HomeMy WebLinkAbout20130918 Ver 2_Application_20140606d,,.5TAlF o.�
tJ
•� p.w.ifld
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
PAT L. MCCRORY
GOVERNOR
June 6, 2014
U. S. Army Corps of Engineers
Regulatory Field Office
3331 Heritage Trade Drive, Suite 105
Wake Forest, NC 27587
ATTN: Mr. Dave Bailey
NCDOT Coordinator
ANTHONY J. TATA
SECRETARY
SUBJECT: Request for Modification to the Section 404 Individual Permit and Section
401 Water Quality Certification for the proposed Greensboro Eastern Loop
from US 70 Relocation to SR 2303 (Lawndale Drive), Guilford County, Division
7. WBS Element No. 34821.1.1, TIP Nos. U -2525B and U- 2525C.
REFERENCE: USACE Individual Permit Action ID SAW- 2005- 21386, dated April 15, 2014.
NCDWR Project No. 20130918, Certification No. 3978, dated February 6, 2014.
Dear Sir:
The purpose of this letter is to request a modification to the United States Army Corps of
Engineers ( USACE) Individual Permit and North Carolina Division of Water Resources
Certification for the above referenced project. The requested modification is to account for
additional temporary wetland impacts associated with utility impacts (see attached Utility
Drawings) to the project since approval of the above permits. A temporary impact (0.14 acre) to
Utility Drawing Site W1 wetland is needed to stage the horizontal directional drill pullback pipe
and provide access for the drill rig and supporting equipment. The contractor will use mats or
other measures to reduce disturbance. Following construction, the affected wetland will be
restored to its original grade and contour, seeded with native wetland vegetation, and allowed to
naturalize.
A copy of this permit modification application and its distribution list will be posted on the
NCDOT website at https: / /connect.ncdot.gov /resources/ Environmental /Pages /default.aspx.
Thank you for your time and assistance with this project. Please contact Greg Price at either
gwprice@ncdot.gov or (919) 707 -6148 if you have any questions or need additional information.
Sincerely,
/Richard W. Hancock, P.E., Manager
Project Development and Environmental Analysis Unit
Cc: NCDOT Permit Application Standard Distribution List
MAILING ADDRESS: LOCATION:
NC DEPARTMENT OF TRANSPORTATION TELEPHONE: 919 - 707 -6000 CENTURY CENTER, BUILDING B
PROJECT DEVELOPMENT & ENVIRONMENTAL ANALYSIS UNIT FAX: 919- 212 -5785 1020 BIRCH RIDGE DRIVE
1598 MAIL SERVICE CENTER RALEIGH NC 27610
RALEIGH NC 27699 -1548 WEBSITE:NCDOT.GOV
C9
03
03
0)
0)p
69�sfl
� {A
� 64
� ke
�4pQ
to EAz
Y(0Q�
J)(BW
0) N3N
� FAz
(fl 63 (A
14
69
Ht (A
69
1-'1'11
I " v/
2612 B3] 1 94 2939 I % �-l.•` ]
e ^Zfihe4z J zesz ` 0 gaVrtlP�Buro� z1i0 za
NI RB42
2 44 \ 26J0
]]0
2))6 OJE T
I
R
��
2848
Rfi6R -
% I,f RB61 8650 7 )fi
Rfi] 416
1R))0 ]I6JAVC. 1
snY ]ORd IS R J161 317 304 31
Joz 3 4
VICINITY MAP
PO
�O
Y6M6 "'6 "9
��lwrllllll
T �r
/
/
SEE UO-4
UTILITYEPERMIIT PLANR
R"
:i
WAN
Jill
J-1
END BRID
J IJ
BE B GE
STA. 275 +00.00 -L- END TIP PROJECT
<
\ UT SO H BUFFALO CREEK
/
END U -25258 ACQUISTI N
BEGIN CONSTRUCTION ? /
SRVI- STA 10 +12.34
/
2y\
s
\
BEGIN IDGE
'I-
\ -Y4- S A. 3+ 5.45
/,
o- BEGIN CONSTRUCTION
- 1 81)
00
UT NORTH B'bf • d0 CREEK
A / /
\oy -Y4- TA.1 +
E CONSTRUCTION /
l /
`hA,y
I
%
/ END BRIDGE /
\�\
1 -r
E D BRIDGE
BEGIN CONSTRUCTION \
\ ZRYI- STA 10 +00.00 /
/ -L- T + .5
\
END CONSTRUCTION
\
\
-YI- STA. 14 +10.00
\Q
-Y5- E IN
10
f
O
8
NS
STA. 11 +22.00 -L- BEGIN
TINPROJECT U -25258 </
/
BEGIN CONSTRUCTION
-Y4A- STA 70 +00.00
1 /
0+ 0
-Y6- STA 11 +50.00
-L- ST ZB+ 7.76
U7 N TH BUFFALO REEK
/
Z
OGEV +
FID
E 2+ 0.00
AE
'q
STA 46 +00.00
_Y22_ STA 45 +00.00
END CON5TF
_y4 STV-56:
R"
:i
WAN
Jill
-L- (GREENSBORO E ASTER"ORTHERN LOOP)
LINE 200 RELOCATION AREA
SEE SHEET UO-4 FOR
UTILITY PERMIT PLAN
T.I.P. NO. SHEET NO.
