Loading...
HomeMy WebLinkAbout20140159 Ver 1_FW Craver Road Revision_20140604Strickland, Bev From: Eu|iss,Amv Sent: Wednesday, ]une 04, 2014 11:04 AM To: Thomas, John T]R SAW (JohnIThomasJR@usace.army.mi|);VVanucha'Dave Cc: 8raquet, Stephanie; Jones, Matthew VV Subject: FVV: Craver Road Revision Attachments: 178P.0.R.18 Revised Impact Dravvings.pdf John and Dave, VVe had to make a couple minor field adjustments on this project. VVe need 38'of temporary impacts to the UT. That's an additional 2(Yof temporary impacts. The additional impacts are associated with the temporary driveway relocation and a water line relocation. In addition, the plan was to pipe the UT into thevvingvva||. We are now going to outlet the pipe on the f|oodp|ainbench. Plan revisions are attached. Let me know if you need anything else. Frmmm:]ones Matthew VV Sent: Tuesday, ]uneO],2O14 2:37 PM To: Eu|iss, Amy Cm: Anderson, Cad A Subject: Craver Road Revision Amy, Here are the revised drawings for the permitted areas at Craver Road. Let me know if you need anything additional or if any questions come up. Thanks, Matt Matthew Jones, PE Division Bridge Program Manager NCU{JT Division 9 375 Silas Creek Parkway Winston-Salem, NC 27127 (336) 747-7800 smallomrr*qwna*ncwm and nnmmimeona*,immuNwommww o puumpZcon:JmI mw and may u*aimmmwammli'dpmmwm 1 n FLOODPLAIN BENCH NG ELEV: ]M.9 �—_ CHANNEL DETAILS FLOODPLAIN BENCH ELEV: 744.9 FLOODPLAIN BENCH - - - -- NG _ ELEV :7463 E%ISTING FLOOOPLAIN BENCH _ — — STREAM BEO ELEV: 7463 NO — AND RIP RAP CLABS T TVP 1 ON CHANNEL BANRS o MATTING REID i• Typ GEOTEXOLE ONLY (TYP) COIR FIBER MATTING •� VARIES I VARIER VARIER COIR FIBER MATTING AND RIP RAP CLASS I ON CHANNEL BANKS 1 TYP i'TYP 0 72J9' t FLOOOPLAIN BENCH �Yp) VARIES VARIES VARIES COIR FIBER MATTING -L- STA12 +80.00 t T.- ' TO S' 8''TO Sb' EST. GLASS I RIP PAP =IC TONS RA -I. TERLS'A B..,SCHULTZ � \ COIR FIBER MATTING EST. GEOTEXTILE FABRIC =102 BY +40 END TIP 17BP.9R.18 EST. EXCAVATION `SIDE SLOPES ARE 2:1 OUTLET CHANNEL IMPROVEMENT 5/' PEDESTAL , 3O .',54 EST. CLASS 1 RIP RAP - 177 TONS '\ �'� �'� ^l'� `I'�`�' `�'' /(DESTROYED 30' OWNER UNKNOWN —L— POT Sto. 14 +4904 I� EST. GEOTEXTILE FABRIC =118 BY ''... +•' p / POWER ID "32542090 .R20 I INLET CHANNEL IMPROVEMENT FLOODPLAIN BENCH NG ELEV: ]M.9 �—_ FLOODPLAIN FLOODPLAIN BENCH ELEV: 744.9 —NO - - - -- STREAM 13EO — — _ BE LE HYDRAUUCS CON FIBER EST. 102 SY GT AND RIP RAP CLABS T TVP 1 ON CHANNEL BANRS o MATTING REID i• Typ moo. � c'i',• PEES ^r�. v ONLY (TYP) COIR FIBER MATTING •� VARIES I VARIER VARIER COIR FIBER MATTING CRAVER +50 '� MICHAEL R. CRAVER S'TO O` TO 8'TO 0' 0 72J9' EST.EXCAVARIP -L- STA12 +80.00 t ® CHANNEL EXCAVATION EST. GLASS I RIP PAP =IC TONS