Loading...
HomeMy WebLinkAboutSW5140801_Supplement-EZ Form_20220615SUPPLEMENT-EZ COVER PAGE LOAD SUPPLEMENT FORMS PROJECT INFORMATION 1 Project Name ACFT 2 Project Area ac 7.4 3 Coastal Wetland Area ac 0 4 Surface Water Area ac 0 5 Is this project High or Low Density? High 6 Does this protect use an off -site SCM? No COMPLIANCE WITH 02H .1003(4) 7 Width of vegetated setbacks provided feet N/A 8 Will the vegetated setback remain vegetated? Yes 9 Is BUA other that as listed in .1003 4 c-d out of the setback? Yes 10 1 Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMs: 11 Infiltration System 0 12 Bioretention Cell 0 13 Wet Pond 2 14 Stormwater Wetland 0 15 Permeable Pavement 0 16 Sand Filter 0 17 Rainwater Harvesting RWH 0 18 Green Roof 0 19 Level Spreader -Filter Strip LS-FS 0 20 Disconnected Impervious Surface (DIS) 0 21 Treatment Swale 0 22 Dry Pond 0 23 StormFilter 0 24 Silva Cell 0 25 113ayfilter 0 26 lFilterra 0 LOAD SUPPLEMENT FORMS DESIGNER CERTIFICATION 27 Name and Title: Frank Slinsk , P.E., Senior Project Manager 28 Organization: Timmons Group 29 Street address: 5410 Trinity Road, Suite 102 30 City, State, Zip: Raleigh, NC, 27607 31 Phone numbers : 919 866-4505 32 Email: frank.slinsky@timmons.com Certification Statement: I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. ` `,111f1111f1i►yI CAR���/i�r� r 03I IF NIL !�! i 11111 Seal Signature of Designer 5/20/2022 Date DRAINAGE AREAS 1 Is this a high density project? Yes 2 If so, number of drainage areas/SCMs 2 3 Is all/part of this project subject to previous rule versions? No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site 1 2 4 T pe of SCM Wet Pond A Wet Pond B 5 Total BUA in project (sq ft 72313 sf 61705 sf 10608 sf 6 New BUA on subdivided lots (subject to ermitting) (sq ft sf sf sf 7 New BUA outside of subdivided lots (subject to permitting) (sf) 70878 sf 61705 sf 9173 sf 8 Offsite - total area (sq ft) 9 Offsite BUA (sq ft 10 Breakdown of new BUA outside subdivided lots: - Parking (sq ft sf - Sidewalk (sq ft 45984 sf 7587 sf - Roof (sq ft sf - Roadway s ft sf sf - Future (sq ft 15721 sf 1586 sf - Other, please specify in the comment box below (sq ft) sf 11 New infiltrating permeable pavement on subdivided lots (sq ft sf sf 12 New infiltrating permeable pavement outside of subdivided lots (sq ft sf sf 13 Exisitng BUA that will remain no subject to ermitting) (sq ft sf 1435 sf 14 Existing BUA that is already ermitted (sq ft sf sf 15 Existing BUA that will be removed (sq ft sf sf 16 Percent BUA 50% 19% 17 Design storm inches 1 in 1 in 18 Design volume of SCM cu ft 5147 cf 1032 cf 19 Calculation method for design volume Simple Method Simple Method ADDITIONAL INFORMATION 20 Please use this space to provide any additional information about the drainage area(s): Wet pond B will not have an increase in impervious area or total drainage I' Wet pond B will not be modified as part of this project. WET POND 1 Drainage area number 1 (Pond A) 2 Design volume of SCM (cu ft) 5147 cf GFNFRAI MDC FROM n7H .1n5n 3 Is the SCM sized to treat the SW from all surfaces at build -out? Is the SCM located away from contaminated soils? Yes 4 Yes 5 What are the side slopes of the SCM (H:V)? 3:1 6 Does the SCM have retaining walls, gabion walls or other engineered side slopes? No 7 Are the inlets, outlets, and receiving stream protected from erosion (10-year storm)? Yes 8 Is there an overflow or bypass for inflow volume in excess of the design volume? Yes 9 What is the method for dewatering the SCM for maintenance? Drawdown Orifice 10 If applicable, will the SCM be cleaned out after construction? Yes 11 Does the maintenance access comply with General MDC (8)? Yes 12 Does the drainage easement comply with General MDC (9)? No 13 If the SCM is on a single family lot, does (will?) the plat comply with General MDC (10)? 14 Is there an O&M Agreement that complies with General MDC (11)? Yes 15 Is there an O&M Plan that complies with General MDC (12)? Yes 16 Does the SCM follow the device specific MDC? Yes 17 Was the SCM designed by an NC licensed professional? Yes IWFT PONn MOG FRAM 09H 1nF3 181 Method used I SA/DA 19 Has a stage/storage table been provided in the calculations? Yes 20 Elevation of the excavated main pool depth (bottom of sediment removal) (fmsl) 477.00 21 Elevation of the main pool bottom -(top of sediment removal) (fmsl) 478.00 22 Elevation of the bottom of the vegetated shelf (fmsl) 483.50 23 Elevation of the permanent pool (fmsl) 484.00 24 Elevation of the top of the vegetated shelf (fmsl) 484.50 25 Elevation of the temporary pool (fmsl) 484.83 26 Surface area of the main permanent pool (square feet) 4213.00 27 Volume of the main permanent pool (cubic feet) 13460 cf 28 Average depth of the main pool (feet) 3.19 ft 29 Average depth equation used Equation 2 301 If using equation 3, main pool perimeter (feet) N/A 31 If using equation 3, width of submerged veg. shelf (feet) N/A 32 Volume of the forebay (cubic feet) 2389 cf 33 Is this 15-20% of the volume in the main pool? Yes 34 Clean -out depth for forebay (inches) 72 in 35 Design volume of SCM (cu ft) 5148 cf 36 Is the outlet an orifice or a weir'? Orifice 371 If orifice, orifice diameter (inches) 1.3 in 38 If weir, weir height (inches) N/A 39 If weir, weir length (inches) N/A 40 Drawdown time for the temporary pool (days) 2.8 41 Are the inlet(s) and outlet located in a manner that avoids short- circuiting? Yes 42 Are berms or baffles provided to improve the flow path? No 431 Depth of forebay at entrance (inches) 72 in 44 Depth of forebay at exit (inches) 60 in 45 Does water flow out of the forebay in a non -erosive manner? Yes 46 Width of the vegetated shelf (feet) 6 ft 47 Slope of vegetated shelf (H:V) 6:1 48 Does the orifice drawdown from below the top surface of the permanent pool? Yes 49 Does the pond minimize impacts to the receiving channel from the 1- yr, 24-hr storm? Yes 50 Are fountains proposed? (If Y, please provide documentation that MDC(9) is met.) No 51 Is a trash rack or other device provided to protect the outlet system? Yes 52 Are the dam and embankment planted in non -clumping turf grass? Yes 53 Species of turf that will be used on the dam and embankment Bermuda Has a planting plan been provided or the vegetate shelf.? Yes ADDITIONAL INFORMATION 55 Please use this space to provide any additional information about the wet pond(s): The property is a 5,000 acre, state-owned parcel. It is exempt from recording drainage easements. Wet pond B will not have an increase in impervious area or total drainage area. Wet pond B will not be modified as part of this project. Wet Pond 3 4:54 PM 5/19/2022