HomeMy WebLinkAboutNCC202628_NOT Closeout Documents_202206134HOLLY
SPRINGS
iDipm we The owrcc.
February 1, 2022
PROJECT Savannah Place Lot EC 1-38
Town of Holly Springs
Utilities and Infrastructure Department
Certificate of Completion For
Erosion and Sedimentation Control
ENVIRONMENTAL DEVELOPMENT PERMIT NO. 05-2020
FINANCIALLY RESPONSIBLE PARTY David Weekley Homes
PHASE n/a
This is to certify that on the above referenced project the grading has been
completed, all utilities and streets have been installed, and permanent stabilization
has been successfully achieved in or along all roads and utilities in accordance with
the approved erosion control plan. With this certificate, the Town of Holly Springs
Engineering Department certifies that the above referenced project is in final
compliance with the Town's Soil Erosion and Sedimentation Control Ordinance
and therefore closes the active erosion control file for the above referenced project.
Jeff Peters, Engineering Technician
Note: This document does not preclude the Town from taking action on future land disturbance or other erosion or
sedimentation issues at this site.