RA -I. TERLS'A B..,SCHULTZ � \ -L- STA14 +14.00 Im EST. GEOTEXTILE FABRIC =102 BY +40 END TIP 17BP.9R.18 `SIDE SLOPES ARE 2:1 OUTLET CHANNEL IMPROVEMENT 5/' PEDESTAL , 3O .',54 DAVIDSON COUNTY LOW IMPACT BRIDGE STRUCTURE 280069 IS 09- 11-060 WBS 17BP.9.R.18 TIP 1711P.9.R18 a 0 Zn NO N o° PROJECT REFERENCE NO. FLOODPLAIN CLASS l RIP RAP I7BP.9.R.l8 BENCH AND GEOTEXTILE RW SHEET NO. EST. 140 TONS HYDRAUUCS CON FIBER EST. 102 SY GT ,,OH ICAUJriO o MATTING REID FLOODPLAIN moo. � c'i',• PEES ^r�. v REID CRAVER ', ',✓ 30, Rr;P BENCH 033400 CRAVER +50 '� MICHAEL R. CRAVER 0 72J9' * +60 \ -L- STA12 +80.00 t +35 . 55 QRLMAI�NG & r TERLS'A B..,SCHULTZ � \ -L- STA14 +14.00 Im +40 END TIP 17BP.9R.18 O Ae \ \- 5/' PEDESTAL , 3O .',54 '\ �'� �'� ^l'� `I'�`�' `�'' /(DESTROYED 30' OWNER UNKNOWN —L— POT Sto. 14 +4904 I� \ +•' p / POWER ID "32542090 .R20 I i N t9 25' 5920'W , n LO I URAU _350 ' a 0 Zn NO N o° PROJECT REFERENCE NO. SHEEP NO. I7BP.9.R.l8 4 RW SHEET NO. ROADWAY DESIGN HYDRAUUCS ENGINEER ENGINEER ,,OH ICAUJriO pUI(Iiuug2 CARO�� a2.•FESSJ•iy.�i 02 9 moo. � c'i',• PEES ^r�. v . 20 = C SEAL r; '- '4� SEAL p• _ 033400 PLANS PREPARED BY: PARSONS BRINCKERHOFF 434 FAYCFITATLLE STREET — t t I i VER _ . DA A CULVERT HYDRAULIC DATA DESIGN DISCHARGE 950 CFS r- .. Ale-1-0140 . L .ST /L 20. - - - - DESIGN FREQUENCY = 25 YRS -- { `JN BOX 'CGtL ERT EN a BO } I U li`EI DESIGN HW ELEVATION = 7506 FT BASE DISCHARGE /406 CFS ; ASE FREQUENCY = l00 YRS _ BASE HW ELEVATION - 752.36 FT LTA t0 -L- ,ST /2�• O I OVERTOPPING DISCHARGE= 1700 CFS Fly 54 3 E X59 y ' : OVERTOPPING FREQUENCY= — OVERTOPPING ELEVATION 7542 FT ROADSIDE ENVIRONMENTAL UNIT DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS ant.stas.N.C. 2012 STANDARD SPECIFICATIONS 77ESE EROSION AND SEDBIIENT CONTROL PLANS COMPLY WITH 771E REGUL477ON3 SET FORTH BY TON NCG -01000 GENERAL CONSTRUCTION FERMIT EFFECTIVE AUGUST 3, 2011 ISSUED BY THE NORTH GAROLM DEPARTMENT OF ENVIRONMENT AND NATVRAL RESOURCES DIMSION OF WATER QUALITY. NOTES: ANY DEVIATION FROM OPTIONS GIVEN WILL REQUIRE PRIOR APPROVAL BY ENGINEER. ADDITIONAL EROSION CONTROL DEVICES MAY NEED TO BE INSTALLED AS DIRECTED BY THE ENGINEER. EROSION CONTROL PLAN REID CRAVER REID yy acv CRAVER ,- " ® y .c -ADLA REMOVP MICHALL R. CR;,1.'ER CLASS /RIP RAP AND GEOTEXIILE EST. 140 TONS EST. 102 SY GT now tw- 2012 STANDARD DRAWINGS 1605.01 Temporary Silt Fence 1633.01 Temporary Rock Silt Check Type A 1606.01 Special Sediment Control Fence 1630.06 Special Stilling Basin 1622.01 Temporary Berms and Slope Drains 163LOI Matting InstaBefion B WETLANDS — — WLB -- sill. IlsR.imFi., fixmbnl 1605.01 Temporary Silt Fences- ____.- --I}I-----Hi----HF-- J RESA Be�CHULTZ 1606.01 Special sediment Co.