HomeMy WebLinkAbout20220415 Ver 1_USACE Permit_20220512Strickland, Bev
From: Standridge, Billy W CIV USARMY CESAW (USA) <Billy.W.Standridge@usace.army.mil>
Sent: Friday, June 17, 2022 10:04 AM
To: Tankard, Robert
Subject: [External] RE: CONNOR LOT 1C, WATER QUALITY PROJECT NO. 20220415
Attachments: SAW-2022-00611_Conner Lot 1C NWP-18_12May2022.pdf; SAW-2022-00611
_Mitigation Transfer Form.pdf
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
Report Spam.
Thanks Robert. Here is a copy of the Corps permit for this project.
Thanks,
Billy
Billy W. Standridge
Regulatory Specialist
U.S. Army Corps of Engineers
Washington Regulatory Field Office
2407 W. 5th Street
Washington, NC 27889
(910) 251-4595
From: Tankard, Robert <robert.tankard@ncdenr.gov>
Sent: Friday, June 17, 2022 9:55 AM
To: conners@embarqmail.com
Cc: dougdaec@gmail.com; Standridge, Billy W CIV USARMY CESAW (USA) <Billy.W.Standridge@usace.army.mil>; Jones,
Jerry R <Randall.Jones@ncdenr.gov>
Subject: [Non-DoD Source] CONNOR LOT 1C, WATER QUALITY PROJECT NO. 20220415
John and Dauan, please find attached is the individual certification for the project above. Please note that no
construction or fill can begin until all permits have been secured and the mitigation has been taken care of and
documentation submitted to this office. If you should have any questions, please let me know.
Thanks!
Robert
Robert Tankard
Assistant Regional Supervisor
Division of Water Resources
Water Quality Regional Operations Section
943 Washington Square Mall
Washington, NC 27889
252-948-3921 office
252-975-3716 fax
Robert.tankard@ncdenr.gov
1
thing tpares
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
2
U.S. ARMY CORPS OF ENGINEERS
WILMINGTON DISTRICT
Action Id. SAW-2022-00611 County: Hyde U.S.G.S. Quad: NC -Ocracoke
GENERAL PERMIT (REGIONAL AND NATIONWIDE) VERIFICATION
Permittee:
Address:
Telephone Number:
E-mail:
Size (acres)
Nearest Waterway
USGS HUC
John Conner
P.O. Box 71
Buxton, NC 27949
(252) 216-5624
conners(a, embarq mail.com
Nearest Town Ocracoke
River Basin Pamlico
Coordinates Latitude: 35.10745
Longitude: -75.9862
Location description: The proiect area is located at the intersection of Lighthouse Road and Martha Jane Lane in Ocracoke,
Hyde County, NC. The site is identified at Lot 1C. The property totals 0.18 acres and contains 0.13 acres of wetlands.
0.18
Pamlico Sound
03020105
Description of projects area and activity: This verification authorizes the filling of 0.099 acres of wetlands associated with the
construction of a single-family residence on the above -described proiect area.
Applicable Law(s): N Section 404 (Clean Water Act, 33 USC 1344)
❑ Section 10 (Rivers and Harbors Act, 33 USC 403)
Authorization: Nationwide Permit 18 for Minor Discharges
SEE ATTACHED NWP GENERAL, REGIONAL, AND/OR SPECIAL CONDITIONS
Your work is authorized by the above referenced permit provided it is accomplished in strict accordance with the attached
Conditions, your application signed and dated 3/14/2022, and the enclosed plans John Conner Site Plan — Nationwide Permit
dated 3/7/2022. Any violation of the attached conditions or deviation from your submitted plans may subject the permittee to a
stop work order, a restoration order, a Class I administrative penalty, and/or appropriate legal action.
This verification will remain valid until the expiration date identified below unless the nationwide and/or regional general permit
authorization is modified, suspended or revoked. If, prior to the expiration date identified below, the nationwide and/or regional general
permit authorization is reissued and/or modified, this verification will remain valid until the expiration date identified below, provided
it complies with all requirements of the modified nationwide permit. If the nationwide and/or regional general permit authorization
expires or is suspended, revoked, or is modified, such that the activity would no longer comply with the terms and conditions of the
nationwide permit, activities which have commenced (i.e., are under construction) or are under contract to commence in reliance upon
the nationwide and/or regional general permit, will remain authorized provided the activity is completed within twelve months of the
date of the nationwide and/or regional general permit's expiration, modification or revocation, unless discretionary authority has been
exercised on a case -by -case basis to modify, suspend or revoke the authorization.
Activities subject to Section 404 (as indicated above) may also require an individual Section 401 Water Quality Certification. You
should contact the NC Division of Water Resources (telephone 919-807-6300) to determine Section 401 requirements.
For activities occurring within the twenty coastal counties subject to regulation under the Coastal Area Management Act (CAMA), prior
to beginning work you must contact the N.C. Division of Coastal Management in Washington, NC, at (252) 946-6481.
