Loading...
HomeMy WebLinkAboutSW6220101_Design Calculations_20220614 (5)Woodshire Subdivision Phase 7 Wet Pond Drawdown Time Temporary storage volume = Orifice #Idiameter= Area of orifice = Orifice #2 diameter = Area of orifice = Orifice Coefficient (Cd) _ Orifice elevation -- Water elevation --- Driving head (H) _ Discharge (Q) _ Drawdown time = 33,237 cf 2.5 in 1 0.0341 sf 0 in 0 0.0000 sf 0.60 279.50 ft 283.43 ft 1.31 ft 0.1879 cfs 176900 s 49.1 hr 2_0 days 1070-POND 1 drawdown.xlsx Printed 6/14/2022