HomeMy WebLinkAboutSW8050547_Historical File_20150804C®ENR North Carolina Department of Environment and Natural Resources Pat McCrory Governor August 4, 2015 Julie Wilsey, Director New Hanover County Airport Authority 1740 Airport Boulevard Wilmington, NC 28405 Subject: Approved Plan Revision Wilmington International Airport North General Aviation Apron Rehab & Expansion Stormwater Permit No. SW8 050547 New Hanover County Dear Ms. Wilsey: Donald van der Vaart Secretary On June 10, 2015, the Wilmington Regional Office received a plan revision for Stormwater Management Permit Number SW8 050547. The revisions include the following specific changes: The rehabilitation and expansion of the North General Aviation Apron with the addition of a total of 32,453 square feet of built -upon area. Runoff from this built -upon area is permitted to be treated in the previously permitted Extended Dry Detention Basin (EDDB). 2. Pre-treatment for the project will be provided by the grassed swale pre-treatment areas approved under the November 29, 2012 permit modification, therefore, no additional on -site pre- treatment devices are required for this project. 3. The grassed pre-treatment swales were certified on July 24, 2015 as being built within substantial compliance and intent of the approved plan. 4. Phase II of the EDDB was certified on July 10, 2015 as being built within substantial compliance and intent of the approved plan. This includes the 72" RCP that will serve to collect the runoff from this project and convey it to the EDDB for treatment. 5. After this project, a total of 3,141,214 square feet remains available for future development within the Phase I & II EDDB drainage area. It has been determined that a formal permit modification is not required for the proposed changes. We are forwarding you an approved copy of the revised plans for your files. Please add the attached plans to the previously approved plan set. Please be aware that all terms and conditions of the modified permit issued on November 29, 2012, remain in full force and effect. Please also understand that the approval of this revision to the approved plans for the subject State Stormwater Permit is done on a case -by -case basis. Any other changes to this project must be approved through this Office prior to construction. The issuance of this plan revision does not preclude the permittee from complying with all other applicable statutes, rules, regulations or ordinances which may have jurisdiction over the proposed activity, and obtaining a permit or approval prior to construction. Division of Energy, Mineral, and Land Resources Land Quality Section - Wilmington Regional Office 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 (910) 796-7215 / Fax: (910) 350-2004 • Internet: http://Portal.ncdenr.om/web/ir/ State Stormwater Management Systems Permit No. SW8 050547 k W If you have any questions concerning this matter, please do not hesitate to call me at (910) 796- 7215. Sincerely, 4E Linda Lewis Environmental Engineer III )�)GDS\arl: G:1WQ1Shared\Stormwater\Permits & Projects120051050547 HD12015 08 permit -PR 050547 cc: Amy McLane, P.E., Talbert & Bright New Hanover County Building Inspections Wilmington Regional Office Stormwater File Page 2 of 3 State Stormwater Management Systems Permit No. SW8 050547 The master permit tables for Phase I and II were added to the permit on September 20, 2010, as part of the review for the modification to SW8 060515. Phase III was added on October 26, 2011. A modification to the tables was added on November 27, 2012. Phasing refers to the extended dry detention basin, not to the airport BUA. Master Permit No. SW8 050547 Phase I & II Basin Starting New BUA balance = 8,520,835-4,552,087 = 3,968,748 Mod/Offsite Permit No. Date Issued Offsite Project Name Proposed BUA Remaining BUA SW8 050801 8/12/2005 General Aviation Apron Expansion 151,589 3,817,159 SW8 060326 4/7/2006 Air Wilmington FBO Building 196,725 3,620,434 SW8 060515 5/14/2008 Credit Card Parking Lot 225,722 3,394,712 SW8 050547 10/28/2009 ILM Phase I and Phase II for gravel roads 15,843 3,378,869 SW8 050547 11/27/2012 Delineate a new overall DA, increase the max BUA allowed. 