Loading...
HomeMy WebLinkAbout490048_Compliance Evaluation Inspection_20211215Facility Number ( Division of Water Resources 0 Division of Soil and Water Conservation 0 Other Agency Type of Visit:mpliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit: eiciutine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: Farm Name: Arrival Time: Woo J Departure Time: Owner Name: Mailing Address: Physical Address: Facility Contact: l0v0 Owner Email: Phone: County: Region: Onsite Representative: Certified Operator: Back-up Operator: Location of Farm: Title: Latitude: Integrator: Phone: Certification Number: Certification Number: Longitude: 1 IQINIll -q8 / pir /-3o-zz Swine Design Current Capacity Pop. Wean to Finish Wean to Feeder Feeder to Finish Farrow to Wean Farrow to Feeder Farrow to Finish Gilts Boars Other Design Current Wet Poultry Capacity Pop. Layer Non -Layer Design Current Dry Poultry Capacity Pop. Layers Non -Layers Pullets Turkeys Turkey Poults Other Cattle Design Current Capacity Pop. ' Dairy Cow /50 It Dairy Calf 99 /,�636 Dairy Heifer Dry Cow -25' 0 Non -Dairy Beef Stocker Beef Feeder Beef Brood Cow Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWR) c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? ❑ Yes [ o ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑Yes ❑No ❑NA ❑NE ❑ Yes ❑ Yes ❑ Yes ❑No ❑NA ❑NE 114 ❑NA ❑NE ❑NA ❑NE Page 1 of 3 5/12/2020 Continued Facility Number: 4 7 - Date of Inspection: /2-,f/Z / Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? a. If yes, is waste level into the structural freeboard? Structure 1 Identifier: Sktrry 714 Spillway?: Structure 2 6U S'P Designed Freeboard (in): / if T Observed Freeboard (in): Structure 3 Structure 4 El Yes To ❑ NA ❑ NE El Yes El No El NA El NE Structure 5 Structure 6 5. Are there any immediate threats to the integrity of any of the structures observed? El Yes El NA El NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes 1E/No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes EKTo ❑ NA El NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes .To ❑ NA El NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. El Yes L10 ❑ NA ❑ NE ❑ Yes [ To ❑ NA ❑ NE ❑ Yes ITo El NA ❑ NE ❑ Excessive Ponding El Hydraulic Overload ❑ Frozen Ground El Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window 12. Crop Type(s): 13. Soil Type(s): ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 14. Do the receiving crops differ from those designated in the CAWMP? 15. Does the receiving crop and/or land application site need improvement? 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acres determination? 17. Does the facility lack adequate acreage for land application? 18. Is there a lack of properly operating waste application equipment? Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check the appropriate box. El WUP ❑ Checklists ❑ Design ❑ Maps ❑ Lease Agreements 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ['Soil Analysis ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections 22. Did the facility fail to install and maintain a rain gauge? 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? Page 2 of 3 El Yes [ ' o El NA ❑ NE El Yes liKTo ❑ NA ❑ NE El Yes [o ❑ NA El NE ❑ Yes [ to ❑ NA El El Yes 1 To ❑ NA El I�]F ❑ Yes l.'4To ❑ NA ❑ ❑Yes [ Vo ❑NA El El Other: ❑ Yes [io ❑NA El NE, El Waste Transfers El Weather Code ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey ' ❑ Yes [ No El NA ❑ NE El Yes ❑ No ❑ NA EKE 5/12/2020 Continued Facility Number: VI Date of Inspection: /Z,/.0- / 1 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes la4 ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes ❑ No [4A ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ['Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to 'notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes [To ❑ NA 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes E'To ❑ NA L7 1Ve 34. Does the facility require a follow-up visit by the same agency? ❑ Yes ❑ NA El Yes 123/No ❑ NA ❑ Yes ❑ No [tA ❑ Yes lENo ❑ NA ❑ Yes aTo ❑ NA ❑ Yes ❑P ❑ NA El Yes ❑ No ❑ NA ❑ NE ❑ NE ❑ NE ❑ NE ❑ NE 2( ❑ NE ❑ NE ❑ NE Comments (refer to question #): Explain any YES answers and/or any additional recommendations or any other comments. Use drawings of facility to better explain situations (use additional pages as necessary). hpk-Lake 49 in O(r is ipty frc ()vP uv (- Z - 21 , � (nc c. S k w .beec, 1 wln,edv, aiP Yp ero. a 175 /V ou-er -4tzfAr76"1 ni9-kfA suf\e, 4-0 5enet A(t_ ciefAabot, fivexcut5vn r (2efJ;reAtk,u4 Reviewer/Inspector Name: Reviewer/Inspector Signature: Page 3 of 3 Z`, Vl n • a Phone: W —20P (,/> Date: < Z-457 17rtT 5/12/2020