Loading...
HomeMy WebLinkAbout840012_Compliance Evaluation Inspection_20211029 ivision of Water Resources Facility'Number j/ _ /Z 0 Division of Soil and Water Conservation 0 Other Agency Type of Visit: ©compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit: 0,11/outine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: (G-Z4-Z Arrival Time:I 4/j Departure Time: (0 30 County: Region: Farm Name: Srii,"1'ti Oa f L Owner Email: Owner Name: Phone: Mailing Address: • Physical Address: Facility Contact: Title: Phone: Onsite Representative: Integrator: Certified Operator: Certification Number: Back-up Operator: - Certification Number: - t Location of Farm: • Latitude: Longitude: /91/4/Chet —j2. • Design Current Design Current Design Current Swine $> Capacity Pop. Wet-Poultry Capacity_ Pop. Cattle - Capacity Pop. Wean to Finish Layer Dairy Cow 4/f8 j 7.0 Wean to Feeder Non-Layer Dairy Calf Feeder to Finish Dairy Heifer Farrow to Wean e` Design-,Current Dry Cow Farrow to Feeder _ _ D Poultr Ca.aci Po 1; Non-Dairy Farrow to Finish • -- Beef Stocker Gilts _- <•Non-La ers _- Beef Feeder Boars •Pullets Beef Brood Cow MEMEE Other : ° Turke Poults Other •Other �� e Discharges and Stream Impacts 1.Is any discharge observed from any part of the operation? ❑ Yes No ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes ❑ No ❑ NA ❑ NE b. Did the discharge reach waters of the State?(If yes,notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State(gallons)? d. Does the discharge bypass the waste management system?(If yes,notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE 2.Is there evidence of a past discharge from any part of the operation? ❑ Yes L!}1VU ID NA ❑ NE 3.Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes io ❑ NA ❑ NE of the State other than from a discharge? Page 1 of 3 2/4/2015 Continued Facility-Number: - / Date of Inspection: t0--Z'/'!�/ Waste Collection&Treatment 4.Is storage capacity(structural plus storm storage plus heavy rainfall)less than adequate? ❑ Yes No ❑ NA ❑ NE a.If yes,is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard(in): 1 6 Observed Freeboard(in): c5-9- 5.Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes o ❑ NA ❑ NE (i.e.,large trees,severe erosion,seepage,etc.) 6.Are there structures on-site which are not properly addressed and/or managed through a ❑ Yes [ to ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes,and the situation poses an immediate public health or environmental t reat,notify DWR 7.Do any of the structures need maintenance or improvement? ❑ Yes ❑ NA ❑ NE 8.Do any of the structures lack adequate markers as required by the permit? ❑ Yes ao ❑ NA ❑ NE (not applicable to roofed pits,dry stacks,and/or wet stacks) 9.Does any part of the waste management system other than the waste structures require ❑ Yes To ❑ NA ❑ NE maintenance or improvement? Waste Application 10.Are there any required buffers,setbacks,or compliance alternatives that need ❑ Yes o ❑ NA ❑ NE maintenance or improvement? 11.Is there evidence of incorrect land application?If yes,check the appropriate box below. ❑ Yes g o ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals(Cu,Zn,etc.) ❑ PAN ❑ PAN> 10%or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12.Crop Type(s): 13.Soil Type(s): 14.Do the receiving crops differ from those designated in the CAWMP? ❑ Yes C No ❑ NA ❑ NE 15.Does the receiving crop and/or land application site need improvement? ❑ Yes al(o ❑ NA ❑ NE 16.Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes [ o ❑ NA ❑ NE acres determination? 17.Does the facility lack adequate acreage for land application? ❑ Yes D4o ❑ NA ❑ NE 18.Is there a lack of properly operating waste application equipment? ❑ Yes M7No ❑ NA ❑ NE Required Records&Documents 19.Did the facility fail to have the Certificate of Coverage&Permit readily available? ❑ Yes E • ❑ NA ❑ NE 20.Does the facility fail to have all components of the CAWMP readily available?If yes,check ❑ Yes `j No ❑ NA ❑ NE the appropriate box. ❑WUP ❑Checklists ❑Design ❑Maps ❑ Lease Agreements ❑Other: 21.Does record keeping need improvement?If yes,check the appropriate box below. Yes No ❑ NA NE ❑Waste Application ['Weekly Freeboard El Waste Analysis ❑Soil Analysis ❑Waste Transfers ❑Weather Code ❑Rainfall ❑Stocking ❑Crop Yield El 120 Minute Inspections El Monthly and 1"Rainfall Inspections ❑Sludge Survey 22.Did the facility fail to install and maintain a rain gauge? ❑ Yes to ❑ NA ❑ N 23.If selected,did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No ❑ NA Page 2 of 3 2/4/2015 Continued Facility Number: g - - /Z Date of Inspection: (0—z9 24.Did the facility fail to calibrate waste application equipment as required by the permit? 0 Yes No ❑ NA ❑ NE 25.Is the facility out of compliance with permit conditions related to sludge? If yes,check ❑ Yes ❑ No let 11t' ❑ NE the appropriate box(es)below. ❑Failure to complete annual sludge survey ❑Failure to develop a POA for sludge levels ❑Non-compliant sludge levels in any lagoon List structure(s)and date of first survey indicating non-compliance: 26.Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes io ❑ NA ❑ NE 27.Did the facility fail to secure a phosphorus loss assessments(PLAT)certification? ❑ Yes ❑ No 1A El NE Other Issues 28.Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes [KKo ❑ NA ❑ NE and report mortality rates that were higher than normal? 29.At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes No ❑ NA ❑ NE If yes,contact a regional Air Quality representative immediately. 30.Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes gA ❑ NA ❑ NE permit?(i.e.,discharge,freeboard problems,over-application) 31.Do subsurface tile drains exist at the facility?If yes,check the appropriate box below. ❑ Yes ❑ No ❑ NA ❑Application Field ❑ Lagoon/Storage Pond ❑ Other: 32.Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes 0/go ❑ NA ❑ NE 33.Did the Reviewer/Inspector fail to discuss review/inspection with an on-site representative? ❑ YesR/go ❑ NA ❑ NE 34.Does the facility require a follow-up visit by the same agency? ❑ Yes n4or ❑ NA ❑ NE Comments(refer to question#):Explain any YES answers and/or any additional recommendations or any other comments Use drawings of facility to better explain situations(use additional pages as necessary). 5 e.d nel ch I ems."; t - cden r • • Reviewer/Inspector Name: /19!thatt l`�i/l u✓ty rf_ Phone: 9's 7 q-0'?2 Reviewer/Inspector Signature: Date: l0 ZR Page 3 of 3 2/4/2015