HomeMy WebLinkAbout490067_Compliance Evaluation Inspection_20211117 __ //
Cy'Division of Water Resources
Facility Number 7 - 67 0 Division of Soil and Water Conservation 1 /
0 Other Agency
Type of Visit: ® Com fiance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance
Reason for Visit: C9'Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access
Date of Visit: W�m Arrival Time: a Sa Departure Time: /35- County: Region:
&eS Owner Email:Farm Name: Pr(G& O�T "`�3
Owner Name: Phone:
Mailing Address:
Physical Address:
Facility Contact: CAS i(�U I r�G� Title: Phone:
Onsite Representative: Integrator:
Certified Operator: Certification Number:
Back-up Operator: Certification Number:
Location of Farm: Latitude: Longitude:
/9 & ('Fq -C7
Design Current Design Current Design Current
Swine Capacity Pop. Wet Poultry Capacity Pop. Cattle Capacity Pop.
Wean to Finish Layer Dairy Cow I SO l
Wean to Feeder Non-Layer Dairy Calf
Feeder to Finish Dairy Heifer
Farrow to Wean Design Current Dry Cow
Farrow to Feeder D Poul Ca m aci Po 1. Non-Dairy
Farrow to Finish -- Beef Stocker
Gilts •Non-La ers -- Beef Feeder
Boars •Pullets -- Beef Brood Cow
Other •Turke Poults
Other •Other -- !
Discharges and Stream Impacts
1.Is any discharge observed from any part of the operation? ❑ Yes No ❑ NA ❑ NE
Discharge originated at: ❑ Structure ❑ Application Field ❑ Other:
a. Was the conveyance man-made? ❑ Yes ❑ No ❑NA ❑
b. Did the discharge reach waters of the State?(If yes,notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE
c. What is the estimated volume that reached waters of the State(gallons)?
d. Does the discharge bypass the waste management system?(If yes,notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE
2.Is there evidence of a past discharge from any part of the operation? ❑ Yes Ls25 ❑ NA ❑ NE
3.Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes D7No ❑ NA ❑ NE
of the State other than from a discharge?
Page 1 of 3 2/4/2014 Continued
Facility Number: ] - 67 Date of Inspection: /07/Z/
Waste Collection&Treatment
4.Is storage capacity(structural plus storm storage plus heavy rainfall)less than adequate? ❑ Yes E No ❑ NA 0 NE
a.If yes,is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE
Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6
Identifier:
Spillway?:
Designed Freeboard(in): Si 2
Observed Freeboard(in): 2
5.Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes �No ❑ NA ❑ NE
(i.e.,large trees,severe erosion,seepage,etc.)
6.Are there structures on-site which are not properly addressed and/or managed through a ❑ Yes C9 No ❑ NA ❑ NE
waste management or closure plan?
If any of questions 4-6 were answered yes,and the situation poses an immediate public health or environmental threat,notify DWR
7.Do any of the structures need maintenance or improvement? ❑ Yes ❑ NA ❑ NE
8.Do any of the structures lack adequate markers as required by the permit? ❑ Yes No ❑ NA ❑ NE
(not applicable to roofed pits,dry stacks,and/or wet stacks)
9.Does any part of the waste management system other than the waste structures require ❑ Yes KNo ❑ NA ❑ NE
maintenance or improvement?
Waste Application
10.Are there any required buffers,setbacks,or compliance alternatives that need ❑ Yes [g No ❑ NA ❑ NE
maintenance or improvement?
11.Is there evidence of incorrect land application?If yes,check the appropriate box below. ❑ Yes ['No ❑ NA ❑ NE
❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals(Cu,Zn,etc.)
❑ PAN ❑ PAN> 10%or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil
❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area
12.Crop Type(s):
13. Soil Type(s):
14.Do the receiving crops differ from those designated in the CAWMP? ❑ Yes [o ❑ NA ❑ NE
15.Does the receiving crop and/or land application site need improvement? ❑ Yes ErNo ❑ NA ❑ NE
16.Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes [ "No ❑ NA ❑ NE
acres determination?
17.Does the facility lack adequate acreage for land application? ❑ Yes dNo ❑ NA ❑ NE
18.Is there a lack of properly operating waste application equipment? ❑ Yes III/No ❑ NA ❑ NE
Required Records&Documents
19.Did the facility fail to have the Certificate of Coverage&Permit readily available? ❑ Yes []'No ❑ NA ❑ NE
20.Does the facility fail to have all components of the CAWMP readily available?If yes,check ❑ Yes 7No ❑ NA ❑ NE
the appropriate box.
❑WUP ❑Checklists ❑Design ❑Maps ❑ Lease Agreements ❑Other:
21.Does record keeping need improvement?If yes,check the appropriate box below. ❑ Yes D \To ❑ NA ❑ NE
❑Waste Application ❑Weekly Freeboard ❑Waste Analysis ❑Soil Analysis ❑Waste Transfers ❑Weather Code
❑Rainfall ❑Stocking ❑Crop Yield ❑120 Minute Inspections ❑Monthly and 1"Rainfall Inspections ❑Sludge Survey
22.Did the facility fail to install and maintain a rain gauge? ❑ Yes [l /No ❑ NA ❑ NE
23.If selected,did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No ❑ NA Et<TE
Page 2 of 3 2/4/2015 Continued
Facility Number: VI - Date of Inspection: V Z/�/
24.Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes R4 o ❑ NA ❑ NE
25.Is the facility out of compliance with permit conditions related to sludge? If yes,check ❑ Yes ❑ No 'NA ❑ NE
the appropriate box(es)below.
❑Failure to complete annual sludge survey ❑Failure to develop a POA for sludge levels
�❑Non-compliant sludge levels in any lagoon
List structure(s)and date of first survey indicating non-compliance:
26.Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes No ❑ NA ❑ NE
27.Did the facility fail to secure a phosphorus loss assessments(PLAT)certification? ❑ Yes ❑ No [ NA ❑ NE
Other Issues
28.Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes [No ❑ NA ❑ NE
and report mortality rates that were higher than normal?
29.At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ❑ NA ❑ NE
If yes,contact a regional Air Quality representative immediately.
30.Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes 12Nro ❑ NA ❑ NE
permit?(i.e.,discharge,freeboard problems,over-application)
31.Do subsurface tile drains exist at the facility?If yes,check the appropriate box below. ❑ Yes ❑ No ❑ NA aKE
❑ Application Field ❑ Lagoon/Storage Pond ❑ Other:
32.Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes INo ❑ NA ❑ NE
33.Did the Reviewer/Inspector fail to discuss review/inspection with an on-site representative? ❑ Yes EK\Io ❑ NA ❑ NE
34.Does the facility require a follow-up visit by the same agency? ❑ Yes IlKo ❑ NA ❑ NE
Comments(refer to question#):Explain any YES answers and/or any additional recommendations or any other comments;
Use drawings of facility to better explain situations(use additional pages as necessary).
a,ve, D; rc,--23 CO user, d' V(k
Reviewer/Inspector Name: �1C/�'lG'-�/( l ' t e4 l/ Phone: ?e 7'9 - 0/7-
Reviewer/Inspector Signature: Date: /0 7720 z i
Page 3 of 3 2/4/2015