Loading...
HomeMy WebLinkAbout20220682 Ver 1_More Info Received_20220617Strickland, Bev From: Michael Brame <mbrame@pilotenviro.com> Sent: Friday, June 17, 2022 10:25 AM To: Hopper, Christopher D CIV USARMY CESAW (USA); Homewood, Sue Subject: [External] RE: SAW-2021-02369 / Trinity Street / Carolina Container / Thomasville / Davidson County, NC - Request for Information Attachments: 7322.1_Carolina Container_PCN_6.17.2022.pdf; 2022-06-13 Carolina Container_USACE Exhibit.pdf CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Good Morning Chris and Sue, I hope all is well. Our responses are in red below. Please let me know if you need additional information to process the PCN. Thank -you. Sincerely, Michael T. Brame 336.708-4620 (c) 336.310.4527 (o) PO Box 128 Kernersville, NC 27285 www.pilotenviro.com mbrame@pilotenviro.com PILOT 1.."' PILOT E N V I R O N M E N T A L, I N C From: Hopper, Christopher D CIV USARMY CESAW (USA) <Christopher.D.Hopper@usace.army.mil> Sent: Friday, June 10, 2022 8:50 AM To: Michael Brame <mbrame@pilotenviro.com> Cc: Homewood, Sue <sue.homewood@ncdenr.gov> Subject: SAW-2021-02369 / Trinity Street / Carolina Container / Thomasville / Davidson County, NC - Request for Information Hey Michael: Its been a while, I hope you're well. I've reviewed the above referenced project and it looks pretty solid; thanks for that. I'd generally ask about retaining walls to minimize impacts, but the proposed spur seems to preclude that option. I've got a couple questions to help me complete the verification to utilize NWP 39. 1) All impacts are lumped into single 'fill' categories. Please break the impacts down into structure fill and railroad fill. I may stack these and issue a 39 for the structure and a 14 for the rail. The impacts have been broken down. The revised exhibit is attached. Additionally, the impact table from the PCN has been revised and is attached. 2) A portion of the spur would be constructed off -site. Please confirm there are no potential waters to be impacted outside what was reviewed during the PJD. There are no surface waters or wetlands located off -site in the area where the spur is proposed to be located. 1 3) What dates were you on -site? I've found it eases the USFWS reviews for Schweinitz's sunflower if biologists were there during the flowering window. I'd also like to include some verbiage about the extension from the existing tracks (off -site). Can you provide some language for me to use? We were on -site on November 1, 2021 and November 30, 2021 (accompanied by Jean Gibby and Sue Homewood. The portion of the railroad track to be constructed off -site contains existing gravel and rip rap that is part of the railroad bed, a narrow strip of densely vegetated tree saplings and a sliver of a mowed field. The railroad is regularly maintained through spraying herbicides. We did not observe habitat for Schweinitz's sunflower. Thanks in advance, Chris Christopher D. Hopper Regulatory Specialist U.S. Army Corps of Engineers Regulatory Division 3331 Heritage Trade Drive, Suite 105 Wake Forest, NC 27587 0: (919) 554-4884, Ext. 35 M: (919) 588-9153 We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey can be accessed by copying and pasting the following link into your web browser: https://regulatory.ops.usace.army.mil/customer-service-survey/. Thank you for taking the time to visit this site and complete the survey. 