HomeMy WebLinkAbout20190049 Ver 1_Carpenter Bottom_As-Built Review_20220615From: Davis. Erin B
To: Baker. Caroline D
Subject: FW: [External] Notice of NCDMS As -Built Review / Carpenter Bottom/ SAW-2018-02062 / Gaston Co.
Date: Wednesday, June 15, 2022 3:05:47 PM
Attachments: imaoe001.ono
Laserfiche Upload: Email
DWR#: 20190049 v.1
Doc Type: Mitigation Information
From: Haywood, Casey M CIV USARMY CESAW (USA)<Casey.M.Haywood@usace.army.mil>
Sent: Tuesday, June 14, 2022 3:34 PM
To: Tugwell, Todd J CIV USARMY CESAW (US) <Todd.J.Tugwell@usace.army.mil>; Kim Browning
<Kimberly.D.Browning@usace.army.mil>; Davis, Erin B <erin.davis@ncdenr.gov>; Bowers, Todd
<bowers.todd@epa.gov>; hollandyouungman@fws.gov; Merritt, Katie <katie.merritt@ncdenr.gov>;
Wilson, Travis W. <travis.wilson@ncwildlife.org>; Munzer, Olivia <olivia.munzer@ncwildlife.org>
Cc: Wiesner, Paul <paul.wiesner@ncdenr.gov>; Reid, Matthew <matthew.reid@ncdenr.gov>; Eric
Neuhaus <eneuhaus@wildlandseng.com>; Shawn Wilkerson <swilkerson@wild landseng.com>;
Stanfill, Jim <jim.stanfill@ncdenr.gov>; Harmon, Beth <beth.harmon@ncdenr.gov>; Crumbley, Tyler
A CIV USARMY CESAW (USA) <Tyler.A.Crumbley2@usace.army.mil>; Allen, Melonie
<melonie.allen@ncdenr.gov>
Subject: [External] Notice of NCDMS As -Built Review / Carpenter Bottom/ SAW-2018-02062 / Gaston
Co.
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an
attachment to Report Spam.
Good afternoon IRT,
The below referenced FINAL Record Drawing (As -Built) Report review has been requested by
NCDMS. Per Section 332.8(o)(9) of the 2008 Mitigation Rule, this review follows the streamlined
review process, which requires an IRT review period of 15 calendar days from this email notification.
Please provide any comments by 5 PM on the 15-day comment deadline shown below. When
providing comments please indicate if your concerns are great enough that you recommend not
issuing the credit release. Comments provided after the 15-day comment deadline (shown below)
may not be considered.
At the conclusion of this comment period, a copy of all comments will be provided to NCDMS and
the NCIRT along with District Engineer's intent to approve or disapprove this Final Record Drawing
and initial credit release.
15-Day Comment Start Date: June 14, 2022
15-Day Comment Deadline: June 29, 2022
45-Day Credit Release Approval Deadline: July 29, 2022
2022 is Monitoring Year 1 for this project.
Project information and location of the FINAL As -Built Baseline Monitoring Report (MYO):
Carpenter Bottom
DIMS Project # 100090
RFP# 16-007133-CT03 (Small Needs) — Issued 4/24/2017
Institution Date: 10/9/2018 —Full Delivery
SAW-2018-02062
DWR# 2019-0049v1
Catawba River Basin
Cataloging Unit 03050102 (03050103 Expanded Service Area)
Gaston County, North Carolina
Mitigation Plan Project Credits:
3,067.849 SMUs (warm)
8.345 WMUs (riparian)
As-Built-MYO Project Credits:
3,067.849 SMUs (warm)
8.345 WMUs (riparian)
Mitigation Plan Lengths/Acreages:
3,501 ft
9.661 ac
As-Built-MYO Lengths/Acreages:
3,494 ft
9.661 ac
Please Note: There were no significant deviations from design to construction except for installing
additional brush toe in several meanders along Carpenter Branch. Construction was completed in
July 2021 and planting was completed in February 2022. The site was contracted through a DIMS
small needs contract.
FD Provider: Wildlands Engineering, Inc. —Contact: Eric Neuhaus, eneuhausC@wildlandseng.com,
(865)207-8835
NCDEQ- DIMS PM: Matthew Reid, matthew.reidCcDncdenr.gov, (828)-231-7912
FINAL As -Built Baseline Monitoring Report and Record Drawings can be accessed directly on the
DIMS SharePoint site here:
IRT-DMS SharePoint Page:
https://ncconnect.sharepoint.com/sites/I RT-DMS/SitePages/Home.asp
Ca rpenterBotto m_100090_MYO_2022. pdf
°F CarpenterBottom_100090_MYO_2022.pdf
CarpenterBottom_100090_AB_2022.pdf
0 CarpenterBottom_100090_ AB_2022.pdf
RIBITS:
https://ribits.ops.usace.army.mil/ords/f?p=107:278:5192800858823:::RP,278:P278_BANK_I D:5396
Thanks,
Casey
Casey Haywood
Mitigation Specialist, Regulatory Division I U.S. Army Corps of Engineers
(919) 750-7397 work cell
BUILDING STRONG °