Loading...
HomeMy WebLinkAboutGW1-2022-05521_Well Construction - GW1_20220603 WELL CONSTRUCTION RECORD(GW-1) For Internal Use Only: 1.Well Contractor Information: Landon Phillips 14.NVATER ZONES Well Contractor Name - FROM TO DESCRIPTION 3441 A o ft ft. G t� ft. DVS ft d NC Well Contractor Certification Number M OUTER CASING for multi-cased w OR LINER if a licable NW Poole Well and Pump Company FROM TO I DIAMETER PTHICKNESS MATERIAL Company Name � , C • � 16.INNER CASING OR TUBING fizeothermal closed-loo 2.Well Construction Permit#: FROM TO DIAMETER THICKNESS MATERIAL List all applicable well construction permits(i.e.UIC,County,State,I'ariance,etc) ft ft in. 3.Well Use(check well use): tt. ft. In Water Supply Well: 17.SCREEN.' FROM . TO DIAMETER SLOT SIZE THICKNESS MATERIAL ❑Agricultural ❑Municipal/Public ft. ft. is ❑Geothermal(Heating/Cooling Supply) )('Residential Water Supply(single) ft. tt. in ❑hldustrial/Commercial ❑Residential Water Supply(shared) 18.GROUT 011TI ation ❑Wel Is>100,000 GPD FROM I TO MATERIAL EMPLACEMENT METHOD&AMOUNT Non-Water Supply Well: 0 n IL T Nf �Gt't EA ❑Monitoring ❑Recovery ft ft. Injection Weil: ft. ft. ❑Aquifer Recharge ❑Groundwater Remediation 19.SAND/GRAVEL PACK if a licable ❑Aquifer Storage and Recovery ❑Salinity Barrier FROM TO MATERIAL I EMPLACEMENT METHOD ❑Aquifer Test ❑Stormwater Drainage ft. ft. ❑Experimental Technology ❑Subsidence Control ft. ft. ❑Geothermal(Closed Loop) ❑Tracer 20,DRILLING LOG attach additional sheets if necessary) FROM TO DESCRIPTION color,hardness soil/mck a rain size etc. ❑Geothermal(Heating/Cooling Return) ❑Other(explain under#21 Remarks O ft. A ft. Z_ 4.Date Well(s)Completed: t/_ ?_XWell ID# ft' S "' 5a.Well Location: $' ft. �eSf S o?'Z ft iL /T Facility/Owner Name Facility lD#(if applicable) ft. ft /3*71 FAG L f 91 btl b R ft. ft. Physical Address,City,and Zip ay) ft. ft JVR 21:REA7ARKS n A E 6 County Parcel Identification No.(PIN) c OF uE:i 6-" I ON Sb.Latitude and longitude in degrees/minutes/seconds or decimal degrees: `'"`�O'�'`�"T`-'' (if well field,one lat/long is sufficient) 22.Certifica 35.29 gi11 N �l�v n��- w I' .J.2 6.Is(are)the well(s): ®Permanent or ❑Temporary Signature of Certified Well Contractor _ Date By signing this form,I hereby certify that rite ivell(s)was(were)constructed in accordance with 7.Is this a repair to an existing well: ❑Yes or MNo 15A NCAC 01C.0100 or 15A NCAC 02C.0100 lVell Construction Standards and that a copy If this is a repair,fill out known well construction information and explain the nature of the ofthis record has been provided to the well owner. repair under#21 remarks section or on the back ofthis form. 23.Site diagram or additional well details: 8.For Geoprobe/DPT or Closed-Loop Geothermal Wells having the same You may use the back of this page to provide additional well construction info construction,only I GW-1 is needed. Indicate TOTAL NUMBER of wells (add'See Over'in Remarks Box).You may also attach additional pages if necessary. drilled: 1 24.SUBMITTAL INSTRUCTIONS 9.Total well depth below land surface: /ps• S (ft.) Far multiple wells list all depths ifeli ferent(example-3@100'and z@100) Submit this GW-1 within 30 days of well completion per the following: 10.Static water level below top orcasing: PO (ft.) B 24a. For All Wells: Original form to Division of Water Resources (DWR), If water level is above casing,use +^ / ) Information Processing Unit,1617 MSC,Raleigh,NC 27699-1617 IL Borehole diameter: (in,) 24b.For Injection Wells:Copy to DWR,Underground Injection Control(IUC) Rotary Program,1636 MSC,Raleigh,NC 27699-1636 12.Well construction method, (i.e.auger, 24c.For Water Supply and Open-Loop Geothel Return Wells:Copy to the ,rotary,cable,direct push etc.) county environmental health department of a counrma ty where installed FOR WATER SUPPLY WELLS ONLY: 24d.For Water Wells -duciri over 100,000 GPD:Copy to DWR,CCPCUA 13a.Yield(gpm) ' ! Method of test: Blow Permit Program,1611 MSC,Raleigh,NC 27699-1611 13b.Disinfection type: HTH Amount: 1 lb. Form GW-I North Carolina Department of Environmental Quality-Division of Water Resources Revised 6-6-2018 I