2 D. Proposed Impacts Inventory 1. Impacts Summary la. Where are the impacts associated with your project (check all that apply): O Wetlands ❑ Buffers ❑ Pond Construction ❑ Streams - tributaries O Open Waters 2. Wetland Impacts If there are wetland impacts proposed on the site, complete this table for each wetland area impacted. 2a. Site # 2a1. Impact Reason/Type 2b. Impact Duration 2c. Wetland Name 2d. Wetland Type 2e. Forested ? 2f. Jurisdiction Type 2g. Impact Area (ac) W1 Fill (Incl. Riprap) Permanent WA Bottomland Hardwood Forest Yes Both 0.039 W2 Other Permanent WA Bottomland Hardwood Forest Yes Both 0.004 W3 Choose one Temp/ Perm Click to enter Choose one Y/N Choose one Click to enter W4 Choose one Temp/ Perm Click to enter Choose one Y/N Choose one Click to enter W5 Choose one Temp/ Perm Click to enter Choose one Y/N Choose one Click to enter W6 Choose one Temp/ Perm Click to enter Choose one Y/N Choose one Click to enter 2g1. Total temporary wetland impacts 0 ac 2g2. Total permanent wetland impacts 0.043 ac 2g3. Total wetland impacts 0.043 ac 2h. Comments: In order to develop the site, it is necessary to construct buildings, a railroad spur and parking areas on the site. The railroad spur will impact 0.004 acres of wetland and the building will impact a 0.039 acres wetland. Page 9 of 21 PCN Form - Version 1.5, September 2020 3. Stream Impacts If there are perennial or intermittent stream/ tributary impacts (including temporary impacts) proposed on the site, complete this table for all stream/ tributary sites impacted. ** All Perennial or Intermittent streams must be verified by DWR or delegated local government Site # 3a. Impact Reason/ Type 3b. Impact Duration 3d. Stream Name 3e. Stream Type 3f. Jurisdiction Type 3g. Stream Width (avg ft) 3h. Impact length (linear ft) S1 Choose one Temp/ Perm Click to enter Per/Int Choose one Click to enter Click to enter S2 Choose one Temp/ Perm Click to enter Per/Int Choose one Click to enter Click to enter S3 Choose one Temp/ Perm Click to enter Per/Int Choose one Click to enter Click to enter S4 Choose one Temp/ Perm Click to enter Per/Int Choose one Click to enter Click to enter S5 Choose one Temp/ Perm Click to enter Per/Int Choose one Click to enter Click to enter S6 Choose one Temp/ Perm Click to enter Per/Int Choose one Click to enter Click to enter S7 Choose one Temp/ Perm Click to enter Per/Int Choose one Click to enter Click to enter S8 Choose one Temp/ Perm Click to enter Per/Int Choose one Click to enter Click to enter S9 Choose one Temp/ Perm Click to enter Per/Int Choose one Click to enter Click to enter S10 Choose one Temp/ Perm Click to enter Per/Int Choose one Click to enter Click to enter S11 Choose one Temp/ Perm Click to enter Per/Int Choose one Click to enter Click to enter S12 Choose one Temp/ Perm Click to enter Per/Int Choose one Click to enter Click to enter S13 Choose one Temp/ Perm Click to enter Per/Int Choose one Click to enter Click to enter S14 Choose one Temp/ Perm Click to enter Per/Int Choose one Click to enter Click to enter S15 Choose one Temp/ Perm Click to enter Per/Int Choose one Click to enter Click to enter 3i1. Total jurisdictional ditch impact: Click to enter. linear ft 3i2. Total permanent stream impacts: Click to enter. linear ft 3i3. Total temporary stream impacts: Click to enter. linear ft 3i4. Total stream and ditch impacts: Click to enter. linear ft 3j. Comments: Streams impacts are not proposed. Page 10 of 21 PCN Form - Version 1.5, September 2020 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S., individually list all open water impacts in the table below. 