0 3,378,869 SW8 050547 2/8/2013 Consolidated Rental Car Facility CONRAC 205,202 3,173,667 SW8 050547 8/4/2015 North General Aviation Apron Rehab & Expansion 32,453 3,141,214 Master Permit No. SW8 050547 Overall Basin Offsite Permit No. Date Issued Offsite Project Name Proposed BUA Remaining BUA. Page 3 of 3 DENIER USE ONLY Date Received Fee Paid (express only) Permit Number State of North Carolina Department of Environment and Natural Resources Division of Energy, Mineral and Land Resources STORMWATER MANAGEMENT PERMIT PLAN REVISION APPLICATION FORM This farm may be photocopied for use as an original I. GENERAL INFORMATION 1. Stormwater Management Permit Number: SW 8 050547 North General Aviation Apron Pavement Rehabilitation, Storm Water Improvements, 2. Project Name: and Apron Expansion (Schedule IV -Pipe System '131 3. Permit Holder's name (specify the name of the corporation, individual, etc.): 4. Print Owner/Signing Official's name and title (person legally responsible for Julie Wilsey, Airport Director ,JUN 10 2015 RV. 5. Mailing Address for person listed in item 2 above: 1740 Airport Boulevard City: Wilmington State: NC Zip: 28405 Phone: ( 910 ) 341-4333 Fax: ( 910 ) 341-4365 Eniafl:—Jwilsey@flyilm.com II. PLAN REVISION INFORMATION 1. Summarize the plan revision proposed (attach additional pages if needed): The proposed project is using 32,453 square feet (0.75 acres) of the permitted future BUA allocated for the Airport's master storm water management system covered under permit SW8-050547 See additional pages III. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Energy, Mineral and Land Resources (DEMLR). A complete package includes all of the items listed below. The complete application package should be submitted to the DEMLR Office that issued the permit. 1. Please indicate that you have provided the following required information by initialing in the space provided next to each item. • Original & 1 copy of the Plan Revision Application Form • Two (2) copies of revised plans (must be revisions of original approved plan sheet(s)) If applyingfor or Express review (only available in 20 coastal counties): • Application fee of $500.00 (made payable to NCDENP) VI. APPLICANT'S CERTIFICATION I, (print or type name of person listed in General Information, item 3) Julie Wilsey certify that I have authorized these plan revisions and that the information included on this plan revision applicatio to the�b/e%st of my knowledge, correct and complete. / Signature. lA/ Date: Plan Revisi6ii Form U Rev. Oct. 31, 2013 11-30-'12 09:43 FROM-DEM Unirston 91e-35B-Z004 T-b31 rUssstamle r-817 State Stormwater Mana®ement Systems Permit No. SM 05M Mod. Wilmington Ini�raxtional Airport bmonnw ar Permit No. 050547Mod ME HMPH Ccwnty Designer's Garbtication I, Timothy Clinkscales , as a duly registered Professional Engineerin the State of Worth Carolina. having been authorized to obse eriodica Idyl full time) the consbudiion of the prof Wilmington International Airport High Density Dry Detention Basin (Modification to add two new grassed pre-treatment swales) for Wilmington Internat ' 1 Airport ( rojed Owner) hereby state that, to the best of my allffim due care and diiigenoe was used in the obsenmtlon of the project constncction such that the construction w= observed to be bulk within substantial Sorrow and irtifient of the approved plans and specifications. The daol M of items on page 2 of this form is included in the Certification. Noted devistione from approved plans and specifflo aon: This certification is limited to the construction of two new "for credit" grassed swales. Certifications (by others) of Phase I & II infrastructure remain in place for those facilities. Signature �� Regfabatlon Number 2 s 8 4 7 Date 710 1 ECEIVE JUL 242015 By: VI 2 O"Si I Page 7 of 9 11-30-'12 19:44 FROM -DM wilminstm 910-350-2004 T-531 P0009/3810 F-817 State St mwAder Management Systems Permit Noy SW8 0505 iMW, Cron Requinwnents: 1. The drainage area to the system contains approximately the permitted acreage. 2. The d ama to the system contains no more than the permitted amount of area. 2% 3. Al the built -upon area associated with the project is graded such that the nmoff drains to the system. 4. ANl oge within the permitted contributing drainage area is directed into me system. A-6. The outlatlbypass stru tore elmalions are per the approved plan. A-6. The outset struck Is located per the approved plans_ M� A trash rack is provided on the outietlbypass structure. All slopes are grassed with permanent vegetation. �nv Vegetated slopes are no steeper then 3:1. 