Loading...
HomeMy WebLinkAbout20120887 Ver 2_Mitigation Information_20140611Burdette, Jennifer a From: Kim Williams [kwilliams @lmgroup.net] Sent: Wednesday, June 11, 2014 9:55 AM To: Burdette, Jennifer a Subject: FW: Epiphany School Project (SAW- 2012 - 00906) Attachments: Brice Creek MB Transfer Form—Epiphany School Project_Executed.pdf Hi Jennifer Attached is the mitigation transfer form for the Epiphany School project (DWQ# 12 -0887 V2) signed by the Brice Creek Mitigation Bank. Thanks, Kim Kim Williams I Environmental Scientist Land Management Group, Inc I Environmental Consultants Direct 452- 0011 x 1908 1 Cell: 910.4-71.5035 35 1 Fax: 91 {1.452. {: 060 Email: kwiIIiams(@Imgroup. net `4vebsit :www.lmgroup.net 3805 VVrights: illy Ave.. SUite 15 1 VViliningto n. NC 28403 1 I I i From: Daniel Coggin [ma i Ito: daniel (a)coQginassetmanagement.com] Sent: Wednesday, June 11, 2014 9:50 AM To: Kim Williams Cc: emily.c.greer(a)usace.army.mil; Todd Tugwell; Tyler Crumbley Subject: Epiphany School Project (SAW- 2012 - 00906) Kim, Good morning. Please find attached a copy of the executed Compensatory Mitigation Responsibility Transfer Form for the recent credit purchase by the Epiphany School of Global Studies (SAW- 2012 - 00906) from the Brice Creek Mitigation Bank. I have Cc'd Ms. Emily Greer (Corps Project Manager) and Mr. Todd Tugwell (Brice Creek MB Corps Contact) on this email as well. Please let me know if I can be of any additional service to you and your client. Have a great day, Daniel Daniel S. Coggin President Coggin Asset Management, LLC P.O. Box 476 Amory, MS 38821 662- 825 -0058 http:/ /www.cogginassetmanagement.com/ ARMY CORPS ENGINEERS Wilmington District Compensatory Mitigation Responsibility Transfer Form Permittee: Epiphany School of Global Studies c/o Mr. David Wang Action ID SAW -2012 -00906 Project Name: Epiphany School Expansion County: Craven Instructions to Permittee: The Permittee must provide a copy of this form to the Mitigation Sponsor, either an approved Mitigation Sank or the North Carolina Ecosystem Enhancement Program (NCEEP), who will then sign the form to verify the transfer of the mitigation responsibility. Once the Sponsor has signed this form, it is the Permittee's responsibility to ensure that to the U.S. Army Corps of Engineers (USACE) Project Manager identified on page two is in receipt of a signed copy of this form before conducting authorized impacts, unless otherwise specified below. If more than one mitigation Sponsor will be used to provide the mitigation associated with the permit, or if the impacts and/or the mitigation will occur in more than one 8-digit Hydrologic Unit Code (HUC), multiple forms will be attached to the permit, and the separate forms for each Sponsor and /or HUC must be provided to the appropriate mitigation Sponsors. Instructions to Sponsor: The sponsor must verify that the mitigation requirements shown below are available at the identified site. By signing below, the Sponsor is accepting full responsibility for the identified mitigation, regardless of whether or not they have received payment from the Permittee. once the form is signed, the Sponsor must update the appropriate ledger and provide a copy of the signed form to the Permittee and to the USACE Bank /In -Lieu Fee Program Manager. The Sponsor must also comply with all reporting requirements established in their authorizing instrument. Permitted Impacts and Compensatory Mitigation Requirements: Permitted HUC and Basin: 03020204, Neuse /Pasquotank /White Oak Stream Impacts (linear feet) Wetland Impacts (acres) Riparian Riparian Warm Cool Cold Riverine Non - riverine Non- Riparian Coastal I I I I 1 1,0 1 1 *If more than one mitigation sponsor will be used for the permit, only include impacts to be mitigated by this sponsor. Compensatory Mitigation Requirements: 8 -digit HUC and Basin: 03020204, Neuse /Pasquotank /White Oak Stream Mitigation (credits) Wetland Mitigation (credits) Warm Cool Cold Riparian Riparian Non- Riparian Coastal Riverine Non- riverine i Mitigation Site Debited: Brice Creek Mitigation Bank (List the name of the bank to be debited. For umbrella banks, also list the specific site. For NCEEP, list NCEEP. If the NCEEP acceptance letter