZED, RESEEDED AND MULCHED AS NECESSARY TO OBTAIN A DENSE STAND OF GRASS. DITCHES, SILT FILTER BAGS, RIP RAP, CONCRETE WASHOUTS, WATTLES, TEMPORARY THE FOLLOWING ITEMS WILL BE CHECKED IN PARTICULAR: SEEDING, AND EMBANKMENT STABILIZATION. UNLESS OTHERWISE INDICATED, ALL VEGETATIVE AND STRUCTURAL EROSION AND SEDIMENT CONTROL PRACTICES SHALL BE 1. SILT FENCE SHALL BE INSPECTED AT LEAST ONCE PER WEEK AND AFTER EACH RAINFALL, CONSTRUCTED AND MAINTAINED ACCORDING TO MINIMUM STANDARDS AND SPECIFICATIONS AND REPAIRS SHALL BE MADE IMMEDIATELY. SHOULD THE FABRIC OF A SEDIMENT FENCE OF THE NCDEQ EROSION AND SEDIMENT CONTROL HANDBOOK. THE DESIGNATED EROSION COLLAPSE, TEAR, DECOMPOSE, OR BECOME INEFFECTIVE, IT SHALL BE REPLACED AND SEDIMENT CONTROL INSPECTOR HAS THE AUTHORITY TO ADD OR DELETE EROSION AND PROMPTLY. SEDIMENT DEPOSITS SHALL BE REMOVED AS NECESSARY TO PROVIDE SEDIMENT CONTROLS AS NECESSARY IN THE FIELD AS SITE CONDITIONS CHANGE. ADEQUATE STORAGE VOLUME. ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS SHALL BE REMOVED AND THE AREA SHALL BE BROUGHT TO GRADE AFTER THE SILT FENCE - SILT FENCE WILL BE INSTALLED TO INTERCEPT AND DETAIN SMALL AMOUNTS OF CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED. SEDIMENT FROM THE DISTURBED AREAS DURING CONSTRUCTION OPERATIONS AND TO PREVENT SEDIMENT FROM LEAVING THE CONSTRUCTION SITE. 2. INSPECT SILT FENCE OUTLETS AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (1-INCH OR GREATER) RAINFALL EVENT. CLEAR WASHED STONE OF ANY DEBRIS OR SEDIMENT TO SILT FENCE OUTLETS - SILT FENCE OUTLETS WILL BE INSTALLED ALONG THE SILT FENCE TO PROVIDE ADEQUATE FLOW FOR SUBSEQUENT RAINS. REPLACE STONE AS NEEDED. FILTER SEDIMENT LADEN WATER AS IT LEAVES THE SITE. _ (D J B W z Q Q o o W J W U � U U) Q U 75 Q 0 N O N N O N N LU I- 0 O J a_ cD 0 0 0 0 O U 00 co It r A 6i 7 z W J U_ O Nt N i d U m_ U m CONSTRUCTION ENTRANCES - A CONSTRUCTION ENTRANCE SHALL BE EMPLOYED TO REDUCE THE AMOUNT OF MATERIAL TRANSPORTED OFF -SITE BY CONSTRUCTION VEHICLES. THE CONSTRUCTION ENTRANCE SHALL BE MAINTAINED FOR THE DURATION OF THE CONSTRUCTION AND STABILIZATION. INLET PROTECTION - INLET PROTECTION DEVICES SHALL BE INSTALLED TO PREVENT SEDIMENT FROM ENTERING YARD INLETS, GRATED STORM DRAINS, OR DROP INLETS DURING CONSTRUCTION. SLOPE DRAINS - SLOPE DRAINS SHALL BE INSTALLED TO CONVEY RUNOFF DOWN STEEP SLOPES TO PREVENT EROSION. DIVERSION DITCHES - DIVERSION DITCHES SHALL BE INSTALLED TO 1) DIVERT CLEAN WATER OFFSITE AND 2) TO CHANNEL SEDIMENT -LADEN WATER TO DESIGNATED AREAS TO BE CONVEYED AND TREATED BY OTHER EROSION CONTROL MEASURES. SILT FILTER BAGS - SILT FILTER BAGS SHALL BE USED TO DEWATER CONSTRUCTION AREAS IN LOW LYING AREAS THAT HAVE NO WAY TO DRAIN THE COLLECTION OF RUNOFF. RIP RAP - RIP RAP SHALL BE USED AT OUTLETS WITH CONCENTRATED FLOW TO PREVENT EROSION. CONCRETE WASHOUT - CONCRETE WASHOUTS SHALL BE PROVIDED AT ANY AREA WHERE CONCRETE WILL BE USED. THE ACTUAL LAYOUT FOR EACH CONCRETE WASHOUT SHALL BE DETERMINED IN THE FIELD AND SHALL BE LOCATED AT LEAST 50 FEET AWAY FROM STORM DRAIN INLETS AND SURFACE WATERS. SEE DETAIL