44-10. The Inlets am located per the approved plans and do not cause short- cimuitircg of the system. 11. The permitted amounts of surface area and/or volume have been pmvided. ,12. required drawdowrr device is correctly located and shed per the approved ply. r' 13. All required design depths are provided. A AN required parts of the system are provided, such as pretreatment devices, outlet structure and/or forebay. The sequined system dimensions are provided per the approved plans. 15. The maximum drainage area and/or bulls -upon area have not been exceeded for the `Rhase I-$ IF condition. NCDENFDWQ Reg*nal Offim New Ha noww County Building Inspections page a of 9 State Stormwater Management Systems Permit No. SW8 050547Mod. Wilmington International Airport Phases I and 11 Stormwater Permit No. SW8 050547Mod New Hanover County Designer's Certification I, &j4 �E /r(arr.cm' , as a duly registered Profe5si'otiel &QLiperinthe State of North Carolina, having been authorized to observe (periodicaliyl ee full time) the construction of the project, ILZJ 90 (Project) for New qVl u Co r' Project Owner) hereby state that, to the best of my abilities, due car4 and diligence wak used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: SEAL Signature b w11111i111 �........ Registration Number Q,3 q JrQ 3 °p�`p sss o®��y,� Date % Jq='¢Q�'s9 SEAL •. r � 034503 ? yOINEIV �:�'Gp�``��` �0,011111 H ��;S% -71q/l5 Page 6 of 7 State Stormwater Management Systems + Permit No. SW8 050547Mod. Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The outlet/bypass structure elevations are per the approved plan. 6. The outlet structure is located per the approved plans. 7. Trash rack is provided on the outiet/bypass structure. 94-8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. Required drawdown devices are correctly sized per the approved plans. f _13. All required design depths are provided. 14. All required parts of the system are provided, such as an outlet structure and a forebay. '16'. The`retpired system dimensions are provided per the approved plans. r_c: NCOENR-DWQ-.RegionalOffice New Hano & Chun y Building Inspections a Page 7 of 7 TALBERT & BRIGHT, INC. ENGINEERING & PLANNING CONSULTANTS LETTER OF TRANSMITTAL To: NC Division of !dater Quality 127 Cardinal Drive Ext Wilmington, NC 28405 Date: 7!10115 Prol. No. 3301-1303 Attention: Linda Lewis Re: Wilmington International Airport North GA Apron Pavement Rehab & SW Im ro Stormwater Permit Designer's Certification Permit No. SW8 050547 WE ARE SENDING YOU: ® Attached ❑ Under Separate Cover via ❑ Shop Drawings ❑ Prints ❑ Plans ❑ Copy of Letter ❑ Change Order ❑ Other the following items: ❑ Specifications ITEM DATE NO. DESCRIPTION 4 Designer's Certification for the Phase II project, SW8 050547 permitted in 2009 V THESE ARE TRANSMITTED, as checked below: ❑ For Approval ❑ No Exception taken ® For your Use ❑ Make Corrections Noted ❑ For Review and Comment ❑ Amend and Resubmit ❑ As Requested ❑ Rejected — See Remarks ❑ FOR BIDS DUE ON REMARKS ❑ Resubmit Copies for Approval ❑ Submit Copies for Distribution ❑ Return Corrected Prints ❑ Prints Returned After Loan to Us ❑ Other COPY TO Julie Wilsey SIGNED Ray Marconi ENGINEERING & PLANNING CONSULTANTS 4810 Shelley Drive Wilmington, NC 28405 910.7635350 FAX 910.762.6281 Casmer, Jo From: Casmer, Jo Sent: Tuesday, June 23, 2015 3:56 PM To: 'jwilsey@flyilm.com' Subject: Wilmington International Airport; Stormwater Permits SW8 0505047 and SW8 040836 The Wilmington Regional Office of the Division of Energy, Mineral, and Land Resources (Stormwater Section) received the Stormwater Permit Plan Revision Applications on June 10, 2015. The projects have been assigned to Linda Lewis and you will be notified if additional information is needed. Jo C"Mar Administrative Assistant for DEMLR/Stormviater Section NC Department of Environment & Natural Resources 127 Cardinal Drive Extension Wilmington, NC 28405 Phone: (910) 796-7336 Fax: (910) 350-2004 Email con espondencae to and from this address may be subject to the North Carolina Public Recor& Law and may be dlsdomd to thlyd parties Completeness Review Checklist Project Name: (�e - � � � ��. Received Date: Project