Loading...
HomeMy WebLinkAboutSW6220101_Design Calculations_20220614 (3)Woodshire Subdivision Phase 7 Wet Pond Main Pond Volume Below Normal Pool Contour Contotu Incr. Ace=. Elev. Area Storage Storage (S) (ft) (sfl (efl (efl 270.5 1,902 - - 271.0 2,185 1,022 1,022 271.5 2,479 1,166 2,188 272.0 2,783 1,316 3,503 272.5 3,097 1,470 4,973 273.0 3,422 1,630 6,603 273.5 3,758 1,795 8,398 274.0 4,104 1,966 10,364 274.5 4,462 2,142 12,505 275.0 4,832 2,324 14,829 275.5 5,216 2,512 17,341 276.0 5,611 2,707 20,047 276.5 6,020 2,908 22,955 277.0 6,441 3,115 26,070 277.5 6,874 3,329 29,399 278.0 7,320 3,549 32,948 278.5 7,779 3,775 36,722 279.0 8,251 4,008 40,730 279.5 9,632 4,471 45,201 Forebay Volume Below Normal Pool Contour Contour Incr. Ace=. Elev. Area Storage Storage (S) (ft) (sfl (efl (efl 272.0 142 - - 272.5 206 87 87 273.0 281 122 209 273.5 369 163 371 274.0 468 209 581 274.5 578 262 842 275.0 697 319 1,161 275.5 826 381 1,542 276.0 964 448 1,989 276.5 1,112 519 2,508 277.0 1,269 595 3,103 277.5 1,435 676 3,779 278.0 1,611 762 4,541 278.5 1,796 852 5,393 279.0 1,990 947 6,339 279.5 2,511 1,125 7,464