HomeMy WebLinkAboutSW8050547_Historical File_20191003ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
S. DANIEL SMITH
Director
October 3, 2019
New Hanover County Airport Authority
Attn: Julie Wilsey, Airport Director
1740 Airport Boulevard, Suite 12
Wilmington, NC 28405
NORTH CAROLINA
Environmental Quality
Subject: Permit Renewal
State Stormwater Management Permit No. SW8 050547
Wilmington International Airport Extended Dry Detention Basin No. 1
New Hanover County
Dear Ms. Wilsey:
The Wilmington Regional Office received a complete 8 year Stormwater Management Permit Renewal
Application for Wilmington International Airport Extended Dry Detention Basin No. 1 on September 25,
2019. The Division is hereby notifying you that permit SW8 050547 has been renewed on October 3, 2019,
and shall be effective until June 15, 2027. For your records, please find enclosed a renewed, updated, and re-
issued permit and a copy of the renewal application. Please keep this permit on file at all times. Please note
that the renewed, updated, and re -issued permit does not impose new or different terms; it merely restates some
of the previous terms to provide you with a better understanding of your obligations under the permit.
The renewal and reissuance of this stormwater permit does not imply that the site is currently in compliance
with the terms and conditions of this state stormwater permit. The plans originally approved on June 15, 2005
and subsequently modified on October 28, 2009, October 26, 2011, November 29, 2012, February 8, 2013,
August 4, 2015, September 9, 2015, June 29, 2016, August 22, 2017, April 18, 2018, and October 5, 2018, will
remain in full force and effect in accordance with the regulations set forth in Title 15A NCAC 2H.1000
effective September 1, 1995.
This permit is subject to the conditions and limitations as specified therein. Please pay special attention to the
conditions listed in this permit regarding the Operation and Maintenance of the BMP(s), recordation of deed
restrictions, procedures for changes of ownership, transferring the permit, and renewing the permit. Failure to
establish an adequate system for operation and maintenance of the stormwater management system, to record
deed restrictions, to transfer the permit, or to renew the permit, will result in future compliance problems.
If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to
request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH).
The written petition must conform to Chapter 150B of the North Carolina General Statutes, and must be filed
with the OAH within thirty (30) days of receipt of this permit. You should contact the OAH with all questions
regarding the filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service
Center, Raleigh, NC 27699-6714, or via telephone at 919-431-3000, or visit their website at
www.NCOAH.com. Unless such demands are made this permit shall be final and binding.
If you have any questions, need additional copies of the permit or approved plans, please contact Garrett Zorda
at (910) 796-7215 or via email at garrett.zorda@ncdenr.gov.
i
e ly,anny Smi ,Interim Director
Division of Energy, Mineral and Land Resources
GDS/gdz: \\\Stormwater\Permits & Projects\2005\050547 HD\2019 10 permit 050547
Enclosure: Attachment 1 - History/BUA Table
cc: Wilmington Regional Office Stormwater File
North Carolina Department of Environmental Quality I DtvWon of Energy, Mineral and Land Resources
Wilmington Regional Office 1 127 Cardinal Drive Extension I Wilmington, North Carolina 28405
WORM cAROUNA
a".&'dd&M—WM ft � 910.796.7215
State Stormwater Management Systems
Permit No. SW8 050547
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENTAL RESOURCES
DIVISION OF ENERGY, MINERAL AND LAND RESOURCES
STATE STORMWATER MANAGEMENT PERMIT
HIGH DENSITY DEVELOPMENT
In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North
Carolina as amended, and other applicable Laws, Rules, and Regulations
PERMISSION IS HEREBY GRANTED TO
New Hanover County Airport Authority
Wilmington Intemational Airport Extended Dry Detention Basin No. 1
1740 Airport Boulevard, Wilmington, New Hanover County
FOR THE
construction, operation and maintenance of an extended dry detention basin in compliance
with the provisions of 15A NCAC 2H .1000 (hereafter collectively referred to as the
"stormwater rules') and the approved stormwater management plans and specifications and
other supporting data as attached and on file with and approved by the Division of Energy,
Mineral and Land Resources (the "Division" or "DEMLR") and considered an enforceable part
of this permit.
This permit shall be effective from the date of issuance until June 15, 2027, and shall be
subject to the following specified conditions and limitations:
I. DESIGN STANDARDS
1. This permit is effective only with respect to the nature and volume of stormwater
described in the application and other supporting data.
