Loading...
HomeMy WebLinkAbout20210877 Ver 1_USACE Requeset for More Information_20220617Strickland, Bev From: Bailey, David E CIV USARMY CESAW (USA) <David.E.Bailey2@usace.army.mil> Sent: Friday, June 17, 2022 10:11 AM To: Michael Brame; Scott Wallace Cc: Homewood, Sue Subject: [External] Request for Additional Information: SAW-2022-01175; Northborough / High Point / Guilford County Follow Up Flag: Follow up Flag Status: Flagged CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. All, Thank you for your PCN, dated 5/20/2022, for the above referenced project. I have reviewed the information and need clarification before proceeding with verifying the use of Nationwide Permit (NWP) 29 (https://saw- reg.usace.army.mil/NWP2021/NWP29.pdf). Please submit the requested information below (via e-mail is fine) within 30 days of receipt of this Notification, otherwise we may deny verification of the use of the Nationwide Permit or consider your application withdrawn and close the file: 1) NWP 29 Regional Condition C.b states that discharges of dredged or fill material into waters of the U.S., including wetlands, within the floodway or mapped FEMA 100-year floodplain resulting in permanent above -grade fills are not authorized by this NWP. As such, NWP 29 cannot be used to authorize the proposed discharge of fill material in Stream SA. NWP 14 (https://saw-reg.usace.army.mil/NWP2021/NWP-14.pdf) has no such restriction; please notify us if you would like the proposed project to be evaluated for use of NWP 14; 2) Thank you for your delineation map and supporting information. To further support your delineation, please provide data forms and pictures from the following locations: a. Just west of the proposed crossing, at lat/lon: 36.076503, -80.022251; b. An area on the west side of Stream SA, near the edge of the FEMA floodplain, at lat/lon: 36.078148, - 80.022540; c. An area in the southwestern corner of the property, just east of West Fork Deep River, at lat/lon: 36.074511, -80.024109. If any changes to your delineation are warranted, please prove the updated delineation map; 3) Plan Sheets C-3A, C-3B, and "Preliminary Sketch Plan" (no Sheet number included) contain inconsistencies and do not show the entirety of the overall Northborough development. Please provide a cohesive plan sheet showing the entirety of the overall Northborough development to enable our review of this development for indirect and secondary impacts, including the following: a. All portions of the proposed development, including the southwestern quadrant of the development; b. Grading limits, roads, lots, utilities, and the wetland/stream delineation (including any changes made per item 2 above); c. Correct inconsistencies shown on the current plan sheets, such as stormwater facilities shown on the "Preliminary Sketch Plan" but not on plan sheet C-3A, etc. 4) The PCN proposes a sewer line crossing involving the temporary discharge of fill material into 0.012 acre (30 linear feet) of stream channel. However, this crossing does not appear on the plan sheets provided. Please provide a plan sheet clearly shown the location, plan and profile views, and dewatering strategy for this i crossing. Provide also the revegetation plan (live stakes and/or appropriate riparian seed mix specifications) to stabilize the stream banks upon completion of sewer installation. Please let me know if you have any questions. Sincerely, Dave Bailey David E. Bailey, PWS Regulatory Project Manager US Army Corps of Engineers CE-SAW-RG-R 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Mobile: (919) 817-2436 Office: (919) 554-4884, Ext. 30. Fax: (919) 562-0421 Email: David.E.Bailey2@usace.army.mil We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at: https://regulatory.ops.usace.army.mil/customer-service-survey/ Thank you for taking the time to visit this site and complete the survey. From: RaleighNCREG <RaleighNCREG@usace.army.mil> Sent: Monday, May 23, 2022 1:51 PM To: Michael Brame <mbrame@pilotenviro.com> Cc: Bailey, David E CIV USARMY CESAW (USA)<David.E.Bailey2@usace.army.mil> Subject: SAW-2022-01175 (205 Model Farm Road / High Point NC / Guilford County) Good Afternoon, Your Pre -construction Notification (PCN) NWP with JD request has been received, assigned action ID SAW-2022-01175. Please refer to the action ID in all correspondence. Dave- docs forwarded in your folder Thank you, Josephine Schaffer From: Michael Brame <mbrame@pilotenviro.com> Sent: Friday, May 20, 2022 3:14 PM To: RaleighNCREG <RaleighNCREG@usace.army.mil> Cc: Bailey, David E CIV USARMY CESAW (USA) <David.E.Bailey2@usace.army.mil>; Homewood, Sue <sue.homewood@ncdenr.gov>; Heather LaGamba <hlagamba@pilotenviro.com> Subject: [URL Verdict: Neutral][Non-DoD Source] Pilot Project 6139.2 - Northborough Subdivision - PCN Application with JD request 2 The application is also being uploaded to the NCDEQ-DWR portal. Please let me know if you need additional information. Sincerely, Michael T. Brame 336.708-4620 (c) 336.310.4527 (o) PO Box 128 Kernersville, NC 27285 www.pilotenviro.com mbrame@pilotenviro.com PI PILOT E N V I R O N M E N T A L, I N C 3