Location: Accepted Date: Cs--rr-d. t O 2.6 cL e % Rule(s) 2008 Coastal 1:11995 Coastal LJPhase II (WiRO.) 13 Universal ®1988 Coastal Type of Permit: New or Mod or Existing Permit #i (Mod or Pik): �PE Cert on File? Density: HD or LD I Type: Commercial or Residential F---IIVCG: %: rl(% OK?) Stream Class: MSA Map r,7Offsii to SW8 (Subdivided?: Subdivision or Single Lot 11 PORW Map I "Exempt Paperwork Emalled Engineer on: Supplement(s) (1 original per BMP) BMP Type(s): 0&M with correct/original signatures (1 original per BMP except LS/VFS and swales) pplication with correct/original signatures El Deed Corp or LLC: Sig. Auth. per SoS or letter ®Email Address: Design Engineer 11_J$505 (within 6rno) ®Email Address: Owner 0Soils Report with SHWT LLA HUte 20 RC�F9 ObA,170P: 6J Calculations (signed/sealed) %�Je" 4 AN�6-- LiRlo obvious errors nsity includes common areas, etc Deed Restrictions, if subdivided: Signed & Notarized Correct Template (Comm/Res & HD/LD) or Dec. Covenants & Rest. Mans - ! _ ets I JDetails (roads, cul-de-sacs, curbs, sidewalks, BMPs, Buildings, etc) Grading Wetlands: Delineated or fro Wetlands Vicinity Map FEIILayout (proposed BUA dimensions) Legend LJDA Maps'i,Project Boundaries Infiltration Wet Pond Offsite Soils Report Soils Report r71PE Cert for Master Lot ##: SHWT: I P.SHWT: ®Deed Rest for Master Lot # Matches Master Bottom: PP: BUA Permitted (Master): sf Visited: BUA Proposed (Offsite): sf Additional Information: Perrnitted Proposed: Proposed. Pra ;r.ngr :- BUA (sf) DA (sf) PP (el) SHWT (el) Depth (ft) SA (sf) TALBERT & BRIGHT, INC. ENGINEERING & PLANNING CONSULTANTS To: NC Division of Water Quality 127 Cardinal Drive Ext Wilmington, NC 28405 LETTER OF TRANSMITTAL Date: 6/10/15 Proj. No. 3301-1303 Attention: Linda Lewis Re: Wilmington International Airport North GA Apron Pavement Rehab & SW Im ro Stormwater Permit Application Revisions — Permit No. SW8 040836 & SW8 050547 WE ARE SENDING YOU: ® Attached ❑ Under Separate Cover via ❑ Shop Drawings ❑ Prints ® Plans ❑ Copy of Letter ❑ Change Order ❑ Other _ the following items: ❑ Specifications ITEM DATE j NO. I DESCRIPTION 1 Plan Revision Application Form no fee SW8 040836 (Original + One Co 2 Two Copies of Narrative with Impervious Calcs 2 Two Copies of Plan Sheets Al, A2, EX1-EX6, G1-G3, G10, & G11 1 Plan Revision Application Form no fee SW8 050547 (Original + One Co 2 Two Copies of Narrative with Impervious Calcs 2 Two Copies of Plan Sheets Al, A2, EX1-EX6, G1-G3, G10, & G11 THESE ARE TRANSMITTED, as checked below: ® For Approval ❑ No Exception taken ❑ Resubmit Copies for Approval ® For your Use ❑ Make Corrections Noted ❑ Submit Copies for Distribution ❑ For Review and Comment ❑ Amend and Resubmit ❑ Return Corrected Prints ❑ As Requested ❑ Rejected — See Remarks ❑ Prints Returned After Loan to Us ❑ FOR BIDS DUE ON ❑ Other REMARKS COPY TO Julie Wilsey SIGNED Ray Marconi ENGINEERING & PLANNING CONSULTANTS 4810 Shelley Drive Wilmington, NC 28405 910.763.5350 FAX 910.762.6281 North General Avation Apron Pavement Rehabilitation, Stormwater Improvements, and Apron Expansion project at Wilmington International Airport As previously discussed in the project scoping meeting on February 19, 2015, the airport is beginning the initial work necessary to be able to provide a second Fixed Base Operator (FBO) on the north side of the airfield. This project will allow for rehabilitation of some existing aircraft parking apron pavement and installation of drainage infrastructure to accommodate this future development. Project Narrative: Please see the attached Exhibit 'Project Area Map' for the Items listed below: Item 1: The project will consist of rehabilitation of the existing 1940's era concrete aircraft parking apron. The rehabilitation effort will include construction of an overlay of the existing concrete pavement. This rehabilitation effort will also remove portions of existing pavement that will not be replaced, resulting in a decrease of the existing built upon area. The apron currently drains to inlets located within the pavement area and the collected stormwater is conveyed via drainage pipes to an existing ditch. Please see attached Exhibit 'A' showing the removal of the existing pavement. Item 4: As part of a bid alternative, the airport will be removing the existing hangar building where aircraft