2. This stormwater system has been approved for the management of stormwater runoff
as described in Section 1.7 of this permit. The "Phase I and II" stormwater control is an
extended dry detention basin that has been designed to handle the runoff from
8,520,835 square feet of impervious area within a drainage area of 287.63 acres
(12,529,107 square feet). The "Overall" condition of the dry detention basin has been
designed to handle the runoff from 9,751,185 square feet of impervious area within a
drainage area of 322.34 acres (14,041,075 sf).
3. The tract will be limited to the amount of built -upon area indicated in Section 1.7 of this
permit, and per the application, the approved plans, calculations and other supporting
documentation:
4. Where an individual project within the drainage area is being leased or sold, the
stormwater collection system for that project must be located in either dedicated
common areas or easements and the final plats will be recorded showing all such
required easements.
5. The runoff from all built -upon area within the permitted drainage area of this project
must be directed into the permitted stormwater control system.
Page 1 of 4
State Stormwater Management Systems
Permit No. SW8 050547
6. All development projects within the permitted contributing drainage area of the
extended dry detention basin BMP must submit plans to the Division for review and
approval prior to construction. Depending on ownership, a permit modification may or
may not be required.
7. That portion of the existing airport previously included in the drainage area of the
permitted dry detention basin that is being removed, must be submitted in a future
permit application as a modification or under Session Law 2012-200.
8. The following design criteria have been provided and must be maintained in the
"Phase I and II" extended dry detention basin and in the "Overall' extended dry
detention basin.
Phase I & II Overall
a. Drainage Area, acres: 287.63 322.38
Onsite, ft2: 12,529,107 14,041,075
Offsite, ft2: 0 0
b. Total Impervious Surfaces, ft2: 8,520,835 9,751,185
C. Design Storm, inches: 4,552,087 @1n 4,552,087 @1"
3,968,748 @1.5" 5,199,098 @1.5"
d. Basin Bottom Elevation, feet: 7.0 7.0
e. TSS removal efficiency: 50% 50%
f. Storage Elevation, FMSL: 13.0 13.3
g. Storage Surface Area, ft2: 506,082 602,325
h. Permitted Detention Volume, ft3: 1,058,112 1,274,829
i. Seasonal High Water Table, FMSL. 6.0 6.0
j. Controlling Orifice: 12.0" 0 12.0" fd
k. Drawdown Time for 12.0" fd orifice, hours: 57 64
I. Receiving Stream/River Basin: Smith Creek / Cape Fear
M. Stream Index Number: 18-74-63
n. Classification of Water Body: "C; Sw"
9. Tributary projects outside of the drainage area of the 2 "for -credit" grassed swales, but
inside the drainage area of the dry detention basin, must provide an additional BMP
with a sufficient TSS removal efficiency such that the total TSS removal, including the
extended dry detention basin, is at least 85%.
10. FAA requirements prohibit standing water (i.e., permanent pools) and stipulate that the
design storm must be fully drained within 48 hours. The approved BMP design
includes a low flow device but does not include a permanent pool at the low flow outlet
or sediment storage below the low flow outlet.
11. The "Phase I and II" condition will be the "permitted condition" until such time as a
project within the drainage area is proposed which shall cause the permitted maximum
amounts of drainage area and/or BUA for the Phase I & II condition to be exceeded.
Prior to construction of that project, the "Overall" condition must be constructed and
will become the permitted condition.
II. SCHEDULE OF COMPLIANCE
The stormwater management system shall be constructed in its entirety, vegetated
and operational for its intended use prior to the construction of any built -upon surface.
The Phase I & II condition
2. During construction, erosion shall be kept to a minimum and any eroded areas of the
system will be repaired immediately.
3. The facilities shall be constructed, operated and maintained in accordance with the
provisions of this permit, the approved plans and specifications, and the supporting
documents attached to this permit and on file with the Division.
Page 2 of 4
State Stormwater Management Systems
Permit No. SW8 050547
4. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and
prior to operation of this permitted facility, a certification must be received from an
appropriate designer for the system installed certifying that the permitted facility has
been installed in accordance with this permit, the approved plans and specifications,
and other supporting documentation. Any deviations from the approved plans and
specifications must be noted on the Certification. A modification may be required for
those deviations.
5. The permittee shall at all times provide the operation and maintenance necessary to
assure the permitted stormwater system functions at the design condition. The
approved Operation and Maintenance Plan must be followed in its entirety and
maintenance must occur at the scheduled intervals including, but not limited to:
a. Semiannual scheduled inspections (every 6 months).
b. Sediment removal.
