Loading...
HomeMy WebLinkAboutWQ0008489_Staff Report_20220329;s State of North Carolina Division of Water Resources Water Quality Regional Operations Section Environmental Staff Report Quality To: ❑ NPDES Unit ® Non -Discharge Unit Attn: Nathaniel Thornburg From: Will Hart Washington Regional Office Application No.: WQ0008489 Facility name: Hyde Correctional Institution WWTF Note: This form has been adapted from the non -discharge facili . staff report to document the review of both non - discharge and NPDES permit applications and/or renewals. Please complete all sections as they are gpplicable. I. GENERAL AND SITE VISIT INFORMATION 1. Was a site visit conducted? ❑ Yes or ® No a. Date of site visit: b. Site visit conducted by: c. Inspection report attached? ❑ Yes or ❑ No d. Person contacted: e. Driving directions: _ 2. Discharge Point(s): N/A Latitude: Latitude: and their contact information: (� 3. Receiving stream or affected surface waters: N/A Classification: River Basin and Subbasin No. Longitude: Longitude: - ext. Describe receiving stream features and pertinent downstream uses: II. EXISTING FACILITIES: MODIFICATION AND RENEWAL APPLICATIONS 1. Are there appropriately certified Operators in Charge (ORCs) for the facility? ® Yes ❑ No ❑ N/A ORC: Joseph F Sadler Certificate #: 15650 Backup ORC: Baron Berry Certificate #: 2. Are the design, maintenance and operation of the treatment facilities adequate for the type of waste and disposal system? ❑ Yes or ❑ No If no, please explain: Description of existing facilities: The description in the existing permit is correct. Proposed flow: Current permitted flow: 80,200 gpd Explain anything observed during the site visit that needs to be addressed by the permit, or that may be important for the permit writer to know (i.e., equipment condition, function, maintenance, a change in facility ownership, etc.) FORM: WQROSSR 04-14 Page 1 of 3 3. Are the site conditions (e.g., soils, topography, depth to water table, etc) maintained appropriately and adequately assimilating the waste? ® Yes or ❑ No If no, please explain: 4. Has the site changed in any way that may affect the permit (e.g., drainage added, new wells inside the compliance boundary, new development, etc.)? ❑ Yes or ® No If yes, please explain: 5. Is the residuals management plan adequate? ® Yes or ❑ No If no, please explain: 6. Are the existing application rates (e.g., hydraulic, nutrient) still acceptable? ® Yes or ❑ No If no, please explain: 7. Is the existing groundwater monitoring program adequate? ® Yes ❑ No ❑ N/A If no, explain and recommend any changes to the groundwater monitoring program: 8. Are there any setback conflicts for existing treatment, storage and disposal sites? ❑ Yes or ® No If yes, attach a map showing conflict areas. 9. Is the description of the facilities as written in the existing permit correct? ® Yes or ❑ No If no, please explain: 10. Were monitoring wells properly constructed and located? ® Yes ❑ No ❑ N/A If no, please explain: 11. Are the monitoring well coordinates correct in BIMS? ® Yes ❑ No ❑ N/A If no, please complete the following (expand table if necessary): Monitoring Well Latitude Longitude C I II C I II C I II C I II C I II C I II C I II C I II C I II C I II 12. Has a review of all self -monitoring data been conducted (e.g., DMR, NDMR, NDAR, GW)? ® Yes or ❑ No Please summarize any findings resulting from this review: Miscommunication between facility and laboratory resulted in reporting issues in early 2021. NDAR violations due to data entry errors. Provide input to help the permit writer evaluate any requests for reduced monitoring, if applicable. 13. Are there any permit changes needed in order to address ongoing BIMS violations? ❑ Yes or ® No If yes, please explain: 14. Check all that apply: ® No compliance issues ❑ Current enforcement action(s) ❑ Currently under JOC ❑ Notice(s) of violation ❑ Currently under SOC ❑ Currently under moratorium Please explain and attach any documents that may help clarify answer/comments (i.e., NOV, NOD, etc.) If the facility has had compliance problems during the permit cycle, please explain the status. Has the RO been working with the Permittee? Is a solution underway or in place? Have all compliance dates/conditions in the existing permit been satisfied? ❑ Yes ❑ No ® N/A If no, please explain: 15. Are there any issues related to compliance/enforcement that should be resolved before issuing this permit? ❑ Yes® No ❑ N/A If yes, please explain: 16. Possible toxic impacts to surface waters: N/A 17. Pretreatment Program (POTWs only): N/A FORM: WQROSSR 04-14 Page 2 of 3 III. REGIONAL OFFICE RECOMMENDATIONS 1. Do you foresee any problems with issuance/renewal of this permit? ❑ Yes or ® No If yes, please explain: 2. Recommendation: ❑ Hold, pending receipt and review of additional information by regional office ® Hold, pending review of draft permit by regional office ❑ Issue upon receipt of needed additional information ❑ Issue ❑ Deny (Please state reasons: ) 3. Signature of report preparer: Signature of regional supervisor: Date: 3/22/2022 Plow T" IV. ADDITIONAL REGIONAL STAFF REVIEW ITEMS The regional office recommends changing the effluent monitoring frequency pH and Total Residual Chlorine from 11per event" to "weekly FORM: WQROSSR 04-14 Page 3 of 3