currently park. This bid alternative will remove the hangar slab and construct concrete pavement in the location of the existing concrete slab along with placing concrete pavement in the grassed areas east and west of the hangar for aircraft parking. The built upon area constructed in the existing grass area will be more than offset by the removal of existing concrete pavement located adjacent to and immediately west of the apron rehabilitation area. Drainage patterns from this apron area will not change and the apron area will drain to the same drainage ditch as it does today. As there is a decrease in BUA and the area will drain as it does historically to the same ditch, no new BMPs are proposed. Please see attached Exhibit'A' showing the removal of the existing pavement and installation of new pavement. Items 2 & 5: Along the western edge of the apron, a new storm drain system (Item 2 - shown in red) will be installed both to bring the apron into compliance with current National Fire Protection Association (NFPA) standards and to allow for filling of the ditch (Item 5) for redevelopment of the area between the apron and Trask Drive. Stormwater collected in the new drainage pipe (Item 2) will be conveyed to the existing ditch located north of the apron being rehabilitated. Based on our discussions February 19, 2015, Items 1, 2, 4, and 5 will be a Plan Revision covered under existing Stormwater Master Plan Permit No. SW8 040836. Item 3: In preparation for the future redevelopment, new drainage pipe (shown in blue) will be installed along the eastern edge of Trask Drive. The drainage pipe will be connected to the existing drainage system that conveys stormwater to Extended Dry Detention Basin #1 and the associated pre-treatment swales (Airport's existing Regional BMPs under Stormwater Permit No. SW8 050547). Based on the approved permit SW8 050547 modification November 29, 2012, the proposed pipeline and drainage area are within Paramounte's'overall basin map' (map attached with location of Item 3 shown). This system will be primarily utilized to drain the future redevelopment with the potential for minor connections to the proposed drainage inlets. The future development is anticipated to include hangars, hangar taxilanes and FBO terminal building in this area. The pipeline will consist of one manhole and five drainage inlets. The inlets will be collecting a minor amount of runoff as shown on Exhibit'B'. Due to the minor increase of impervious area (0.75 acres) draining to the existing BMP, a Plan Revision covered under existing Stormwater Permit No. SW8 050547 is being submitted for this system. �; rz r &VE JUN 10 2L BY: -j = w # LLJ f I Q < w LLJ Z � � Q w Q H C) LLJ x a w Lli0. awr l i a. ur � J Q w s s� W 0 �� ? I LL N LL! cn ,�C, L7 Q ❑ Z w TA IWAY xcr Q� Je,m .. � r w 7 a t Y U7 r I ' 8+00 k_ e' T!" . � . .- - � . '9+ 1 <'4+0 0I _+ooI iS.L:•2-k00,: 00! II ®" f�rI. _)' _ -��"•^' •'"---CIS` , i`t- -zI t ' �.?'f'�}'lf ••rI-,FT } _ — I _.►4 5:I: ;_�I: •i1 I, '�:.' r I r i / . . y vS I :r I . •. rs r j - _ '�' - i f - t Ya i 1+ t - n; _. :,• a ... ,. L' `�, 1 :t . :,ml - .. ..::.: .. i,. 564 SFt4, i—� - — -r+. ;3.OVED 1 wREM _ _ ;. -. �i' �. �, �. _. �_ — . __ _ ._ 1. -- -- - - -- — _ ' 01,1 \'N �m\\\\\7,\\ 1 A-5 .I4.F.:.; _ a _ I 1 I 1 . _ _ — — II _ _ _ —...r s _ j _.; d I I I' r -� i - , .. .. .n , _ : I - �. - , _s_ r ., .. I I - - - - „ .. ,:. R 1: 3•, I' " . :.:.. rr , .., - :, ::,::... _ : 1 .. I - #i. , ,...: ,,, ""', .,r,•. , ,: , •.:: �_ 1 1 F-- 1�S75�\6 ,..- i.. I �•' 1 _ .._ - - - - - - - 1 f" t i 1 M• I _ I 1 ' T . , ,. -: _ r - _ .. — EI ..._ ... . . _ _ _ ..... _ - . - -I s .I I -�� �• I I i I I- I ' 1I I � 4� ,. 1 j 4 l k r I`. . " - „ :. _- II i . . • ..... .. I ' i 1 l _. - 1 1# : ,,,- T i - - _ ...-. . .._...._.-, ._. "--. . _ i _ .. r - - - r j z �. ! i }_ I r. r: .� • i I l _ i I 1 I.- q A# i I �- I I. ,.T��— :r:" .I .. --- I i . .% - 1- - - _.: :, „ __ - - . .�. i I I- i' I• I I I ! I _ i t I,. , . , i" I - -' - - "- — - ,, R - I i i I I 1.. .. : ..: I� i 1. _t I T i , 47 � I I r I I s . , . I I- I•. • . •-- 1.6+06 I I �POo -I i IOC 4 i i 5+0 t•_ I— 6+OC I 7--o0 C i 1 �00 rr�0.•;_ oQ 1 _ ��. +w•—�-Y '"I"�"r—_ — i , -..v._-- -+•— 'r, � T�•� _•.1 �..r�.r .{..— T — , , �'I"' -"T'1 ..'-"�"".�,;_ - . •,#'#-_`TI; ! . •*� _ '�-1—� { _ , — I T' ...