C. Mowing and revegetation of slopes and the vegetated filter.
d. Immediate repair of eroded areas.
e. Maintenance of all slopes in accordance with approved plans and
specifications.
f. Debris removal and unclogging of outlet structure, orifice device, flow spreader,
catch basins and piping.
g. Access to the outlet structure must be available at all times.
6. Records of maintenance activities must be kept and made available upon request to
authorized personnel of DEMLR. The records will indicate the date, activity, name of
person performing the work and what actions were taken.
7. If the stormwater system was used as an Erosion Control device, it must be restored
to design condition prior to operation as a stormwater treatment device, and prior to
occupancy of the facility.
8. Access to the permitted stormwater facilities shall be maintained via appropriate
easements (as required) at all times.
9. The permittee shall submit to the Director and shall have received approval for revised
plans, specifications, and calculations prior to construction, for any modification to the
approved plans, including, but not limited to, those listed below:
a. Any revision to any item shown on the approved plans, including the stormwater
management measures, built -upon area, details, etc.
b. Redesign or addition to the approved amount of built -upon area or to the
drainage area.
C. Further subdivision, acquisition, lease or sale of all or part of the project area.
d. Construction of any future built -upon area within the drainage area.
e. Filling in, altering, or piping of any vegetative conveyance shown on the
approved plan.
10. The Director may notify the permittee when the permitted site does not meet one or
more of the minimum requirements of the permit. Within the time frame specified in the
notice, the permittee shall submit a written time schedule to the Director for modifying
the site to meet minimum requirements. The permittee shall provide copies of revised
plans and certification in writing to the Director that the changes have been made.
III. GENERAL CONDITIONS
The issuance of this permit does not preclude the Permittee from complying with any
and all statutes, rules, regulations, or ordinances, which may be imposed by other
government agencies (local, state, and federal) having jurisdiction.
2. This permit is not transferable to any person or entity except after notice to and
approval by the Director. The permittee shall submit a completed and signed "Permit
Page 3 of 4
State Stormwater Management Systems
Permit No. SW8 050547
Transfer Application Form" (available on the Division website) accompanied by the
required fee and supporting documentation as listed on the form, to the Division at
least 60 days prior to any one or more of the following events:
a. The sale or conveyance of the project area in whole or in part, except in the
case of an individual lot sale that is made subject to the recorded deed
restrictions and protective covenants;
b. Dissolution of the partnership, corporate, or LLC entity, subject to NCGS 55-14-
05 or NCGS 57D-6-07 and 08,
c. Bankruptcy,
d. Foreclosure, subject to the requirements of Session Law 2013-121,
3. Any individual or entity found to be in noncompliance with the provisions of this
stormwater management permit or the requirements of the Stormwater rules is subject
to enforcement procedures as set forth in NCGS 143 Article 21.
4. In the event that the facilities fail to perform satisfactorily the Permittee shall take
immediate corrective action, including those as may be required by this Division, such
as the construction of additional or replacement stormwater management systems.
5. The permittee grants DEQ Staff permission to enter the property during normal
business hours for the purpose of inspecting all components of the permitted
stormwater management facility.
6. The permit issued shall continue in force and effect until the permittee files a request
with the Division for a permit modification, transfer, renewal, or rescission; however,
these actions do not stay any permit conditions.
7. Unless specified elsewhere, permanent seeding requirements for the stormwater
control must follow the guidelines established in the North Carolina Erosion and
Sediment Control Planning and Design Manual.
8. Approved plans and specifications for this project are incorporated by reference and
are enforceable parts of the permit. A copy of the approved plans and specifications
shall be maintained on file by the Permittee at all times.
9. The permittee is responsible for compliance with all permit conditions until such time
as the Division approves the transfer request. Neither the sale of the project, in whole
or in part, nor the conveyance of common area to a third party constitutes an approved
transfer of the stormwater permit.
10. The permittee shall submit a completed "Permit Information Update Application Form"
(available on the Division website) to the Division within 30 days to making any one or
more of the following changes:
a. A name change of the current permittee;
b. A name change of the project,
c. A mailing address change of the permittee;
11. A permit renewal request must be submitted at least 180 days prior to the expiration
date of this permit. The renewal request must include the appropriate application,
documentation and the processing fee as outlined in Title 15A NCAC 02H.1045(3).