U -25256
UTILITY DESIGN BY..
_Q MA Engineering
GC CONSULTANTS, INC.
598 East Chatham Street Suite 137 Cary, NC 27511
Phone' 919 297 0220 Fax' 919 297 0221
Utility Permit Drawing
Sheet-- Lof -.'.
J-1
BEGIN -CONSIN.-go.
J IJ
BE B GE
STA. 275 +00.00 -L- END TIP PROJECT
<
6y
/
END U -25258 ACQUISTI N
BEGIN CONSTRUCTION ? /
SRVI- STA 10 +12.34
/
2y\
/\
�i nl �//
/
'I-
BEGIN BRIDGE
-L- STA 267 + 8.09
\�#
/,
o- BEGIN CONSTRUCTION
- 1 81)
00
UT NORTH B'bf • d0 CREEK
\oy -Y4- TA.1 +
l /
`hA,y
;TA.22+ 4.58
-Y1 - T 20 3.58 /
BE -'n - 15+ .0 I
END B D E
/ -L- STA 2 9 +88.34 y
\ Mirk
hp�
STRUCTION Rp I
I + 1. '40 �✓ /y \�
hp2
E TRN-/
STA 11 +50.00
p
O
�GO
AT.
\Q
-Y5- E IN
10
f
O
8
NS
ON
-Y7- STA 00.
V5- SR 282 / BEGIN IDG
/
\
0+ 0
-L- ST ZB+ 7.76
U7 N TH BUFFALO REEK
J
Z
OGEV +
FID
E 2+ 0.00
AE
'q
STA 46 +00.00
_Y22_ STA 45 +00.00
EiC
/ STA 27 +56.14
A. 10 +00.00
1
(1
/ END CONSTRUCTION
-Y26- STA 39 +75.00
a
J
E D TR T
-Y73- TA.131+ 0.00
UO-4 \ \/
NORTH BUFFALO CREEK
-L- (GREENSBORO E ASTER"ORTHERN LOOP)
LINE 200 RELOCATION AREA
SEE SHEET UO-4 FOR
UTILITY PERMIT PLAN
T.I.P. NO. SHEET NO.
U -25256
UTILITY DESIGN BY..
_Q MA Engineering
GC CONSULTANTS, INC.
598 East Chatham Street Suite 137 Cary, NC 27511
Phone' 919 297 0220 Fax' 919 297 0221
Utility Permit Drawing
Sheet-- Lof -.'.
J-1
BEGIN -CONSIN.-go.
J IJ
BE B GE
STA. 275 +00.00 -L- END TIP PROJECT
/
END U -25258 ACQUISTI N
BEGIN CONSTRUCTION ? /
SRVI- STA 10 +12.34
END CONSTRUCTION
SRVI -STA 25 \
�i nl �//
/
'I-
BEGIN BRIDGE
-L- STA 267 + 8.09
\�#
F E
UT NORTH B'bf • d0 CREEK
RIDGE
l /
`hA,y
;TA.22+ 4.58
-Y1 - T 20 3.58 /
BE -'n - 15+ .0 I
END B D E
/ -L- STA 2 9 +88.34 y
\ Mirk
hp�
STRUCTION Rp I
I + 1. '40 �✓ /y \�
hp2
//
/
GIN CQNSTRUCTIO� /
BEGIN CONSTRUCTION
,SV -Y22- STA 10 +00.00��u
J-1
D CONS'R+ (fiid \` I
J IJ
BE B GE
- A.5
RIDGE
`
;TA.22+ 4.58
1
IA- GSTAT25 +0888
�/ EYD8- OAS 10
.
