Loading...
HomeMy WebLinkAboutSW3220305_Plansheet C-000-615 - Misc. Detail_202203250) Q 0 J U U Q I- _ CD w z Q 0 Lu U) 0 Q U c� 0 L6 0 0 0 U (J) 00 It LO I i.i Q z w J LL 0 Nt N 0 i U m_ U m 1 2 3 4 5 6 HOOD BrownAND • SILT BAG PLACED ON HIGH STRENGTH • HOLD-DOWN STAKES INLET AGGREGATE OR WOOD PALLETS DOUBLE STICHED GRATE Caldweit "J" TYPE SEAMS FLOW FROM DIVERSION DITCH ® GRATE ENVIRONMENTAL ENGINEERING AND CONSULTING (SEE DETAIL THIS DRAWING) SEWN IN SPOUT 309 East Morehead Street, Suite 160, Charlotte, NC 28202 1" REBAR FOR BA (704) 358-7204 EXPANSION REMOVAL FROM INLET North Carolina Board of Examiners for Engineers and RESTRAINT Surveyors License No. F-0785 �QPG� =III=III=III=III=III= HIGH STRENGTH III-IIIIII-III-III-III G S G p p III_IIIIIIIIIIII-III- STRAPPING FOR D D FILTER BAG �' DEFLECTOR D III -III HOLDING HOSE IN n n D III -III = DUMP LOOPS PLACE 12" PLASTIC CORRUGATED PIPE I -III- p III -III � III=111- -I WATER FLOW =III FROM PUMP n CATCH BASIN-v �•����F " ti'•� =_III p .•,' :•'o Essi ,�•`:9'•-. D : Q� 9 •: L D OUTLET SEAL ` • RIPRAP (SEE I=III C E AL DETAIL THIS LIL SHEET) I I I -I :.,• i°N � .••��,Q PUMP DISCHARGE �. •..•Gll0 O. FI I EI I EI I I- �. LENGTH -HOSE SECTION N STALLAT O N ''•�;,o„v•''� 4' MIN LEVEL SECTION OPENING ACCOMODATIONS 02/20/22 9:46 AM TOP VIEW UP TO 4" DISCHARGE HOSE MAINTENANCE NOTES: MAINTENANCE NOTES: 1. FILTER BAGS MAY BE REMOVED WHEN SITE IS STABILIZED AT THE DIRECTION 1. INSPECT INLET AND OUTLET POINTS AFTER STORMS FOR CLOGGING OR EVIDENCE OF OVERTOPPING. BREACHES OF THE ENGINEER. IN PIPE OR OTHER CONVEYANCE SHALL BE REPAIRED AS SOON AS PRACTIABLE IF OBSERVED. 2. FILTER BAGS SHALL BE CLEANED OR REPLACED ON A REGULAR BASIS. 2. INSPECT RIP RAP PAT AT OUTLET FOR SIGNS OF EROSION. IF SIGNS OF EROSION EXIST, ADDITIONAL ARMORING 3. FILTER BAG MAY NOT BE MORE THAN HALF FULL AT ANY TIME. FINAL DRAWINGS -FOR REVIEW PURPOSES ONLY -NOT C SHALL BE INSTALLED. C RELEASED FOR CONSTRUCTION 3. INSPECT THE SLOPE DRAIN AS SOON AS POSSIBLE FOLLOWING A STORM THAT CAUSES SURFACE EROSION AND PERFORM NECESSARY MAINTENANCE. 4. WHEN THE PROTECTED AREA HAS BEEN PERMANENTLY STABILIZED, TEMPORARY MEASURES MAY BE REMOVED. 8" OF SEDIMENT CONTROL STONE SIDE VIEW FILTRATION GEOTEXTILEV ESC-J CATCH BASIN INLET PROTECTION ESC-F VARIES SCALE: NTS SLOPE DRAIN - C-000-601 SCALE: NTS MARINI + NUOWu Ic body * OHSAS 13001:20V NOTES: ROCKY RIVER 1. USE NO. 5 OR NO. 57 STONE FOR SEDIMENT CONTROL STONE. La REGIONAL WASTEWATER 2. PROVIDE STABILIZED OUTLET TO STREAM BANK. TREATMENT PLANT 3. WOOD PALLETS MAY BE USED