Loading...
HomeMy WebLinkAbout20041488 Ver 9_Thunder Swamp Phase II Mitigation Transfer Certificate_20220603fires June 3, 2022 360o Glenwood Avenue, Suite 100 Raleigh, NC 27612 Mitigation Credit Transfer Certificate Prepared by Environmental Banc & Exchange, LLC DR Horton — Terramor LLC 7208 Falls of Neuse Road, Suite 201 Raleigh, NC 27615 Thunder Swamp Phase II Bank Parcel ID: DWR Project # 2021-0306v2 Riparian Buffer Credits Purchased: 10,856.00 (ft2) 8 digit-HUC — 03020201 Neuse River Basin Project Name: Winston Pointe, DWR Project #: 20041488 V9 You have elected to fulfill your permitted nutrient mitigation requirements for the Winston Pointe project by paying into the RES 2022 Phase II Umbrella Mitigation Bank (Thunder Swamp Phase II Site). This Bank has received full payment for buffer mitigation for the above referenced project. Riparian buffer impacts occurred in the Neuse River Basin. The amount of buffer mitigation required is specified and verified by DWR in project #20041488 v9 and is 10,856 (ft2). Thunder Swamp Phase II Buffer is providing the total amount of 10,856 (ft2). You must also comply with any other state, federal or local government permits, or authorization associated with this activity including SL 2009-337, An Act to Promote Compensatory Mitigation Banks. This payment into the Bank is not transferable. If you have any questions or need additional information, please contact me at 919-209-1055 or astaley@res.us. Thank you, Amy Staley Credit Sales Manager cc: Christopher Hopper - U.S. Army Corps of Engineers (electronic) Camden Brunick — Soil & Environmental Consultants (electronic) Reese Bridges — D.R. Horton (electronic) res.us