AN CONSTRUCTION
+079.45
NO CONSTRUCTION
21A- STA 12 +64.11
-Y21- STA 35 +75.00
/
)NSTRUCTION
END CONSTRUCTION
STA 46 +00.00
_Y22_ STA 45 +00.00
r E D B DGE
/ STA 27 +56.14
1
(1
/ END CONSTRUCTION
-Y26- STA 39 +75.00
a
J
E D TR T
-Y73- TA.131+ 0.00
\
\
\
NO IM ACT �\
BUFFER ZON \
1 i-JS STREAM
BEGIN HOD - RIG SIDE
PROP. 90° BEND
STA. 10 +00.00
yos 200'
a�
BORE HOLE B 1
n
- - -- -- 0 - - - -- E - - - - - - - - - - - -
25'
68' DUKE = 68' DUKE POWER EASEMENT
POWER EASEMENT � f
PROP. TIE-IN TO EXISTING GAS LINE E f t
SEE DETAIL FOR LINE 200 ON SHEET * t
UO -3A
IWETLAND BOUNDARY
NO IMPACT �\
0
ilty Clay
N layey Sand
RR
1ty Sand
uni L
L "I" 11T
- o
14+
PIP
EXIT
.. .. .. .. ..
GL -1
STA 9+
8.37
D 6AS
L STA
105 +1
85 LT
181.6'
ELEV.
= 736
20
15'
BENDS TO
OF EXI
EXISTING
TING GA
PIPE
MAIN A
NOT SHOWN.
TIE 1N
10
P XR 2 Y
O
ORKSPA
E
STREAM BUFF R
JS
LIMIT
BORE HOLE B -1
rphos d Granitic Rock
Silt
0
PROIEC! REFERENCE NO. SHEET NO.
ode \ U -25258 UO -4
\ l7�ILRY DESIGN ENGINEER
\� Utility Permit Drawling
o \ Sheet 2 Qf J INCOMPLETE PLANS
O \ Y DO NOT USE FOR R/W ACQUISITION
\� ooyN PRELIMINARY PLANS
oo NOT use FOR CONSTRU
TEMPORARY CONSTRUCTION EASEMENT Oor CTION
(100' X 200') Jyg WETLAND W1 TEMPORARY UTILITY PERMIT DRAWING
BORE HOLE B -2
IMPACT = 0.14 ACRE 598 E. Chm °m sneee,
LIMA Engineering SUR. 131
\CONSULTANTS, INC. C. , N. C. 27511
\ PROP. 413 LF OF 101,
3 \ TRENCHLESS INSTALLATION
\ t t t t ! WETLAND
M \ * * * t * BOUNDARY
z TEMPORARY WORKSPACE NEEDED
ca * * * } } FOR BORE PIPE r)
s \ PuE END HOD - PIPE E 0
\ PROP. 90° B • y * f Z
\ 0 25'_ I STA. 14 +1 .61
I M Num'
ININ
1.21,011
- -121.7 LF
R = 1 T
@ 17.5"
PC STA 10 +44 09
ELEV. = 728. 1
90 BEND 3.5' C VER
GL 1 STA 0 +00.00
L TA 105 10.21 LIT iE
GL- a]/.% I I +al. 10 IPE EN RY
L S A 104+ 9.45 L -1 STA 14 +31.86
L � 759.4B
L STA 103+17.7,: RT 224.4'
R/ PNG ESMT TEMPORARY WORKSP CE
475' X 35'
- - -- -
61.0 LF
@ 11.5° 90° BEN - 3.5 COVER
GL -1 STA, 14 +12 61
L STA 103+26.3 RT 20J.2'
PC ST 13+70.90
o
ELEV. f= 741.
`--- 2 5.1 LF
R = 1,07
@ 17.5°
BORE FOLE B -2
SOIL STRATA
nTFrH
PT STA 1 +65.7
ELEV. = 721.80
GENERAL
\ 11+ 1
0 13+0v
14+
.. ..
.. .. .. .. ..
1. P
P
D 6AS
ALONG PROPOSED
LINE
OF
RILL. PROFILES
IROM
5
15'
15'
BENDS TO
OF EXI
EXISTING
TING GA
PIPE
MAIN A
NOT SHOWN.
TIE 1N
POINTS
OT VERI
-
3. C
\
OF WETLAND
AREAE
3'X30'
} 4 *
475'
HOLE LOCATIONS
30' X 30'
EXISTING PIPELINE
BE
LIMITE
HOLE
EXISTING
10" STEEL GAS LINE
HOLE
BELL HOLE
k___F\
�
TO BE ABANDONED �
* *
� y
y
y iBFyLL A
EICAVATION
STALL TIMBER
EBELL
- -
55 oQi ____ \__
WETLA
D AREAS
INSIDE
`
OR TIE -IN- - --
-- P55 - pl - - - - -1-
•
55
-FSS
�* *
*F(�R }TItE�N* *
PROP. TIE -IN TO EXISTING GAS LINE
HORI TAL (PLAN /P FILE)
HORIZONTAL RO
- - - \
-- - -
s IP -PS :- -
� � -A -
�+ -f- *
ET
• * • SEE DETAIL FOR LINE 200 0 N SHEET
50' 0' 50' 100'
- - - � - Ps
_ _
- - -
I
PIP
UO -3A
\
5.