�.. — T'_ '`� i z��.y_ . ' r'�"�.. f — I Y 1 • . , I 1 — i - } i , . I: I I r ; I -- I ` - - f 1._ i ;► _ - . ;- . T . t. i - , :; ' y L I _ . ... - .. - - 11 I' 1...T -I t t 1 � .t -I �i I ii:..' _ , -------- I I I yy 1- 1 - - I 1 -,-_ } 1 . . . . , . - " - — _ ., ­11 . ,. . ,- i1 „ r .:. /. _ 1 �—� �-" L 1 ,.:.... ..: — --. .. -- — — — — -- —--- — , % �I I 1 a m: / t i 1. I 1 I INSTALLED _. - - , .. .. ., .. /.. , _ I i �1 . I I I - . .. ... ar.- _ .. , , , , . I 11 - i ,I I : i �i 1 � 1 I �' { ` I _� _1 I r•, .r :rr; -- _. _..... _.... — _ . .._ . -I-- --,—, ._i.._. a_ aa-1— . — i• ,—i--? tl `I• • , ;�•; i .r�.J¢ 1 \: .-�.�� - a - b — —mod— �— � ��.,.e.� �` Y"� I I i I I t: :­ 1� ...f f I I `t'� I� i - t t 1 I7 - �.' i _ _ �' p.! , y vt { t' - "ir .1-r- I }• 17 - _. 7 _1 . t: - 4` y �', - 1 .:_• i. .i. :11 . ��� . - - 1�' _ �l �- :..:. _ r'.f , If.. _ _ - _ - ti- '+r -.' -' .t:��:= "' �•-r• = — T �. s - y-T '7��'­. -'}ti :. .- ­ - $'.1 j'� - - . - ... ... . ....: "'*:.t, _' , -. ' ­-':'..­�..' - ;� '.�. - -' . � . . 3< 3 j •.��i - I. - r• - }. „ _ : : ' rs.-:_+sue._:._ - - .. .�c .s' {, ';"''­.*.'.'-'­:�.'....l .'' .. , I : �­-:'_' .:,.. , - '�;-.­.: " i- � f - ;.: ;• . - - --.� _- .' r i - . ': -. ..'...l. ,;."-.:�,,:-"-.''.-.",.-.*-..,:.--.':;' ..,:.:: -..." --:"..*-: -t-'....;- ..�­"'...'-�­:.�-'�.... . . ...' -;'�' - `._ ......' .....' >i• _—I., .- " - ".. .. F '­ '" - " I - 6.:f ; , ,-' `;� .' _'' . - ' �-"---'X . �, 7 - `' - --- ­'­":�' . %:. .r­�' . "�*r' t 1. ... Zt;.- j., v - . -' _. _.,S . I ... w-11-11 t/ i. :j _ 5 /t . x... .. ., .. •: , : .% - .: "'' " - .. �. , .. Jr ;v ^}. :l-', 2 - _ �• �, Y'« _ -a - i :- •E .� ,. :•..• .: r IMPERVIOUS REMOVED 564 SF (0.01 AC) 635 SF (0.01 AC) 26,565 SF (0.61 AC) 455 SF (0.01 AC) IMPERVIOUS INSTALLED 4,559 SF (0.11 AC) 9,504 SF (0.12 AC) NET IMPERVIOUS TOTAL 68,076 SF (1.57 AC) 32,453 SF (0.75 AC) 14,156 SF (0.33 AC) REMOVED PLAN REVISION PROPOSED: THE PROPOSED PROJECT HAS A NET DEDUCTION OF 14,156 SQUARE FEET (0.33 ACRES) FOR THE AIRPORT'S MASTER STORM WATER MANAGEMENT SYSTEM COVERED UNDER PERMIT SW8-040836. 40 20 0 40 80 120 SCALE IN FEET 1'= 80' 9 H j �^ ¢ :: O 3 ~ 9 z i �+ o 3= IPQ " z z F__ w 4 a W I E I� 4 � I U - w �5 1§ a N r Z O O w Z Fw Z W w> MO V1 > in ." a�N°y < o _ z3 Fa¢=� ax >3w"�- 5; qk z tr O Q Z z W O - (W� a 2 - J J iz Q0��7� �a 0 r 1n ¢ rn o z o w w t- 0 z Z �_ C7 g W W Z Z Z Z J F J Q F- 0 J O Z mQ W Of MAY 2015 Scale r=ao' o.a.e aow Checked ABM Project No. 3307-1305 n # # # EXISTING STORM PIPE FROM RENTAL CAR FACILITY ; � o EXISTING 72" Qo STORMWATER PIPE # s�• \-_::` •` ; CONNECT TO EXISTING �,k r MANHOLE LEGEND DIRECTION OF PIPE FLOW STRUCTURE DRAINAGE AREA B-1 (MANHOLE) 0 B-2 (DROP INLET) 11,135 SF (0.26 AC) B-3 (DROP INLET) 9,026 SF (0.21 AC) B-4 (DROP INLET) 15,307 SF (0.35 AC) B-5 (DROP INLET) 19,045 SF (0.44 AC) B-6 (DROP INLET) 13,563 SF (0.31 AC) IMPERVIOUS AREA 0 4,669 SF (0.11 AC) 5,161 SF (0.12 AC) 2,976 SF (0.07 AC) 13,141 SF (0.30 AC) 6,506 SF (0.15 AC) TOTAL 68,076 SF (1.57 AC) 32,453 SF (0.75 AC) ITEM #3 PROPOSED STORM PIPE 'B' SCHEDULE IV PLAN SHEETS G10 & 011 a�. B — ROAD (NC06r URI - - Y qy� . FpONOA710N � � i I I �- I t- I 1 I li I Ii ! g'• :t P �I i I i .y I 1 { I. .i. I• Fi ii .i i I, �I s 1 1 i I I ! ;I I ••!; i. I I. I .I f I: f i.l. •i ! fl k. ca :r ICON I I• �. F)URO'ATO \ \ ti• 4+Ob j. 'f _ -r i -Y. r -z.�oar` '1:hoo't �• dQ- �QD , y' — ■ — - — ■ - I ti• l �` ✓4 et 4.: \ .;I 'y i _ •r r• i ■ r i s ! a � I h 1 ,.. xs•- EDGE OF .. - - -' W51ON4 BUILDING 1� - I •... ... - -'..0 - a _ .._._. PLAN REVISION PROPOSED: THE PROPOSED PROJECT IS USING 32,453 SQUARE FEET (0.75 ACRES) OF THE PERMITTED FUTURE BUA ALLOCATED FOR THE AIRPORT'S MASTER STORM WATER MANAGEMENT SYSTEM COVERED UNDER PERMIT SW8-050547 DRAINAGE AREA PER INLET IMPERVIOUS AREA PER INLET DRAINAGE AREA B-5 Ap \ B 6 o OLu �. Q 'l- • _ 'si Bj1JtN L Z •COYL1i 30 � 7r. - NDA F K t•• S q< I �I .I �•:Z .y 0 ..i 1 • f t! I 0 K: �: - e I I '1• 'z� - I z i it •z O: ie e J ^.�'.. .