Loading...
HomeMy WebLinkAboutC204535_Suspension_of_Work_Letter_06132022.doc STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION ROY COOPER J. ERIC BOYETTE GOVERNOR SECRETARY Mailing Address: NC DEPARTMENT OF TRANSPORTATION DISTRICT ENGINEER’S OFFICE 220 NORTH BOULEVARD CLINTON, NC 28328 Telephone: 910-682-5100 Fax: 910-592-8209 Customer Service: 1-877-368-4968 Website: ncdot.gov Location: 220 NORTH BOULEVARD CLINTON, NC 28328 CL June 13, 2022 WBS No. 45594.3.1 Contract No. C204535 TIP No. B-5639 County Duplin Description Bridge #36 Over Maxwell Creek on NC-11 (Clodfelter Rd) Subject: Suspension of Work due to Erosion Compliance Concerns David Knoll ST Wooten Corporation P.O. Box 2408 Wilson, NC 278942408 Mr. Knoll: In accordance with Article 108-7 (A), in the 2018 NCDOT Standard Specifications for Roads and Structures, all work on the construction of the project, except for erosion control, is being suspended immediately (June 13, 2022). Work is being suspended due to Erosion Compliance Concerns on the project. All erosion concerns on the project including but not limited to those issues related to the last rainfall event which occurred on June 8, 2022 must be satisfactorily completed and verified by the Engineer prior to resuming any work on the project. As of today, June 13, 2022, no effort has been made to remove lost material from behind the silt fence or material that has been displaced up against the silt fence in multiple areas. Work will resume upon notification from the Department. If you have any questions, please advise. Sincerely, Dan Cumbo, PE Resident Engineer CC: Anthony Law, Division Construction Engineer Trevor Carroll, PE, Assistant Division Construction Engineer Sean Farrell, Environmental Program Supervisor