I
,H STEEL
PIPE SFALL
BE REINSTALLED
\
ca
o0
PROP. NCDOT RIGHT OF WAY
VERTICAL (PROFILE)
ELEVATIONS
'
CENTEF
OF PIPE.
10' 0' 10' 20'
0
S LINE
p
WITHIN FROPOSED
TEMPORARY WORKSPACE
70 FT. VIDE
Yom`
\
dO
BE ACCJIRED
BN
PNG.
9. SEE
SHEET
UO -5 (
CESS PLAN)
FOR
ENTRANCE
TO SIT I.
�- PRO
-L-
LIGNMEN
RILL EXIT
- 11.5°
'__ EX
STING
I M Num'
ININ
1.21,011
- -121.7 LF
R = 1 T
@ 17.5"
PC STA 10 +44 09
ELEV. = 728. 1
90 BEND 3.5' C VER
GL 1 STA 0 +00.00
L TA 105 10.21 LIT iE
GL- a]/.% I I +al. 10 IPE EN RY
L S A 104+ 9.45 L -1 STA 14 +31.86
L � 759.4B
L STA 103+17.7,: RT 224.4'
R/ PNG ESMT TEMPORARY WORKSP CE
475' X 35'
- - -- -
61.0 LF
@ 11.5° 90° BEN - 3.5 COVER
GL -1 STA, 14 +12 61
L STA 103+26.3 RT 20J.2'
PC ST 13+70.90
o
ELEV. f= 741.
`--- 2 5.1 LF
R = 1,07
@ 17.5°
BORE FOLE B -2
SOIL STRATA
nTFrH
PT STA 1 +65.7
ELEV. = 721.80
GENERAL
NOTES
1. P
OFILE SHOWN
IS
ALONG PROPOSED
LINE
OF
RILL. PROFILES
IROM
9
2.
DEGREE
BENDS TO
OF EXI
EXISTING
TING GA
PIPE
MAIN A
NOT SHOWN.
TIE 1N
POINTS
OT VERI
1E9.
3. C
-EVAT-10P
EARING
OF WETLAND
AREAE
EXCEPT
FOR BELL
HOLE LOCATIONS
SHALL
BE
LIMITE
TO WHAT
CAN BE
CLEAREE
BY HAN
. CONTR
CTOR SHALL
I
STALL TIMBER
M ATS
WITHIN
WETLA
D AREAS
INSIDE
EMPORAR
4.
L 10-IN
,H STEEL
PIPE FOR
HOD I
STALLAT
ON SHALL
BE
1).75"
x
.365" X52
ERW API
5L STEEL
PIP
.
5.
L 10-IN
,H STEEL
PIPE SFALL
BE REINSTALLED
WITH
A MINIMUM
6.
L PIPE
ELEVATIONS
ARE 10
CENTEF
OF PIPE.
7. G
S LINE
rO BE IN3TALLED
WITHIN FROPOSED
70 FT. VIDE
EASEMENT
T
AT SHAL
BE ACCJIRED
BN
PNG.
9. SEE
SHEET
UO -5 (
CESS PLAN)
FOR
ENTRANCE
TO SIT I.
1 10 +00 11 +00 12 +00 13 +00 14 +00 1
WETLAND PERMIT IMPACT SUMMARY
WETLAND IMPACTS SURFACE WATER IMPACTS
Site
No.
Station
(From /To)
Structure
Size / Type
Permanent
Fill In
Wetlands
(ac)
Temp.
Fill In
Wetlands
(ac)
Excavation
in
Wetlands
(ac)
Mechanized
Clearing
in Wetlands
(ac)
Hand
Clearing
in
Wetlands
(ac)
Permanent
SW
impacts
(ac)
Temp.
SW
impacts
(ac)
Existing
Channel
Impacts
Permanent
(ft)
Existing
Channel
Impacts
Temp.
(ft)
Natural
Stream
Design
(ft)
W1
-L- 105 +19.85 TO 103.17.73
HDD Pullback, WS
-
0.14
-
-
-
-
-
-
-
ITOTALS:I
0
0.14
0
0.00
0.00
0
0
0
0
0
Notes: HDD = Horizontal Directional Drill
Pullback = Area where pipe will be staged for drill
WS = Workspace
Utility Permit Drawing
Sheet_? of ?