Permit updated, renewed and reissued this the 3rd day of October 2019.
NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION
�tyanny wmitn, uirector
Division of Energy, Mineral and Land Resources
By Authority of the Environmental Management Commission
Page 4 of 4
State Stormwater Management Systems
Permit No. SW8 050547
Attachment 1
The master permit tables for Phase I and II were added to the permit on September 20,
2010, as part of the review for the modification to SW8 060515.
Phase I II was added on October 26, 2011.
A modification to the tables was added on November 27, 2012.
Phasing refers to the extended dry detention basin, not to the airport BUA.
Master Permit No SW8 050547 Phase I & II Bay
Startina New BUA balance = 8,520 835-4,552,087 = 3,968,748
Mod/Offsite Permit
No.
Date Issued
Offsite Project Name
Proposed
BUA
Remaining
BUA
SW8 050801
8/12/2005
General Aviation Apron Expansion
151,589
3,817,159
SW8 060326
4/7/2006
Air Wilmington FBO Building
196,725
3,620,434
SW8 060515
5/18/2006
Terminal Parking Lot
201,655
3,418,779
SW8 060515 Mod
5/14/2008
Credit Card Parking Lot
225,722
3,193.057
SW8 050547 PR
10/28/2009
ILM Phase I and Phase II (for gravel
roads
15,843
3,177,214
SW8 050547 PR
11/27/2012
Delineate a new overall DA, increase
the max BUA allowed.
0
3,177,214
SW8 050547 PR
2/8/2013
Consolidated Rental Car Facility
CONRAC Phase 1
205,202
2,972,012
SW8 050547 PR
8/4/2015
North General Aviation Apron Rehab &
Expansion
32,453
2,939,559
SW8 050547 PR
9/9/2015
ILM Flex Space (Lot 9 Business Park)
and Business Park access road.
129,082
2,810,477
SW8 150723
9/15/2015
Air Wilmington Hangar 4
24,190
2,786,287
SW8 050547 PR
6/29/2016
GA Hanger Taxiline and Corporate
Hanger Complex
122,992
2,663,295
SW8 050547 PR
8/22/2017
Avis Car Rental Facility
CONRAC Phase 2
75,596
2,587,699
SW8 050547 PR
4/18/2018
Social Bark Kennel
29,337
2,558,362
SW8 050547 PR
10/5/2018
FBO #2 Area
110,358 1
2,448,004
Page 1 of 1
DEMLR USE ONLY
Date R eiv d
Fee Pal
Permit tuber
F.`9.. 5
�
SUJS'050
NC DEQ Division of Energy, Mineral and Land Resources
STATE STORMWATER:
PERMIT RENEWAL APPLICATION FORM
In accordance with 15A NCAC 2H.1045(31. the current permit holder shall renew their high density permit 180 days
prior to its expiration. Renewed permits are valid for a period of 8 years per Session Law 2011-398 (SB 781)
Section 60.(c). This application form is for permit renewals only.
A. PROJECT INFORMATION
1. State Stormwater Permit Number: SW8 050547
2. Project name: Wilmington hiternational Airport Extended Dry Detention Basin No 1
3. Project street address: 1740 Airport Boulevard. Suite 12
City: Wilmington County: New Hanover
ZIP: 28405
4. What, if any, changes have been made to the project as permitted? None. Basin and pretreatment
swales remain as approved.
if the project has changed from the original approved plans, please complete SWU-101 for a Major
Modification or Minor Modification Application form available at: hftps:Hdeg.nc.gov/about/divisions/energy-
mineral-land-resources/energy-m ineral-land-rules/stormwater-program/post-construction.
B. PERMITTEE INFORMATION
if changes to the permittee or project name have been made, please complete either the Permit Update form
or the Permit Transfer form available at https://deg.nc.gov/about/divisions/energy-mineral-land-
resources/energy-mineral-land-rules/stormwater-program/post-construction. State Stormwater Permits do not
automatically transfer with the sale of the property.