This Department of the Army verification does not relieve the permittee of the responsibility to obtain any other required Federal, State
or local approvals/permits. If there are any questions regarding this verification, any of the conditions of the Permit, or the Corps of
Engineers regulatory program, please contact Billy W. Stndridge at,(910) 251-4595or Billy.w.standridge(a usace.army.mil.
Corps Regulatory Official:
Expiration Date of Verification: 3/14/2026
Date: 05/12/2022
The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we
continue to do so, please complete the Customer Satisfaction Survey located at
http://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0
Copy furnished:
Agent: Atlantic Environmental Consultants, LLC
Doug Dorman
Address: P.O. Box 3266
Kitty Hawk, NC 27949
Telephone Number: (252) 261-7707
E-mail: dougdaecAgmail.com
SAW-2022-00611
SPECIAL CONDITIONS
a. In order to compensate for impacts associated with this permit, mitigation shall be provided in accordance
with the provisions outlined on the most recent version of the attached Compensatory Mitigation Responsibility
Transfer Form. The requirements of this form, including any special conditions listed on this form, are hereby
incorporated as special conditions of this permit authorization.
DELLA NvF G
prD:95oo- SKILL
1528
PROPOSED SILT FENCE
\III,
440
LOT 1B
6,608.27 Sq.Ft.
0.15 AC.
PEAT BOILFILTER SYSTEM
MARTHA JANE LN. (16' R/w)
LOT 1C
LEGEND
- PROPOSED CONCRETE DRIVEWAY
- PROPOSED WETLAND FILL ( 4,350 SF)
- • - - - - 404 WETLAND LINE
10' 0'
JOHN CONNER SITE PLAN
NATIONWIDE PERMT
OCRACOKE - HYDE COUNTY - NORTH CAROLINA
20' 40' 60'
GRAPHIC SCALE 1 "= 20'
ATLANT/C ENV/ROM/ENTAL CONSULTANTS, LLC
P.O. BOX 3266,, K/TTY H,4WK, N.C. 27949
(252)261-7707, e-mall dougdaecOgmai/.com
FILE: CONNER 2022 DATE: 03/07/22 REVISED:
Action ID Number: SAW-2022-00611 County: Hyde
Permittee: John Conner
Project Name: Conner / Lot 1C Lighthouse Rd - Ocracoke / Hyde
Date Verification Issued: 05/12/2022
USACE Project Manager: Billy W. Standridge
Upon completion of the activity authorized by this permit and any mitigation required by the permit,
sign this certification and return it to the following address:
US ARMY CORPS OF ENGINEERS
WILMINGTON DISTRICT
Attn: Billy W. Standridge
Washington Regulatory Office
U.S Army Corps of Engineers
2407 West Fifth Street
Washington, North Carolina 27889
or
Billy.w.standridge@usace.army.mil
Please note that your permitted activity is subject to a compliance inspection by a U. S. Army Corps of
Engineers representative. Failure to comply with any terms or conditions of this authorization may
result in the Corps suspending, modifying or revoking the authorization and/or issuing a Class I
administrative penalty, or initiating other appropriate legal action.
I hereby certify that the work authorized by the above referenced permit has been completed in
accordance with the terms and condition of the said permit, and required mitigation was completed in
accordance with the permit conditions.
Signature of Permittee Date
U.S. ARMY CORPS OF ENGINEERS
Wilmington District
Compensatory Mitigation Responsibility Transfer Form
Permittee: John Conner Action ID: SAW-2022-00611
Project Name: Conner / Lot 1C Lighthouse Rd - Ocracoke / Hyde County: Hyde
Instructions to Permittee: The Permittee must provide a copy of this form to the Mitigation Sponsor, either an approved
Mitigation Bank or the North Carolina Division of Mitigation Services (NCDMS), who will then sign the form to verify the
transfer of the mitigation responsibility. Once the Sponsor has signed this form, it is the Permittee's responsibility to ensure
that Wilmington District Project Manager identified on page two is in receipt of a signed copy of this form before conducting
authorized impacts, unless otherwise specified below. If more than one Mitigation Sponsor will be used to provide the
mitigation associated with the permit, or if the impacts and/or the mitigation will occur in more than one 8-digit Hydrologic
Unit Code (HUC), multiple forms will be attached to the permit, and the separate forms for each Sponsor and/or HUC must
be provided to the appropriate Mitigation Sponsors.
Instructions to Sponsor: The Sponsor verifies that the mitigation requirements (credits) shown below have been released
and are available at the identified site. By signing below, the Sponsor is accepting full responsibility for the identified
mitigation, regardless of whether they have received payment from the Permittee. Once the form is signed, the Sponsor
must update the bank ledger and provide a copy of the signed form and the updated ledger to the Permittee, the Project
Manager who issued the permit, the Bank Project Manager, and the District Mitigation Office (see contact information on
page 2). The Sponsor must also comply with all reporting requirements established in their authorizing instrument.
