Loading...
HomeMy WebLinkAboutNC0004243_NOV2022LV0360_RESP_20220607Coats North America 7 June 2022 North Carolina Department of Environmental Quality Division of Water Resources 2090 U.S. Highway 70 Swannanoa, NC. 28778 Reference: Coats American, Inc. Notice of Violation (NOV) — NOV-2022-LV-0360 Permit No. NC0004243 Sevier Plant WWTP McDowell County Issuance Date: 31 May 2022 Attn: Ms. Lauren Armeni Ms. Armeni, This letter is in response to the Notice of Violation (NOV) dated 31 May 2022 regarding'a daily maximum exceedance for the BOD parameter. The BOD daily maximum value reported on 21 April 2022 was 214.34 lbs./day, while the permitted daily maximum limit is 188.5 lbs./day. An internal investigation has been initiated to determine the source of the elevated BOD levels resulting in the permit exceedance. The investigation includes a cause analysis and the creation of an action plan aimed at preventing recurrence of the event. The chemical usage throughout the plant, including the dye house, bonding operations, and housekeeping and maintenance, was reviewed and no abnormal usage, spills, or releases to the wastewater treatment facility were identified. All mechanical systems at the treatment facility are reported in good operating condition and the sampling protocol was followed. No other changes or upsets to the operation of the wastewater treatment facility were noted during the investigation prior to the April exceedance. Following the high BOD levels on 21 April, subsequent BOD levels for the remainder of the month of April and May are well below the daily maximum permit limits. The Coats American Sevier facility takes every effort to ensure compliance with all permit limits, monitoring, and reporting requirements, and believes the appropriate actions have been taken Coats will continue to investigate and monitor the chemical usage and operation of the wastewater treatment facility. Please feel free to contact me directly if you have any questions or need any further documentation to address this NOV. Sincerely, Signature: Date: Emrah Bilgin Manufacturing Director Coats American, Inc.- Sevier emrah.bil in coats.com 828- 559- 7698 b (412o22_ cc: John Moss, Facilities Engineering Manager- Coats North America Todd Wegenast, Environmental Compliance Manager- Coats North America