1. Current Permit Holder's Company Name/Organization: New Hanover County Airport Authority
2. Signing Official's Name: Julie Wilsey
3. Signing Official's Title: Airport Diretor
4. Mailing Address: 1740 Airport Boulevard, Suite 12
City: Wilmington State: NC ZIP:
28405
5. Street Address: same
City:
6. Phone: (910) 341-4333 Email: iwilseyCo_flyilm.com
State:
ZIP:
SEP 2 S 2019
BY: -- _ _ .
ior!'ii';i'i3t:'r Fk:r:fi?:- I-:!nc:c1!J3i ¢-'cr!r, pcZ'C7C i ^}.'.^ Ili<-ij 11. 2.01v
SUBMITTAL REQUIREMENTS
Submit the application package to the appropriate DEMLR Re ional Office (Coastal, SA Waters) or DEMLR
Central Office (Urbanizing Areas Ph 2, USMP, Non -Coastal HQW/ORW). Only applications packages that
include all required items listed below will be accepted and reviewed.
Initial each item below to indicate that the required information is provided in the application package.
1. A permit application processing fee of $505.00 payable to NCDEQ.
�) 2. One original signed hard copy and one electronic copy of this completed form. The signing official
named on this application to represent the current permittee must meet one of the following:
a. Corporation — a principle executive officer of at least the level of vice-president;
b. Limited Liability Company (LLC) — a manager or company official as those terms are defined
in G.S. 57D "North Carolina Limited Liability Company Act;"
c. Public Entity — a principal executive officer, ranking official, or other duly authorized employee;
d. Partnership or limited partnership — the general partner;
e. Sole proprietor; or
f. Letter of authorization signed by one of the signatories noted in a — e above authorizing the
signature of another entity.
3. One hard copy and one electronic copy of recorded documents required by the original permit that
have not yet been received by DEMLR, including: deed restrictions, protective covenants,
condominium/planned community declaration and easements. If the project has been built, include
documentation that the maximum BUA per lot or maximum total BUA has not been exceeded. If
the project has not been built, include a signed agreement that the final recorded deed restrictions
and protective covenants will be submitted at a later date.
4. O&M Agreements, Please select one:
® 1 have a copy of the current recorded O&M Agreement for all SCMs, and I will continue to
keep this on file with the permit; or
❑ I do not have a copy of the current recorded O&M Agreement for all SCMs and am
requesting a copy be sent to me. I agree to keep this on file with the permit.
5. Designer Certifications, Please select one:
® A copy of the certification(s) confirming that the project was built in accordance with the
approved plans have been previously provided to the Division; or
❑ A copy of the certification(s) confirming that the project was built in accordance with the
approved plans are enclosed; or
❑ The project has not yet been built.
6. [IF APPLICABLE] If the project has been built, one original hard copy and one electronic copy of a
k/�)F signed, sealed, and dated letter from a licensed professional stating that the SCMs have been
inspected, and that they have been built and maintained in accordance with the permit.
7. [IF APPLICABLE] When the permittee is a corporation or a limited liability corporation (LLC):
N/A Provide one hard copy and one electronic copy of documentation from the NC Secretary of State,
or other official documentation, which supports the titles and positions held by the persons listed in
Section C.2 per 15A NCAC 2H. 1043(3)(b).
https://www.sosnc.gov/online services/search/by title/ Business Registration
V�j�
nECEl
1 SEP 2 5 2019
BY:
pr-ge 1 vi'3 Jad 11, 3 M �' 20 1
D. PERMITTEE.''S// CERTIFICATION
I, GGtI e W �l the person legally responsible for the permit, certify that I have
a copy of the Permit and O&M AgreWfient on site (or I will obtain a copy and it will be kept on site), that I am
responsible for the performance of the maintenance procedures, and the site has been and will be maintained
according to the O&M Agreement and approved plans. I agree to notify DEMLR of any problems with the SCMs
or built -upon area and to submit the proper forms to modify or transfer the permit prior to any changes to the
project, SCMs, r ownership. All information provided on this permit renewal application is, to the best of my
knowledge, c rr ct d co pl te.
Signature: Date: d G 7
Azevv f Pt
NOTARIZATION:
I, ofe fV1' L&y►S , a Notary Public for the State of
NOV-7% l_..ixro hr►A. , County of N% HX nDLM.r , do hereby certify
that JLoce 1.-Vis �4 personally appeared before me
this the 1 day of n,• , 20 ��, and acknowledge the due
forgoing instrument. Witness my hand and official seal,
kPUB1IC 2 e
ary Signs
R,cov
ion expires
ECEIV ..,.
