HomeMy WebLinkAboutSW3220302_Supplement-EZ Form_20220613SUPPLEMENT-EZ COVER PAGE E M5I..2gpfp PROJECT INFORMATION 1 Project Name Denver Defense 2 Project Area (ac) 4.494 3 Coastal Wetland Area (ac) N/A 4 Surface Water Area (ac) N/A 5 Is this project High or Low Density? High 6 Does this project use an off -site SCM? No NUMBER AND TYPE OF SCMs: 11 Infiltration System 12 Bioretention Cell 13 Wet Pond.. 14 Stormwater Wetland 15 Permeable Pavement 16 Sand Filter .... .... .... .... .... .... .... .... .... .... ..1 17 Rainwater Harvesting TM) 18 Green Roof 19 Level Spreader -Filter Strip 20 Disconnected Impervious Surface (DIS) 21 Treatment Swale 22 Dry Pond .. 23 Storm Filter 24 Silva CelL........ 25 Bayfilter 26 �Filterra IHII101IpIC DESIGNER CERTIFICATION 27 Name and Title: Jay Henson, Principal 28 Organization: HensonFoley 29 Street address: 121 Gilead Rd. 30 City, State, Zip: Huntersvill, NC, 28078 31 1 Phone number(s): 704„-875-1615 32 Email: jay@hensonfoley.com Certification Statement: I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. \\\\�1111III///// � �/�i PADS • S •� / / w � / �� A . H'E c00 /III I IAAA/\\\\ 4 1 � V4� r 'W' V Sign ture of besigner 6/9/2022 Date DRAINAGE AREAS ............................................................................................................................................................................................................................................................................. 1 Is this a high density project? Yes 2 lisp, number of drainage areas/SCMs 1 3 Does this„project have low density areas No 4 If so number of low density drainage areas 0 Is all/part of this project subject to previous rule 5 versions? No Mai I.. LP..F.D DRAINAGE AREA INFORMATION Entire Site 1 4 Type of SCM N/A sand filter 5 Total drainage area kq ft 195759 119449 6 Onsite drainage area (sq ft 195759 117333 7 Offsite drainage area s ft 0 2116 8 .........................................g..........................(sq......)......................................................................................................................................................................................................................... Total BUA in project (sq ft) 121358 sf 72929 sf New BUA on subdivided lots (subject to 9 permitting) (sq ft) N/A N/A.. New BUA not on subdivided lots (subject to 10 ermittin sf 87385 sf 53641 sf 11 Offsite BUA s ft N/A 2116 sf 12 Breakdown of new BUA not on subdivided lots: Parking„ (sq ft) 51222 sf 40041 sf - Sidewalk (sq ft) 1600 sf 1600 sf Roof (sq ft) 17203 sf„ 12000„sf Roadway (sq ft) Future„(sq ft) 17360 sf„ Other, please specify in the comment box below (sq ft New infiltrating permeable pavement on 13 subdivided lots (sq ft) N/A N/A New infiltrating permeable pavement not on 14 subdivided lots (sq ft N/A N/A Existing BUA that will remain (not subject to 15 permitting) (sq ft) 33973 sf 17172 sf 16 Existing BUA that is already permitted„ (sq ft) 17 Existing BUA that will be removed (sq ft) 16572 sf„ 2900 sf 18 Percent BUA 49% 61 % 19 Design storm (inches) 1.0 in 1.0 in 20 Design volume of SCM (cu ft) n/a 4611 cf 21 Calculation method for design volume n/a Simple RV method ADDITIONAL INFORMATION �Please use this space to provide any additional information about the 22 drainage a rea(s) With site conditions it was found impossible to get all new BUA to BMP. As a comprimise, some existing BUA would be taken to bmp and that the final BUA number to BMP was greater than proposed BUA. SAND FILTER III 1 Drainage area number 1 ............................................................. Yes No Yes ............................................................. Yes ............................................................. Drawdown Orifice ............................................................. Yes 18 SHWT elevation (fmsl) 831.5 19 Type of sand filter (open or closed) Open 20 If closed, will the filter will be pre -cast or pour -in -place? 21 If closed, top of grate elevation (fmsl) 22 Is this sand filter designed to attenuate peak flows? Yes Sediment Chamber 23 Volume that can be retained in the sediment chamber (cubic feet) 2305 cf 24 Will there be a permanent pool in the sediment chamber? No 25 Bottom of the sediment chamber (fmsl) 842.00 26 Area of the sediment chamber (square feet) 500 sf 27 Physical depth of the sediment chamber (inches) 18 in 28 Ponding depth in the sediment chamber, above any permanent 18 in pool (inches) 29 Elevation of top of weir between chambers (fmsl) 843.5 Sand Chamber 30 Volume that can be retained in the sand chamber (cubic feet) 2305 cf 31 Bottom of the sand chamber (fmsl) 841.50 32 Area of the sand chamber (square feet) 525 sf 33 Physical depth of the sand chamber (inches) 24 in 34 Ponding depth in the sand chamber, above the sand surface 24 in (inches) 35 Elevation of the bypass device (fmsl) 843:5 36 Type of bypass device 6" ORIFICE 37 Mechanism for distributing flow over the sand surface RIP -RAP BERM 38 Sand specification for sand chamber ASTM C33 39 Depth above underdrain pipe (inches) 18 in 40 Will the media be maintained to drain at least two inches per hour at Yes the sand surface? 41 Is at least one clean -out pipe provided at the low point of each Yes underdrain line? 42 Will clean -out oioes be capped? Yes Please use this space to provide any 43 the sand filter(s): Sand Filter 1 4:03 PM 6/9/2022