Loading...
HomeMy WebLinkAboutNCC202791_NOT Closeout Documents_20220613Report North Carolina Department of Environmental Quality Land Resources: 127 Cardinal Drive Extension, Wilmington, NC 28405 (910) 796-7215 County: Brunswick Project: Northwest Water Treatment Plant River basin: Cape Fear Person financially responsible: Brunswick County- John Nichols. Director of Project #: BRUNS-2020-026 Public l'tilities Address. P.O. Box 249, Bolivia, NC 28422 1. Project Location: Clearwell Dr, Northwest Pictures: No 2. Weather and soil conditions: sunny and ws.rkab=e Initial inspection: No 3. Is site currently under notice of violation? N... 4. Is the site in compliance with S.P.C.A. and rules? Yes if no, check violations below: S. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yc Describe: 7. Has sedimentation damage occurred since last inspection? No IFYes, where? ;check all that apply} Degree of damage: 8. Contact made with (name): Title: Inspection report: Sent Report Date given sent: January 14, 2022 9. Corrective action needed: 10. Comments: Permanent vegetation needs to be established where bare, especially along Hooper Road and from Hooper Road to discharge point. Reported by: Creighton Brown �, ���--- Others present: Date of inspection: January 11, 2022 Time arriving on site: 12:50 Pal Time leaving site: 1:25 PNI IM