Permitted Impacts and Compensatory Mitigation Requirements:
Permitted Impacts Requiring Mitigation*
8-digit HUC and Basin: 03020105, Pamlico Sound
Stream Impacts (linear feet)
Wetland Impacts (acres)
Warm
Cool
Cold
Riparian Riverine
Riparian Non-Riverine
Non -Riparian
Coastal
0.1
*If more than one mitigation sponsor will be used for the permit, only include impacts to be mitigated by this sponsor.
Compensatory Mitigation Requirements:
8-digit HUC and Basin: 03020105, Pamlico Sound
Stream Mitigation (credits)
Wetland Mitigation (credits)
Warm
Cool
Cold
Riparian Riverine
Riparian Non-Riverine
Non -Riparian
Coastal
0.2
Mitigation Site Debited: NCDMS
(List the name of the bank to be debited. For umbrella banks, also list the specific site. For NCDMS, list NCDMS. If the NCDMS
acceptance letter identifies a specific site, also list the specific site to be debited).
Section to be completed by the Mitigation Sponsor
Statement of Mitigation Liability Acceptance: I, the undersigned, verify that I am authorized to approve mitigation
transactions for the Mitigation Sponsor shown below, and I certify that the Sponsor agrees to accept full responsibility for
providing the mitigation identified in this document (see the table above), associated with the USACE Permittee and Action
ID number shown. I also verify that released credits (and/or advance credits for NCDMS), as approved by the Wilmington
District, are currently available at the mitigation site identified above. Further, I understand that if the Sponsor fails to provide
the required compensatory mitigation, the USACE Wilmington District Engineer may pursue measures against the Sponsor to
ensure compliance associated with the mitigation requirements.
Mitigation Sponsor Name:
Name of Sponsor's Authorized Representative:
Signature of Sponsor's Authorized Representative Date of Signature
Page 1 of 2
Form Version 10 June 2020 updated
CESAW-RG (File Number, SAW-2022-00611)
Conditions for Transfer of Compensatory Mitigation Credit:
• Once this document has been signed by the Mitigation Sponsor and the District is in receipt of the signed form, the
Permittee is no longer responsible for providing the mitigation identified in this form, though the Permittee remains
responsible for any other mitigation requirements stated in the permit conditions.
• Construction within jurisdictional areas authorized by the permit identified on page one of this form can begin only after
the District is in receipt of a copy of this document signed by the Sponsor, confirming that the Sponsor has accepted
responsibility for providing the mitigation requirements listed herein. When NCDMS provides mitigation for authorized
impacts conducted by the North Carolina Department of Transportation (NCDOT), construction within jurisdictional areas
may proceed upon permit issuance; however, a copy of this form signed by NCDMS must be provided to the District
within 30 days of permit issuance. NCDOT remains fully responsible for the mitigation until the District has received this
form, confirming that the Sponsor has accepted responsibility for providing the mitigation requirements listed herein.
• Signed copies of this document must be retained by the Permittee, Mitigation Sponsor, and in the USACE administrative
records for both the permit and the Bank/ILF Instrument. It is the Permittee's responsibility to ensure that the District
Project Manager (address below) is provided with a signed copy of this form.
• If changes are proposed to the type, amount, or location of mitigation after this form has been signed and returned to
the District, the Sponsor must obtain case -by -case approval from the District Project Manager and/or North Carolina
Interagency Review Team (NCIRT). If approved, higher mitigation ratios may be applied, as per current District guidance
and a new version of this form must be completed and included in the District administrative records for both the permit
and the Bank/ILF Instrument.
Comments/Additional Conditions: A letter from NCDMS, confirming they are willing and able to accept the applicant's
compensatory mitigation responsibility, dated 3/11/2022 was included with the preconstruction notification.
This form is not valid unless signed below by the District Project Manager and by the Mitigation Sponsor on Page 1. Once
signed, the Sponsor should provide copies of this form along with an updated bank ledger to: 1) the Permittee, 2) the
District Project Manager at the address below, 3) the Bank Manager listed in RIBITS, and 4) the Wilmington District
Mitigation Office, 3331 Heritage Trade Drive, Suite 105, Wake Forest, NC 27587 (or by email to SAWMIT@usace.army.mil).
Questions regarding this form or any of the permit conditions may be directed to the District Mitigation Office.
USACE Project Manager:
USACE Field Office:
Email:
Billy W. Standridge
Washington Regulatory Office
US Army Corps of Engineers
2407 West Fifth Street
Washington, North Carolina 27889
Billy.w.standridge@usace.army.mil
SACE Project Man: :er Signature
05/12/2022
Date of Signature
Current Wilmington District mitigation guidance, including information on mitigation ratios, functional assessments, and
mitigation bank location and availability, and credit classifications (including stream temperature and wetland groupings) is
available at http://ribits.usace.army.mil.