4a. Site # 4b. Impact Reason/ Type 4c. Impact Duration 4d. Waterbody Name 4e. Waterbody Type 4e1. Jurisdiction Type 4f. Impact area (ac) 01 Bank Stabilization/ Fill (Incl. Riprap) Permanent Unnamed (PA) Pond Both 0.050 02 Other Permanent Unnamed (PA) Pond Both 0.051 03 Choose one Temp/ Perm Click to enter. Choose one Choose one Click to enter. 04 Choose one Temp/ perm Click to enter. Choose one Choose one Click to enter. 4g. Total temporary open water impacts Click to enter. ac 4g. Total permanent open water impacts 0.101 ac 4g. Total open water impacts 0.101 ac 4h. Comments: In order to develop the site, it is necessary to construct buildings, a railroad spur and parking areas on the site. The railroad spur will impact 0.051 acres of pond and the building will impact a 0.050 acres of pond. 5. Pond or Lake Construction If pond or lake construction is proposed, complete the table below. (*This does NOT include offline stormwater management ponds.) 5a. Pond ID # 5b. Proposed use or purpose of pond 5c. Wetland Impacts (ac) 5d. Stream Impacts (ft) 5e. Upland Impacts (ac) Flooded Filled Excavated Flooded Filled Excavated P1 Choose one Click tc enter. Click to enter. Click to enter. Click to enter. Click to enter. Click to enter. Click to enter. P2 Choose one Click to enter. Click to enter. Click to enter. Click to enter. Click to enter. Click to enter. Click to enter. 5f. Total Click to enter. Click to enter. Click to enter. Click to enter. Click to enter. Click to enter. Click to enter. 5g. Comments: Pond or lake construction is not proposed. 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no.: Click to enter. 5i. Expected pond surface area (acres): Click to enter. 5j. Size of pond watershed (acres): Click to enter. 5k. Method of construction: Click to enter. Page 11 of 21 PCN Form - Version 1.5, September 2020 i 1 I 1 1 1 � I 1 I 1I 1 I II + I I _ Pry : 6787.824 0428 ED WARDS MICHELLE A DJB1509 P,G.921 ZONING R10 ` I PIN 6737.02A9.1A09 ---ARTPEZ LUISP.R.A ALA)ON LIH Z _--`-- --`--� M0.829.NB NG RIO • ' 1 J SAVANNAH PN' 6PKp78T-0GN2ARi120-0046 + MMON 0.6 NULL P.G. NULL ZONING 180 PIN :6TB7-02-69-2144 CLARC ANGELA MARIE D.B 1361 P.0.1110 20HNG R10 1 I I ph : 6767-0-69-1249 PH : 6757-0289-2350 I PIN: 6787-0.2.89.0289 ALEJANDROALEFDS 0.B2353 P.0.1601 ARREDDND0 ARI'URO NICHOLSON DONNIE BJR I I BUTZ JAAES O BLRZ 1 SOTELLO CLAUDIA LI213ETH ZONING RIO I ERLINDAT I ANLA i I MRM11521 Pa. 10 0. NI17 NNG R10 ZONING R10 1 11I F-11 1 PM 6737-0IA9-0209 HUNT Dims TURNER D$ 2158 P.G.1 ZONING RIO PH:6787-028812 TARHEEL PROPERTIES D.131559 P.61.618 HONING L11 PIN: 6797-02-69-0097 BROOKS TERRY W DE 2207 P.G. 6E4 LCNNG R10 PIN : 6787-02439.1819 SAVANNAH PR ODNDO.000MGN DJS NULL P.G. NULL DONNE, R6 PN: 671I7-02$9-001I PIN :67B7-02L&1927 L SAVAN1A71 PK CONDO -COMMON SAVANNAH Ric CONDO CCYION 1 LAB NULL P.G. NULL D9 NULL P.G. NULL ZONING RE ICHNG RI 11 I I I 1 PIN :9767-02-0&4&S N 13213L13AGNI1LL 1 L! ! 