IN LIEU OF STONE AND GEOTEXTILE AS DIRECTED. A J PHASE 3 EXPANSION z SUFFICIENT NUMBER OF PALLETS MUST BE PROVIDED TO ELEVATE THE ENTIRE SILT BAG 0 _ 0 III=III = III- 2H:1V FLOW ABOVE NATURAL GROUND. ;III=III-III-'' APRON ''=1j1-I REVISIONS 0 o THICKNESS REV DATE DESCRIPTION 11 I I- 1 4. NOTE THAT FLOCCULANTS AND POLYMERS WILL CLOG PORES OF SILT BAG. o B -I I= I M B I ;� -III- 5. REMOVE AND PROPERLY DISPOSE OF SILT BAG UPON COMPLETION OF PUMPING OPERATIONS OR AFTER BAG HAS REACHED CAPACITY, WHICHEVER OCCURS FIRST. SPREAD THE DEWATERED SEDIMENT FROM THE BAG IN AN APPROVED UPLAND AREA AND STABILIZE WITH TOP VIEW SIDE VIEW SEED AND MULCH BY THE END OF THE WORK DAY. RESTORE THE SURFACE AREA BENEATH THE BAG TO ORIGINAL CONDITION UPON REMOVAL OF THE DEVICE. 6. REPLACE SILT BAG IF BAG CLOGS OR HAS RIPS, TEARS, OR PUNCTURES. DURING OPERATION KEEP CONNECTION BETWEEN PUMP HOSE AND FILTER BAG WATER TIGHT. REPLACE BEDDING LINE IS 2 INCHES wI IF IT BECOMES DISPLACED. AT FULL SIZE , NOTES: 1. MACHINE COMPACTION OF ALL FILL IS REQUIRED. DIVERSION SUFFICIENT TO DIRECT ALL SEDIMENT -LADEN STORMWATER INTO A SEDIMENT CONTROL DEVICE MUST BE INSTALLED PRIOR TO CLEARING AND GRUBBING OF THE AREA (OR IN CONJUNCTION WITH THIS OPERATION IF SEDIMENT CONTROLS AND DIVERSIONS ARE INSTALLED AS EACH CRITICAL POINT IS REACHED). MAINTENANCE NOTES: 2 DIVERSION SHOULD BE LOCATED TO MINIMIZE DAMAGES BY CONSTRUCTION OPERATIONS RIP RAP APRON LOCATION Do (IN) La (FT) W (FT) d50 (RIPRAP dMAX (FT) THICKNESS SIZE) (FT) (FT) EQ SLOPE DRAIN 12 13 14.00 0.45 0.68 1.02 EQ ROAD CULVERT 30 16 18.50 0.50 0.75 1.13 DESIGNED: D. WRIGHT DRAWN: R. JAMES CHECKED: K. DEVENDORF CHECKED: D. VARJABEDIAN APPROVED: K. DEVENDORF FILENAME 154689-C-000-615. D W G 1. SILT BAG TO BE CONTINUOUSLY MONITORED DURING OPERATION. BC PROJECT NUMBER 3. DIVERSION SHOULD BE SEEDED AND MULCHED. 156673 CLIENT PROJECT NUMBER 2. REPLACE SILT BAG IF BAG CLOGS OR HAS RIPS, TEARS, OR PUNCTURES. 4. CHECK DEVICE AFTER EACH RAIN, BUT ONCE A WEEK REGARDLESS. REPAIR AS NECESSARY. 3. DURING OPERATION KEEP CONNECTION BETWEEN PUMP HOSE AND FILTER BAG CIVIL 5. POSITIVE GRADE MUST BE PROVIDED TO ASSURE DRAINAGE. MINIMUM SLOPE TO BE 1%. TRY NOT WATER TIGHT. NOTES: TO EXCEED A SLOPE OF 5%. A 4. REPLACE BEDDING IF IT BECOMES DISPLACED. 1. dMAX = 1.5 x d50 A EROSION & 2. APRON THICKNESS = 1.5 x dMAX SEDIMENTATION CONTROL DETAILS 2 fiR� DIVERSION DITCH SILT FILTER BAG ESC-K OUTLET STABILIZATION STRUCTURE DRAWING NUMBER VAT SCALE: NTS ESC-H VAT SCALE: NTS VARIES SCALE: NTS C-000-615 Xx SHEET NUMBER OF 1 2 3 4 5 6