Loading...
HomeMy WebLinkAbout20200597 Ver 2_Thunder Swamp Phase II Mitigation Transfer Certificate_20220607fires June 7, 2022 360o Glenwood Avenue, Suite ioo Raleigh, NC 27612 Mitigation Credit Transfer Certificate Prepared by Environmental Banc & Exchange, LLC Highfill Infrastructure Engineering, P.C. 2703 Jones Franklin Road, Suite 201 Cary, NC 27518 Thunder Swamp Phase II Bank Parcel ID: DWR Project # 2021-0306v2 Riparian Buffer Credits Purchased: 45.72 (ft2) 8 digit-HUC — 03020201 Neuse River Basin Project Name: Big Branch Sewer, DWR Project #: 20200597 v2 You have elected to fulfill your permitted nutrient mitigation requirements for the Big Branch Sewer project by paying into the RES 2022 Phase II Umbrella Mitigation Bank (Thunder Swamp Phase II Site). This Bank has received full payment for buffer mitigation for the above referenced project. Riparian buffer impacts occurred in the Neuse River Basin. The amount of buffer mitigation required is specified and verified by DWR in project #20200597 v2 and is 2,568.00 (ft2). Thunder Swamp Phase II Buffer is providing 45.72 (ft2), the remaining credits have been purchased elsewhere. You must also comply with any other state, federal or local government permits, or authorization associated with this activity including SL 2009-337, An Act to Promote Compensatory Mitigation Banks. This payment into the Bank is not transferable. If you have any questions or need additional information, please contact me at 919-209-1055 or astaley@res.us. Thank you, �� OI 1 Amy Staley Credit Sales Manager cc: DWR - Katie Merritt, Nutrient Offset Bank Coordinator DWR — Colleen Cohn Highfill Infrastructure Engineering — Eddie Sasser res.us