HomeMy WebLinkAboutNCC212690_NOT Supporting Documents_20220609North Carolina Department of Environmental Quality
Land Resources: 450 W. Hanes Mill Road, Suite 300, Winston-Salem, NC 27105 (336)
776-9800
County: Davidson Project: Cunningham Brick Site - Drainage River basin: Yadkin-PeeDee
Person financially responsible: Davidson County 5oii & Water —Andy Miller, Project #: DAVID-2021-035
Director
Address: PO Box 1067, Lexington, NC 27293
1. Project Location: Cunningham Brickyard Rd., Lexington
Pictures: No
2. Weather and soil conditions: Sunny, no activity Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply)
Degree of damage:
8. Contact made with (name):
Inspection report: Sent Report
9. Corrective action needed:
Title:
Date given/sent: Junc 0l, 2022
10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional
self -monitoring or self -inspections are required. Project is in compliance and released under
the SPCA. Termination of coverage under the NPDES General Stormwater Permit for
Construction Activities (NCGOI) must be requested by the permittee via a Notice of
Termination (NOT). The NOT is available at:
https://edocs.deq.ne.gov/Forms/NCGO1-Termination. Please note that this correspondence
must be uploaded as part of completing the NOT process. If you have any questions, please
contact me at Lily.Kay@ncdenr.gov or by phone at (704) 235-2137.
Reported by: Lily Kay Others present:
Date of inspection: May 25, 2022 Time arriving on site: 5:45 PM Time leaving site: 6:00 PM
CC: