HomeMy WebLinkAbout20200597 Ver 2_Thunder Swamp Phase II Mitigation Transfer Certificate_20220607fires
June 7, 2022
360o Glenwood Avenue, Suite ioo
Raleigh, NC 27612
Mitigation Credit Transfer Certificate
Prepared by
Environmental Banc & Exchange, LLC
Highfill Infrastructure Engineering, P.C.
2703 Jones Franklin Road, Suite 201
Cary, NC 27518
Thunder Swamp Phase II Bank Parcel ID: DWR Project # 2021-0306v2
Riparian Buffer Credits Purchased: 45.72 (ft2)
8 digit-HUC — 03020201
Neuse River Basin
Project Name: Big Branch Sewer, DWR Project #: 20200597 v2
You have elected to fulfill your permitted nutrient mitigation requirements for the Big Branch Sewer project by paying into
the RES 2022 Phase II Umbrella Mitigation Bank (Thunder Swamp Phase II Site).
This Bank has received full payment for buffer mitigation for the above referenced project. Riparian buffer impacts occurred
in the Neuse River Basin. The amount of buffer mitigation required is specified and verified by DWR in project #20200597
v2 and is 2,568.00 (ft2). Thunder Swamp Phase II Buffer is providing 45.72 (ft2), the remaining credits have been purchased
elsewhere.
You must also comply with any other state, federal or local government permits, or authorization associated with this activity
including SL 2009-337, An Act to Promote Compensatory Mitigation Banks. This payment into the Bank is not transferable.
If you have any questions or need additional information, please contact me at 919-209-1055 or astaley@res.us.
Thank you,
�� OI
1
Amy Staley
Credit Sales Manager
cc: DWR - Katie Merritt, Nutrient Offset Bank Coordinator
DWR — Colleen Cohn
Highfill Infrastructure Engineering — Eddie Sasser
res.us