(,.] F...., ZZ 1630.06 j —.— —WLB— -..-.. <e \. Temporary Rock Silt Check Type -A with kla(ting and Polyaorylamide (PAM) ..... _.- \ 1633.02 Temporary Rack Silt Check Type-11 Wattle ___ _ _. Wattle with Palyacrylamide. (PAM) O 31 1 L ll 1'`... -' WLB— — — — — —, -`. " ® y .c -ADLA REMOVP MICHALL R. CR;,1.'ER CLASS /RIP RAP AND GEOTEXIILE EST. 140 TONS EST. 102 SY GT now tw- 2012 STANDARD DRAWINGS 1605.01 Temporary Silt Fence 1633.01 Temporary Rock Silt Check Type A 1606.01 Special Sediment Control Fence 1630.06 Special Stilling Basin 1622.01 Temporary Berms and Slope Drains 163LOI Matting InstaBefion B WETLANDS — — WLB -- sill. IlsR.imFi., fixmbnl 1605.01 Temporary Silt Fences- ____.- --I}I-----Hi----HF-- 1606.01 Special sediment Co.(,.] F...., ZZ 1630.06 special Stilling Basin -- --- -..-.. 1633.01 Temporary Rack Silt Check Type -A Temporary Rock Silt Check Type -A with kla(ting and Polyaorylamide (PAM) ..... _.- \ 1633.02 Temporary Rack Silt Check Type-11 Wattle ___ _ _. Wattle with Palyacrylamide. (PAM) O 2. PLACE PHASE IMPERVIOUS DIKES 3. MAINTAIN CHANNEL FLOW THROUGH EXISTING STREAM 4. CONSTRUCT UPSTREAM AND DOWN STREAM PORTIONS OF NORTH BARREL, WINGWALLS, AND CHANNEL IMPROVEMENTS 5. REMOVE PHASE 1IMPERVIOUS DIKES "9 '`\ �� - IMPERVIOUS DIKE', PE[ � \ CHANNEL VEMENTS SPECIAL, DES �i �STILUNG Tj \ \ B�N _T _ -_ Y - \ —1 UNKNOWN DIKE &TEL o 402.25 Ey PFDr'11 Al LIE --TP.OYED 0 • NF Ur, ;NOWN PO 4E� ID- 32542090 ✓Y GRAD 350 4 I W 1L PUE _ - - PUE 1 ARP,Y E. HEGE z n 0 m n z i') ci'� �p a7 N -) O J CONSTRUCTION SEQUENCE - PHASE II I. PLACE PHASE II IMPERVIOUS DIKES 2. DIVERT CHANNEL FLOW THROUGH NORTH BARREL 3. CONSTRUCT UPSTREAM AND DOWN STREAM PORTIONS OF CENTER AND SOUTH BARRELS, WINGWALLS, AND CHANNEL IMPROVEMENTS 4. REMOVE SPECIAL STILLING BASIN 5. REMOVE PHASE II IMPERVIOUS DIKES PEE \ - IMPERVIOUS DIKE DES CHFJJNN IMPR\ M N]S__ SPEC/AL' �� 1 STILLING BASIN IMPERVIOUS ���--Z- - IMPERVIOUS -- - - -- DIKE CULVERT CONSTRUCTION SEQUENCE - PHASE I 1S - NOTES - - -. I. CULVERT CONSTRUCTION SHALL BE PERFORMED IN ONLY DRY OR ISOLATION SECTIONS OF CHANNEL. 2. IMPERVIOUS DIKES ARE TO BE USED TO ISOLATE WORK FROM STREAM FLOW AS NECESSARY. 3. ALL GRADED AREAS SHALL BE STABILIZED WITHIN 24 HOURS. 4. MAINTENANCE OF STREAM FLOW OPERATIONS SHALL BE INCIDENTAL TO THE WORK. THIS INCLUDES POLYETHYLENE SHEETING, DIVERSION PIPES, AND HOSES. 5. PUMPS AND HOSES SHALL BE SUFFICIENT TO DEWATER THE WORK AREA. 6. THE CONTRACTOR SHALL NOT PUMP SEDIMENT - LADEN WATER DIRECTLY INTO STREAM. FOR DE- WATERING OF CULVERT SITES, THE CONTRACTOR SHALL FILTER SEDIMENT -LADEN WATER THROUGH SPECIAL SEDIMENT BASIN. R OV ;, I CULVERT CONSTRUCTION SEQUENCE - PHASE II Scale 1" = 30' 30' 0 30' 60, rx ffi