HomeMy WebLinkAboutWM0301211_Final Permit_20220601ROY COOPER
Governor
ELIZABETH S. BISER
Secretary
RICHARâť‘ E. ROGERS, JR.
Director
NORTH CAROLINA
ErtaOronmerttal Quality
June 1, 2022
Mr. Jay King (via email)
NCDEQ DSCA Program
1646 Mail Service Center
Raleigh, NC 27699-1646
RE: Monitoring Well Construction Permit
Permit # WM0301211
Kim's Cleaners, Mooresville
DSCA #490011
Iredell County
Dear Mr. King,
In accordance with your completed application received on June 1, 2022, we are forwarding
herewith Monitoring Well Construction Permit Numbered WM0301211 and issued for the
construction of three monitoring wells located near the subject site in Mooresville, Iredell County.
This Permit will be effective for one year from the date of issuance and shall be subject to the
conditions and limitations as specified therein.
Should you have any questions, please contact Edward Watson at (704) 235-2199, or by
email at edward.watson@ncdenr.gov.
Sincerely,
DocuSigned by:
44.0141w H Pzue4
F161FB69A2D84A3...
Andrew H. Pitner, P.G., Assistant Regional Supervisor
Mooresville Regional Office
Water Quality Regional Operations Section
Division of Water Resources
CC: WQROS, Central Office (via Laserfiche)
Madalyn Stone, P.G. AECOM (via email)
Geologic Exploration (via email)
GDEQ1
NORTH CAROLINA
urormrm or Fmtraamaafm naanry
North Carolina Department of Environmental Quality I Division of Water Resources
Mooresville Regional Office 1601 East Center Avenue, Suite 301 I Mooresville, NC 28115
704.663.1699
NORTH CAROLINA
DEPARTMENT OF ENVIRONMENTAL QUALITY
DIVISION OF WATER RESOURCES
PERMIT FOR THE CONSTRUCTION OF A MONITORING WELL
In accordance with the provisions of Article 7, Chapter 87, North Carolina General Statutes, and other applicable Laws,
Rules and Regulations.
PERMISSION IS HEREBY GRANTED TO
NCDEQ DSCA Program (AECOM of North Carolina as Agent)
FOR THE CONSTRUCTION OF A MONITOR WELL SYSTEM consisting of three monitoring well owned by the NCDEQ
DSCA Program, near the subject site located along Church Street, in Mooresville, Iredell County. This Permit is issued in
accordance with the application received on June 1, 2022, in conformity with specifications and supporting data, all of
which are filed with the Department of Environmental Quality and are considered integral parts of this Permit.
This Permit is for well construction only and does not waive any provision or requirement of any other applicable law or
regulation. Construction of any well under this Permit shall be in strict compliance with the North Carolina Well
Construction Regulations and Standards (15A NCAC 02C .0100), and other State and Local Laws and regulations
pertaining to well construction.
If any requirements or limitations specified in this Permit are unacceptable, you have a right to an adjudicatory hearing
upon written request within 30 days of receipt of this Permit. The request must be in the form of a written petition
conforming to Chapter 150B of the North Carolina General Statutes and filed with the Office of Administrative Hearings,
6714 Mail Service Center, Raleigh, North Carolina 27699-6714. Unless such a demand is made, this Permit is final and
binding.
This Permit will be effective for one year from the date of its issuance and shall be subject to other specified conditions,
limitations, or exceptions as follows:
1. Issuance of this Permit does not obligate reimbursement from State trust funds, if these wells are being installed as
part of an investigation for contamination from an underground storage tank or dry cleaner incident.
2. Issuance of this Permit does not supersede any other agreement, permit, or requirement issued by another agency.
3. The well(s) shall be located and constructed as shown on the attachments submitted as part of the Permit
application.
4. Each well shall have a Well Contractor Identification Plate in accordance with 15A NCAC 02C .0108(o).
5. Well construction records (GW-1) for each well shall be submitted to the Division of Water Resources' Information
Processing Unit within 30 days of the well completion.
6. When the well is discontinued or abandoned, it shall be abandoned in accordance with 15A NCAC 02C .0113 and a
well abandonment record (GW-30) shall be submitted to the Division of Water Resources' Information Processing
Unit within 30 days of the well abandonment.
7. If the well penetrates any water -bearing zone that contains contaminated waters, the upper three feet of the well
shall be grouted within one day after the casing is set or the well abandoned.
8. Temporary wells must be permanently abandoned or converted to a permanent well within seven days (168 hours)
of completion of drilling the borehole.
Permit issued the 1st day of June 2022
FOR THE NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION
DocuSigned by:
A4 4uw H P: ue4
F161FB69A2D84A3...
NCRTiCAPOLvvNA
peparlmen! of Environmental Quality
Andrew H. Pitner, P.G., Assistant Regional Supervisor
Division of Water Resources
By Authority of the Environmental Management Commission
North Carolina Department of Environmental Quality Division of Water Resources
Mooresville Regional Office 1610 East Center Avenue, Suite 301 I Mooresville, North Carolina 28115
704.663.1699
Permit No. # WM0301211
North Carolina Department of Environmental Quality j Division of Water Resources
Mooresville Regional Office 1610 East Center Avenue, Suite 301 I Mooresville, North Carolina 28115
704.663.1699