HomeMy WebLinkAboutNCC215561_Modification Confirmation Email_20220620Georgoulias, Bethany
From: laserfiche@ncdenr.gov
Sent: Monday, June 20, 2022 11:16 AM
To: Brad.Thompson@leewardenergy.com
Cc: Georgoulias, Bethany; om.aboudaher@leewardenergy.com;
Brad.Thompson@LeewardEnergy.com
Subject: Modification Confirmation
This e-mail is to notify you that the modification information for COC No. NCC215561 for the project Oak Trail Solar
Project that you submitted on 6/17/2022 has been added to the permit file records as of 6/20/2022.
Modification Reason: Other Revision(s) to E&SC Plan
Additional Details (if provided): Original plans were based on conceptual design. The attached plans are updates
project's EPC provider has updated the project plans. There are no changes to the E&SC design with the new plans and
thus did not require a full review per Samir Dumpor, Regional Engineering Supervisor (See attached email).
You can find all Construction COC Permit files in our Document Reoository here.
Questions? Please contact The NC Stormwater Program at (919) 707-3640.
This email was automatically generated by Laserfiche. Please do not respond to this email address, as responses are not
monitored.