ESC-L/C-000-616. A CONCRETE WASHOUT SIGN SHALL BE INSTALLED WITHIN 30 FEET OF THE TEMPORARY CONCRETE WASHOUT FACILITY. WATTLES - WATTLES SHALL BE USED IN DITCHES AND/OR AREAS WITH MINIMAL CONCENTRATED FLOW TO REDUCE FLOW VELOCITY AND TRAP SEDIMENT. TEMPORARY SEEDING - ALL DENUDED AREAS WHICH WILL BE LEFT DORMANT FOR A PERIOD OF FOURTEEN (14) DAYS OR GREATER, SHALL BE SEEDED WITH THE TEMPORARY SEED MIX PROVIDED IN THE PLANS AND SPECIFICATIONS. SEE SPECIFICATION 32 92 19.13 FOR SPECIFIC MAINTENANCE ACTIVITIES. SOIL STABILIZATION BLANKETS & MATTING - SIDE SLOPES SHALL BE STABILIZED WITH STABILIZATION MATTING IN ACCORDANCE TO DETAIL ESC-C/C-000-614. 3. INSPECT INLETS AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (1-INCH OR GREATER) RAINFALL EVENT. CLEAR THE MESH WIRE, OR OTHER SEDIMENT FILTERING DEVICE, OF ANY DEBRIS OR OTHER OBJECTS TO PROVIDE ADEQUATE FLOW FOR SUBSEQUENT RAINS. TAKE CARE NOT TO DAMAGE OR UNDERCUT THE WIRE MESH DURING SEDIMENT REMOVAL. REPLACE STONE AS NEEDED. THE SOIL WITHIN THE LIMITS OF DISTURBANCE PRIMARILY CONTAINS SANDY LOAMS BUT HAS HYDRAULIC SOIL CLASSIFICATIONS THAT VARY FROM 'B' TO'D'. WHERE THE SOIL TYPE WAS USED FOR CALCULATIONS, THE MORE RESTRICTIVE CLASSIFICATION OF D. WAS USED. EROSION AND SEDIMENT CONTROL NOTES 1. DESIGN -BUILDER TO PERFORM SELF INSPECTION WEEKLY AT THE SITE USING THE COMBINED SELF -INSPECTION FORM FROM THE NC DEMLR WEBSITE. 2. A COPY OF THE APPROVED PLAN, THE CERTIFICATE OF APPROVAL, AND LETTER OF APPROVAL ARE TO BE KEPT ON SITE. THE NPDES PERMIT (WITH A MINIMUM OF 30 DAYS OF SELF -INSPECTION REPORTS) ARE TO BE KEPT ON SITE AND A RAIN GAUGE IS TO BE INSTALLED AND MAINTAINED FOR RECORD KEEPING UNTIL THE PROJECT IS CLOSED OUT BY NC DEMLR. 3. CONTACT THE NC DEMLR MOORESVILLE REGIONAL OFFICE AT (704-663-1699) AT LEAST 48 HOURS PRIOR TO COMMENCING THE LAND -DISTURBING ACTIVITY. 4. ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED PRIOR TO, OR AS THE FIRST STEP, IN CLEARING. 5. A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN SHALL BE MAINTAINED ON THE SITE AT ALL TIMES. 6. PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON THESE PLANS (INCLUDING, BUT NOT LIMITED TO, OFF -SITE BORROW OR WASTE AREAS), THE DESIGN -BUILDER SHALL SUBMIT A SUPPLEMENTARY EROSION CONTROL PLAN TO NC DEMLR AND THE CITY FOR REVIEW AND APPROVAL BY THE PLAN APPROVING AUTHORITY. 7. THE DESIGN -BUILDER IS RESPONSIBLE FOR INSTALLATION OF ANY ADDITIONAL EROSION CONTROL MEASURES NECESSARY TO PREVENT EROSION AND SEDIMENTATION AS 8. ALL DISTURBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT ALL TIMES DURING LAND DISTURBING ACTIVITIES AND DURING SITE DEVELOPMENT UNTIL FINAL STABILIZATION IS ACHIEVED. IIIIJ1 VYYI I AND • ^w 1 �I�.,wl 1 • ENVIRONMENTAL ENGINEERING AND CONSULTING 160, 9. DURING DEWATERING OPERATIONS, WATER WILL BE PUMPED IN TO AN APPROVED 309 East Morehead Street, Suite (704)358-7204 Charlotte, Nc28202 04 FILTERING DEVICE. North Carolina Board of Examiners for Engineers and Survevors License No. F-0785 10. THE DESIGN -BUILDER SHALL INSPECT ALL EROSION CONTROL MEASURES PERIODICALLY, AT LEAST ONCE EVERY SEVEN (7) CALENDAR DAYS, AND WITHIN 24 HOURS AFTER ANY STORM EVENT OF GREATER THAN ONE (1) INCH OF RAIN PER 24-HOUR PERIOD. ANY NECESSARY REPAIRS OR CLEANUP TO MAINTAIN EFFECTIVENESS OF THE EROSION CONTROL DEVICES SHALL BE MADE IMMEDIATELY. 