Loading...
HomeMy WebLinkAboutNCC222248_ESC Approval Submitted (2)_2022062006/08/2022 LETTER OF APPROVAL Tim Carpenter, LKC Engineering 140 Aqua Shed Court Aberdeen, NC. 28315 RE: Project Name: Pine Ridge Parkway Acres Approved: 19.75 Project ID: ZP-20-21 County: Moore City: Southern Pines Address: 10695 US 15-501 HWY River Basin: Lumber Stream Classification: B Submitted By: LKC Engineering, PLLC Date Received by: 12/13/2021, Town of Southern Pines Plan Type: Commercial Dear Tim Carpenter, This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval must be posted at the job site. This plan shall expire three (3) years following the date of approval, if no land disturbing activity has been undertaken, as is required by Title 15A NCAC 413.0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is received, you will receive the COC via email. You MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the eNOI form to Annette Lucas at Annette.lucas@ncdenr.gov or Paul Clark at Paul.clark@ncdenr.gov. If the owner/operator of this project changes in the future, the new responsible party is required to apply for his/her own COC. Title 15A NCAC 413.0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Letter of Approval Tim Carpenter 06/08/2022 Page 2 of 2 Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-S 1 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. Prior to start of any construction, the NPDES NCG01 Construction Stormwater permit must be acquired from NCDEQ and a Preconstruction Conference must be held with Town Staff. The NCG01 permit must be obtained prior to scheduling the Preconstruction Conference. Once the NCG01 is obtained, please notify Jay Hough, the Town's Construction Inspector, 910-692-1983, to schedule the Preconstruction Conference. Your cooperation is appreciated. S' cerely, James Michel, PE Town Engineer Town of Southern Pines Enclosures: Certificate of Approval NCG01 Fact Sheet DEMLR Monitoring Form Rev July-1-2020 ec: Jackson Maples, E.I.