� r r � +rr r ! Jf' -1 ppbNQA 3V - :1 '1. +00 :7+ t --r T" _ I —>+ \ I 7 i rt; j 1 a 4 i 40 20 0 40 80 120 SCALE IN FEET 1"= 80, F25p: 2p� WW Z ��VI 3 2�m VO�K w dl� a it YE.HOFno En z z W Z ��! @° O oa QO_z �O IL a�N w �z zrrz in Q Q. Q �L�JJ ILL,H H U —F Z d a o x a a. >3w�aW zZ ¢MZW I Q zz QOw—>V1 �a- 0 v1 ¢ O W W Z J O z Z - S ON 00, 8a U — tn 0 O — z m w ---- MAY 2015 Scale Oraen REM Checked ABM Project No. 3301-1303 Shwt No- 0 -13% VI-MONVI) HJLWO"l XUVAIOO 1040,101H ARK imodiry WNOLLVNV3LM NOISNWL4& dvllq NTSVU TRIMO Weaver, Cameron From: Weaver, Cameron Sent: Friday, February 06, 2015 11:13 AM To: John Massey Cc: Lewis,Linda Subject: RE: ILM General Aviation Apron Pavement Rehabilitation and Storm Water Improvements - Scoping Meeting Request Hi John. Linda Lewis can meet with you to scope on this project on Thursday, Feb.19 at 10 AM here at the DENR offices. Please let me know of others that should attend this meeting or of any other issues. Cameron Cameron Weaver Cameron.Weaver@ncdenr.eov Environmental Assistance Coordinator NCDENR / Division of Environmental.Assistance and Customer Service (DEACS) 127 Cardinal Drive Wilmington, NC 28405 910-796-7303 (F) 910-350-2004 httt)://ncenvironmentalassistance.org/ E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. From: John Massey [mailto:jmassey@tbiilm.com] Sent: Thursday, February 05, 2015 4:41 PM To: Weaver, Cameron Cc: Amy McLane; wprease@flyilm.com Subject: ILM General Aviation Apron Pavement Rehabilitation and Storm Water Improvements - Scoping Meeting Request Cameron, Attached please find a scoping meeting request for the referenced project at Wilmington International Airport. If your schedules permit, we would like to request a meeting on February 16t' or 19th. Thanks for your assistance reviewing and coordinating this meeting request. Please let us know if you need any further information. Thanks, John Massey Talbert & Bright, Inc. 4810 Shelley Drive Wilmington, NC 28405 P: 910-763-5350 F: 910-762-6281 A� North Carolina Department of Environment and Natural Resources NCDENR SCOPING MEETING REQUEST Please complete all the information below. Call and Email the appropriate coordinator with the completed form. • Asheville Region - Alison Davidson 828-2964698; alison.daiddsonftcdenr goy • FayetteviftRaleigh Region David Lee 919-7914203; david leecancdenr goy • Mooriessville/t mston Salem - Patrick Grogan 70f-235-2107 oatnck ffggancmncdenr oov • Washington Region - Lyn Hardison 252-948-3842, Iyn.hardisonfncdenr, gov • Wilmington Region - Cameron Weaver 910-796.7303, cameron. weaveroncdenr gov Project Name: North General Aviation Aaron Pavement Rehabilitation and Storm water Improvements County: New Hanover Applicant: Whitney Prease Company: Wilmington International Airport Address: 1740 Airport Boulevard City: Wilmington State: NC Zip: 28405 Phone: 910-341-4333 Fax: 910-341-4365 Email: wprease(d)flvilm.com Physical Location of Project: Wilmington International Airport. East of Intersection of Trask Drive with Hall Drive and Gardner Drive Engineer/Consultant: John Massey Company: Talbert & Bright Address: 4810 Shelley Drive City: Wilmington State: NC Zip: 28405 Phone: 910-763-5350 Fax: 910-762-6281 Email: imassey( tbiilm.com Please provide a DETAILED project narrative, pdf site plan and a vicinity map with road names along with this Request form. The project narrative should include the following when available: Existing Conditions- List of existing permits, previous project name(s) or owner name(s), existing compliance or pollution incidents, current conditions or development on site, size of tract, streams or wetlands on site*, stream name and classification, historical significance of property, seasonal high water table elevation, riparian buffers, areas of environmental concern, setbacks Proposed- Full scope of project with development phase plan, acreage to be disturbed, wetlands to be disturbed, waste treatment & water supply proposed, soils report availability, % impervious surface, stormwater treatment and number of bmps, public or private funding. *Relative To Wetlands - Federal and coastal wetlands must be delineated by a US Army Corps Regulatory Official, Coastal Management Field Rep or a qualified environmental consultant prior to undertaking work such as filling, excavating or land clearing. The delineations must be approved by the US Army Corps of Engineers (USACE) and/or the Division of Coastal Management. Wetland delineations are valid for a period not to exceed five years from date of USACE approval Please provide estimated investment & expected employment numbers: Jobs For the scoping meeting, it is best to provide a list