1 pE 140 P.G.726 11! I N ZONHG R10 0.0NULL ULL7-02-06N SAVANNAH PH COICO-COMMON 1+ 1N 1 HP.C. NULL Z01ING RB 1 %N : 6761-02S66679 LRZ LARRY DJ8851 P.G.504 ZONING M, %N : 6787-02.56.6979 HLL HOLDINGS LLC D.E. 14O0 P.G.1176 ZONINO N1 EXISTING PARKING LOT EXISTING PARKING LOT 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 EXISTING BUILDING PIN : 6787-02-69-8203 THOMASVILLE HOBSWG AUTHORRY 2.13 569 P.6.07 ZONING RE EXISTING PARKING LOT PIN : 6787-02-68-5397 CAROLINA CONTAINER COMPANY D.B 2034 P.G.1126 ZONING M 1 PIN: 6767-0256-2920 THOMASIILLE HOMING AUTHOPJ Y 2.6 5E0 RC. op ZONING RE PIN: 6787-02-795920 J & H COI✓PORATIGN OF THE CAROLINAS OE 1266 P.G.281 ZONNG M1 PROPOSED BUILDING 221,000 SF EX. WETLANDS AND POND TO BE - DISTURBED (SEE USAGE EXHIBIT) PIN 6767-02.77-0820 YOUNIS GAR) J YOUNTS PANSY DS 171 p.c.1963 ZONING M1 PIN 16787.02.29.9650 JSWNIAUSIM Tosileiso DB 2455 P.C.129 ZONING R10 PRI : 6767-02-09-1415 GW L.OFLIN 0 ASSOCIATE83 LLC DEL 2974 P.G.1699 2CNNG M1 PIN : 8767-0279-9394 HANSON ROBERT K TRUSTEE HANSON BARBARA Olt 2459 P.O.'773 ZONING M1 -•' PIN:E767-02-07-8707 WHITEWDOD HOLdHG0 LLC 0E 2233 P.G274 ZONING M1 EX HYDRANT EX. RAIL ROAD EX SSMH EX HYDRANT EX SSMH� SITE DATA: RILEY MILTON T JR PIN: 6787-02-78-8703 Q.B. 1205 P.G. 487 RILEY MILTON T JR PIN: 6787-02-78-6615 D.B. 1560 P.G.835 RILEY MILTON T JR PIN: 6787-02-78-4603 D.B.1612 P.G.671 TOTAL AREA: 10.44 ACRES ZONING: EXISTING ZONING: M1 PROPOSED ZONING: N/A DEVELOPMENT STANDARDS: MINIMUM LOT WIDTH: 100' FRONT SETBACK:35' SIDE SETBACK: 20' REAR SETBACK: 20' MAXIMUM HEIGHT:35' TRrNITY STREET VICINITY MAP 111=2000' DRAWN BY: MB CHECKED BY: BC DATE: 05/13/2022 PROJECT NO.:03480.003 REF. NO.: - SCALE:1" = 100' PRELIMINARY NOT FOR CONSTRUCTION SHEET PROP. BLDG 20' OF PERM. DISTURBANCE POND AREA: 4451 SF TO BE DISTURBED (2199 SF STRUCTURAL DISTURBANCE) (2252 SF RAILROAD DISTURBANCE) u• 07 00 PROP. ASPHALT WETLAND AREA 1: 930 SF TO BE DISTURBED (930 SF STRUCTURAL DISTURBANCE) WETLAND AREA 2: 664 SF TO BE DISTURBED (664 SF STRUCTURAL DISTURBANCE) s a WETLAND AREA 3: 278 SF TO BE DISTURBED (99 SF STRUCTURAL DISTURBANCE) (179 SF RAILROAD DISTURBANCE) a a sF PROP. RAIL 45OF PERM. DISTURBANCE EX. RAILROAD 20 0 10 20 40 80 SITE DATA: RILEY MILTON T JR PIN: 6787-02-78-8703 D.B. 1205 P.G. 487 RILEY MILTON T JR PIN: 6787-02-78-6615 D.B. 1560 P.G.835 RILEY MILTON T JR PIN: 6787-02-78-4603 D.B.1612 P.G.671 TOTAL AREA: 10.44 ACRES ZONING: EXISTING ZONING: M1 PROPOSED ZONING: N/A DEVELOPMENT STANDARDS: MINIMUM LOT WIDTH: 100' FRONT SETBACK:35' SIDE SETBACK: 20' REAR SETBACK: 20' MAXIMUM HEIGHT:35' DISTURBANCE BREAKDOWN WETLAND: WETLAND AREAS: 1: 930 SF 2: 664 SF 3: 278 SF STRUCTURAL WETLAND DISTURBANCE: 1693 SF RAILROAD WETLAND DISTURBANCE: 179 SF TOTAL WETLAND DISTURBANCE: 1872 SF STRUCTURAL POND DISTURBANCE: 2199 SF RAILROAD POND DISTURBANCE: 2252 SF TOTAL POND DISTURBANCE: 4451 SF TOTAL DISTURBANCE: TOTAL STRUCTURAL DISTURBANCE: 3892 SF TOTAL RAILROAD DISTURBANCE: 2431 SF TOTAL AREA OF DISTURBANCE: 6323 SF (0.145 ACRES) LEGEND: WETLAND AREA: POND AREA: STRUCTURAL DISTURBANCE AREA: RAILROAD DISTURBANCE AREA: TRINITY sTREET 1 VICINITY MAP 1"=2000' z 0 1- U 0 DRAWN BY: JRA CHECKED BY: BC DATE: 06/13/2022 PROJECT NO.:03480.003 REF. NO.: - SCALE: 1" = 20' PRELIMINARY NOT FOR CONSTRUCTION SHEET