11. EXCESS EXCAVATION DISPOSED OF OFF SITE SHALL BE DISPOSED OF IN ACCORDANCE .•`p�:•��••'••��:</,�/,,'•, WITH THE NCDEQ EROSION AND SEDIMENT CONTROL HANDBOOK. ��.�pFESS��,j,9;9 ' SEAL • M 12. EROSION AND SEDIMENT CONTROLS SHALL BE INSTALLED IN ACCORDANCE WITH NCDEQ 1 _365 EROSION AND SEDIMENT CONTROL HANDBOOK AND SHALL BE PLACED PRIOR TO OR AS THE FIRST STEP OF LAND DISTURBING ACTIVITY. ,��'•:NGllvz ;.••'O;•"` 13. EROSION AND SEDIMENT CONTROLS SHALL BE MAINTAINED SO THAT SEDIMENT CARRYING RUNOFF FROM THE SITE WILL NOT ENTER STORM DRAINAGE FACILITIES. 02/20/22 9:41 AM 14. PROPERTIES ADJOINING THE SITE SHALL BE KEPT CLEAN OF MUD OR SILT CARRIED FROM THE SITE BY VEHICULAR TRAFFIC OR RUNOFF. 15. THE DISPOSAL OF WASTE MATERIALS REMOVED FROM EROSION AND SEDIMENT CONTROL FACILITIES AND THE DISPOSAL OF THESE FACILITIES SHALL BE IN ACCORDANCE WITH THE NCDEQ EROSION AND SEDIMENT CONTROL HANDBOOK. 16. STABILIZATION MEASURES SHALL BE APPLIED TO EARTHEN STRUCTURES SUCH AS DAMS, DIKES, AND DIVERSIONS IMMEDIATELY AFTER INSTALLATION. FINAL DRAWINGS - FOR REVIEW PURPOSES ONLY - NOT 17. DURING CONSTRUCTION OF THE PROJECT, SOIL STOCKPILES SHALL BE PROTECTED WITH RELEASED FOR CONSTRUCTION TEMPORARY SILT FENCE AND STABILIZED WITH SEED AND MULCH OR OTHERWISE BE PROTECTED WITH SEDIMENT TRAPPING MEASURES. SOIL STOCKPILES MUST BE LOCATED WITHIN THE LIMITS OF DISTURBANCE. THE DESIGN -BUILDER IS RESPONSIBLE FOR THE TEMPORARY PROTECTION AND PERMANENT STABILIZATION OF ALL SOIL STOCKPILES ON SITE AS WELL AS SOIL INTENTIONALLY TRANSPORTED FROM THE PROJECT SITE. WSACC 18. NC DEMLR, WSACC, AND CABARRUS COUNTY MAY MAKE A CONTINUING REVIEW AND EVALUATION OF THE METHODS USED AND THE OVERALL EFFECTIVENESS OF THE EROSION AND SEDIMENT CONTROL PROGRAM. IF ON -SITE INSPECTIONS INDICATE THAT THE EROSION AND SEDIMENTATION CONTROLLING STRUCTURES ARE NOT ADEQUATE, OR ISO 1105VIXII + Noital�W'lcbotli * GHW13001:2N THERE IS A CHANGE OF CIRCUMSTANCE SUCH THAT THE APPROVED PLAN CANNOT BE CARRIED OUT, THE PLAN MAY BE AMENDED BY THE APPROVING AUTHORITY. ROCKY RIVER 19. SEDIMENT CONTROL MEASURES MAY REQUIRE MINOR FIELD ADJUSTMENTS AT TIME OF REGIONAL CONSTRUCTION TO ENSURE THEIR INTENDED PURPOSE IS ACCOMPLISHED. WASTEWATER 20. EROSION CONTROL STRUCTURES SHALL REMAIN IN PLACE UNTIL PERMANENT TREATMENT PLANT VEGETATION HAS BEEN ESTABLISHED ON THE EXPOSED SOIL SURFACE AND THE INSPECTOR HAS APPROVED IT. PHASE 3 EXPANSION 21. STREETS SHALL BE SWEPT DAILY DURING WORK ON ROADS. WASHING OF ROADS IS NOT REVISIONS PERMITTED. REV DATE DESCRIPTION LINE IS 2 INCHES DESIGNED: D. WRIGHT DRAWN: R. JAMES CHECKED: K. DEVENDORF CHECKED: D. VARJABEDIAN APPROVED: K. DEVENDORF FILENAME 154689-C-000-61 1.DWG BC PROJECT NUMBER 156673 CLIENT PROJECT NUMBER CIVIL EROSION & SEDIMENTATION CONTROL NOTES 1 DRAWING NUMBER C-000-611 Xx SHEET NUMBER OF ❑C C 1 2 3 I 4 5 I 6