SEP 2 5 2019
F- :,rn t {ien'%; °s}F;al F=:.ppV:f'atio i ForiT Pc y Ui' :; =,•9a �•: �
Surd, Tina J
From: Burd, Tina J
Sent: Monday, September 30, 2019 10:05 AM
To: jwilsey@flyilm.com'
Subject: SW8 050547 - Wilmington International AirpcTt Extended Dry Detention Basin No. 1
The Wilmington Regional Office of the Division of Energy, Mineral and Land Resources (Stormwater Section) accepted
the Stormwater Permit Renewal Application and $505.00 fee for the subject project on September 25, 2019. The project
has been assigned to Garrett Zorda and you will be notified if additional information is needed.
Best Regards,
Tina Burd
Administrative Associate II
Wilmington Regional Office
Division of Environmental Assistance & Customer Service
Phone 910-796-7215
NCDEQ
Wilmington Regional Office
127 Cardinal Drive Ext.
Wilmington, NC 28405
Ciriar? G�ifs:�',CC�r,'�s-,,• -, -,�.: �.:_ , :,�" �;!"C_�!w !S StihjG�Ci i� fhfs
llt i.'i L?1'r:(i,?� r ..'?.1C I __ . �, � • this o: e'd to 0i1lsd Par? e'.
Application Completeness Review Checklist
Project Name: � L /Yi mbate Clelivered to WIRO: -2,b
lzy '+h-,La�Le 110 BIMS Received/Accepted Date:
Proiect Counv Location:
s il/ _ _ BIMS Acknowledged Date:
Paperwork Ernailed Engineer on:
MSupplement(s) 11 original per $MP) —
OO&M with correct/original signatures (1 onginal per BMP except LS/VFS and swaies)
Application with correct/original signatures
Corp or LLC: Sig. Auth, per So5 or Signature Authorization letter or report
a505 (within 5mo) Check#(s):6S j 3,Y E]No Fee
Soils Report: w/SHWT or General Report
Calculations {signed/sealed)
Deed Restrictions, if subdivided:
El**Signed & Notarized Template
Correct Template Comm Res & HDAD) or Dec. Covenants & Rest.
FlReWrded Covenants
ElRecorded Plats 050% or more Lots Sold List
Project Narrative
OUSGS Map
Email Address: Design Engineer
DEmaii Address: Property Owner
Deed
Email Address: Lessee
Lease Agreement
Email Address: Purchaser
Purchase Agreement
Email Address: Developer
Email Address: HOA Representative
Plans
F-12 Sets Wetlands: Delineated or No Wetlands
Vicinity Map Project Boundaries
Legend 0I.a;iout (proposed BUA dimensions)
MDA Maps Details (roads, cul-de-sacs, curbs, sidewalks, 8MPs, Buildings, etc)
Existing Conditions Landscape Flan
ElGr.d'sng Ir?E Seal
REVIEWER NAME: NOTES TO REVIEWER: *Enter BIMS Acknowledged Date on this Sheet
"FOR NEW Projects -Enter New Permit # on
Supplements & Deed Restiction Templates,
G:wQ\\\Reference Library\Procedures\ChecklistsiCompiezeness Review Lheck4s 2018 03 13
rLL VA
September 23, 2019
Airport Authority Georgette Scott
Environmental Program Supervisor II (Stormwater)
Donna Girardot NCDEQ
Chairman
127 Cardinal Drive Ext,
Thomas Wolfe Wilmington, NC 28405
Vice -Chairman
Harry W. Stovall Ref: State Stormwater Permit Renewal
Secretary Wilmington International Airport Mater Plan and EDDB
Permits SW8 040836 and SW8 050547
Carter T. Lambeth
Julia Olson-Boseman
Dear Ms. Scott,
F. Spruill Thompson
W. Lee Williams
Please find attached a permit renewal application for the projects listed above. The
package includes the following items:
• Permit Renewal Application and check for $505 f SW 040836 /
Airport Director • Permit Renewal Application and check for $505 or SW8 05054
Julie A. Wilsey, AAE • One USB drive containing:
o Electronic copy of applications for both SW8 040836 and SW8 050547
0 0&M Agreement for SW8 050547
Other items, including recorded documents required by the original permit, designers
certifications and documentation of BUA allocated to date for both permits have
previously been submitted to the Regional Office and have not required modification
since the most recent submittal.
If you have any questions regarding these applications or need any additional
information, please do not hesitate to contact me.
Respectfully,
Granseur Dick, PE
Planning & Development Director
Wilmington
International Airport Cc: Eric Stumph, PE, Talbert & Bright (By Email)
1740 Airport Blvd., Ste. 12
VVILmington, NC 28405
910.341.4333
flyiLm.corn