of questions and topics of concern. It is helpful to know what you hope to gain from the meeting. Please have thoughts and presentations organized as much as possible to make the best use of time. Agencies Involved: Check all agencies that may be involved with project: ❑ Marine Fisheries ❑ National Marine Fisheries ❑ U.S. Fish & Wildlife ❑ Wildlife Resources ❑ Coastal Management ❑ Land Resources ❑ U.S. Army Corps of Engineers ❑ Shellfish Sanitation NWater Resources: (® Stormwater, ❑ 4011buffer, ❑ NPDES, ❑ Aquifer Protection) ❑ Public Water Supply ❑ Air Quality ❑ Solid Waste ❑ UST ❑ Other ❑ Other ❑ Other NCDENR 5coping Meeting October 2013 Wilmington International Airport, ILM, Wilmington, NC North General Aviation Apron Pavement Rehabilitation and Storm water Improvements NCDENR Scoping Meeting Request Narrative February 5, 2015 Existine Conditions The project site consists of developed Airport land, both inside and outside the security fence that divides the `airside' from the `landside'. The project area is bounded by Trask Drive to the West, Taxiway 'A' to the East, the International Terminal (Customs Ramp) to the south and the old Piedmont Hangar and FedEX ramp to the north. The project area is located entirely on Airport property. The project area inside the airport security fence consists of the following existing uses: e Existing North GA concrete apron for parking of general aviation aircraft. a Existing Customs apron and Taxiway A a Existing aircraft storage hangar and existing GA terminal building a Existing grassy area along west edge of apron The project area outside the secure perimeter fence is the former location of rental car service facilities. These facilities have been vacated by the tenants, and will be demolished by the Airport. No wetlands are present within the project area limits. Existing Permits V I � r q The Airport is currently covered by State Stormwater Master Plan Permit No. SW8 040846. The Airport's largest extended dry detention basin and related facilities are covered under a separate State Stormwater Permit No. SW8 050547. S „�vYC7I Proposed Improvements The primary goal of the project is to enable two fixed base operators (FBO) to operate in substantially similar facilities at the north side of the Airport. This project will begin the infrastructure improvements to the proposed FBO area, including rehabilitation of the existing WWII -era concrete aircraft parking apron (or "ramp"), installation of primary drainage infrastructure, and apron construction at the location where a hangar exists today. See attached Figure for the plan view of the proposed project area. Proposed Actions to be completed as part of this project include: • Maintenance activity will include rehabilitation of the existing concrete North General Aviation Apron pavement. The rehabilitation effort will include a concrete overlay of the existing concrete pavement with provisions for full depth replacement as needed to transition to adjacent airfield pavement grades. • Apron Construction to the north once the existing hangar is demolished by the Airport in the Summer of 2015. • Along the western limits of the rehabilitated apron, new drainage infrastructure will be constructed to collect and convey stormwater runoff from the rehabilitated apron to the north. The new drainage system will outfall into an existing drainage ditch, consistent with existing apron drainage patterns. • West of the existing apron and east of Trask Drive, a new storm drainage system will be installed to collect stormwater runoff from the Future GA Re -development Area and convey water to the existing Extended Dry Detention Basin #1. Work in this area also includes modification of the existing ditch west of the North GA Apron. 1 ,' ��, Gam. ^�'. /F . �' *r5. s o�....-,•, •Q,�, fib. ,� •5 � � .r - ,r• � fV yN r PROJECT AREA r "+ �� •� .ter. •:�: _ ,/' a1 ; .£� '` 1 5] 7-3 r - .�� •-� . �" / ' .,> a it 'e:! •,����... •., � ,r' ��.� � �. � •tea •�"' MFUN ENTRANCEly lilt• Y ��r']•e • ,� A CREEK Y - WILMINGTON INTERNATIONAL AIRPORT NORTH GENERAL AVIATION APRON PAVEMENT REHABILITATION & STORM WATER IMPROVEMENTS VICINITY MAP TALBERT & BRIGHT ENGINEERING & PLANNING CONSULTANTS 4810 SHELLEY DRIVE VALMINOTON NC 25405 NE PHO910-793-5350NC FAX 910-792-6281 EMAIL- 7ULMO79IILM.COM LICENSE NO. C-0713