Loading...
HomeMy WebLinkAboutDuplin Bridge 36 (B-5639) on NC 11 sediment lossesFrom:Westphal, Anneliese To:Sprinkle, Hannah H; Shaver, Brad E SAW Cc:Farrell, Sean C; Bullard, Jason M Subject:Duplin Bridge 36 (B-5639) on NC 11 sediment losses Date:Thursday, June 9, 2022 9:25:12 PM Attachments:image001.png Duplin 36 Loss Area 1.JPG Duplin 36 Sediment Loss Area 2.jpg Duplin 36 Sediment Loss Area 3.jpg Duplin 36 Sediment Loss Area 4 at abutment photo 2.JPG Duplin 36 Sediment Loss Area 4 at abutment.jpg Hi Brad and Hannah, To add to the information in Sean’s email regarding sediment losses at the subject bridge, please see the attached photos of 4 sediment loss areas. These occurred yesterday (6/8/2022) after heavy rain. The inspector mentioned that there was 3 inches of rain. With the exception of loss area 4, the losses appeared to occur due to water flow to weak spots in the top of the fabric. Area 1 In the vicinity of L -Det.- Sta 13+15 right in an existing NJ ditch (conveyance) area, the existing ditch area filled with sediment. There was a wattle break in the silt fence here which was overwhelmed. The area is 25’ x 6’ x 6” deep. The are no wetlands in this conveyance area except for at the end of the sediment impact. The contractor has started removing sediment from the conveyance. There is a ponded area just beyond, which the sediment did not reach. The pond is labelled on the permit drawings. Area 2 This is in the vicinity of L -Det.- Sta. 14+30 right. A small amount of sediment overwhelmed the silt fence here and is in the wetlands. The area is 2’ x 1’ and unknown depth. The contractor will remove with had tools. Area 3 This area is in the vicinity of L -Det.- Sta. 14+35 right. The sediment that went over the silt fence in the area is 6’ x 4’ x 7” depth at the thickest to 1” at the edge of the loss. The contractor will remove with hand tools. Area 4 This area is in front of the abutment at end bent 1. The existing abutment was cut and will remain; in one of the pictures you can see the form of the new end bent 1. The sediment went into the stream, and is contained by the silt fence. The sediment will be removed by hand tools. The area above the loss will be raked back. Silt fence will be installed at the edge of the cut abutment. Riprap will be eventually be placed in front of end bent 1. As Sean mentioned, there are several areas where they will need to remove material from inside the silt fence (the hand clearing area). We can follow-up with their progress on the clean-up. Please let me know if you have any questions. Thank you. Anneliese Anneliese Westphal Environmental Senior Specialist Division 3 NCDOT- Division of Highways 910 341 2000 office 910 604 1330 mobile 910 675 0143 fax awestphal@ncdot.gov 5501 Barbados Blvd Castle Hayne, NC 28429-5647 Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.