identifies a specific site, also list the specific site to be debited). Section to be completed by the Mitigation Sponsor Statement of Mitigation Liability Acceptance: I, the undersigned, verify that I am authorized to approve mitigation transactions for the Mitigation Sponsor shown below, and I certify that the Sponsor agrees to accept full responsibility for providing the mitigation identified in this document (see the table above), associated with the USACE Permittee and Action ID number shown. I also verify that released credits (and /or advance credits for NCEEP), as approved by the USACE, are currently available at the mitigation site identified above. f=urther, I understand that if the sponsor fails to provide the required compensatory mitigation, the USACE Wilmington District Engineer may pursue measures against the Sponsor to ensure compliance associated with the mitigation requirements. Mitigation Sponsor Name Name of Sponsor's Autho of sponsor's Autho Daie of Signature Page 1 of 2 Form Updated 2 October, 2012 USACE Wilmington district Compensatory Mitigation Responsibility Transfer Form, Page 2 Conditions for Transfer of Compensatory Mitigation Credit: • Once this document has been signed by the Mitigation Sponsor and the USACE is in receipt of the signed farm, the Permittee is no longer responsible for providing the mitigation identified in this form, though the Permittee remains responsible for any other mitigation requirements stated in the permit conditions. • Construction within jurisdictional areas authorized by the permit identified on page one of this form can begin only after the USAGE is in receipt of a copy of this document signed by the Sponsor, confirming that the Sponsor has accepted responsibility for providing the mitigation requirements listed herein. For authorized impacts conducted by the North Carolina Department of Transportation (NCDOT), construction within jurisdictional areas may proceed upon permit issuance,- however, a copy of this form signed by the Sponsor must be provided to the USACE within 30 days of permit issuance. NCDOT remains fully responsible for the mitigation until the USACE has received this form, confirming that the Sponsor has accepted responsibility for providing the mitigation requirements listed herein. • Signed copies of this document must be retained by the Permittee, Mitigation Sponsor, and in the USACE administrative records for both the permit and the Bank /ILF Instrument. It is the Permittee 's responsibility to ensure that the USACE Project Manager (address below) is provided with a signed copy of this form. • If changes are proposed to the type, amount, or location of mitigation after this form has been signed and returned to the USACE, the Sponsor must obtain case -by -case approval from the USACE Project Manager and /or North Carolina Interagency Review Team (NCIRT). If approved, higher mitigation ratios may be applied, as per current. District guidance and a new version of this form must be completed and included in the USACE administrative records for both the permit and the Bank /ILF Instrument. Comments /Additional Conditions: None This form is not valid unless signed by the mitigation Sponsor and USACE Project Manager. For questions regarding this form or any of the conditions of the permit authorization, contact the Project Manager at the address below. USACE project Manager: USACE Field Office: Emily Greer Washington Regulatory Field Office US Army Corps of Engineers 2407 West Fifth Street Washington, NC 27889 emily.c.greer @usace.army.mil Digitally signed by GREER ..EMILY .C.13B532539R (U �R O -Q ©Q. ou =PK , -USA, (r EREMILY.C.13853253n— GEEREMI Y.C,,,,253,, —. Qste: 2014.01.0613:46:29 - 05'00" USACE project Manager Signature January 6, 2014 Date of Signature Current Wilmington District mitigation guidance, including information on mitigation ratios, functional assessments, and mitigation hank location and availability, and credit classifications (including stream temperature and wetland groupings) is available at http: / /ribits.usace.army. mil. Page 2of2 The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at our website at t ttp :fifre�ulatory.vsacesu,ruey.coml to complete the survey online.