Loading...
HomeMy WebLinkAbout20210829 Ver 1_Plans with Stormwater Basin_20220511Strickland, Bev From: Tony Moctezuma <tmoctezuma@tidewaterenc.com> Sent: Wednesday, May 11, 2022 9:33 AM To: Perry, John M Subject: Re: [External] Re: The Vineyards 20210829 Attachments: scan0250.pdf CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Good morning, Here is an overall grading plan showing the pond in question has been moved out of the wetlands. I can update the impact maps to reflect the change, but had a few questions first. With the existing impacts mentioned previously, could you explain what you were saying with how these should be considered existing impacts versus new impacts? Tony Moctezuma, El 306 New Bridge Street Jacksonville NC, 28540 910-455-2414 ext 116 TIDEWATER ASSOCIATES, INC. On 4/25/2022 2:00 PM, Perry, John M wrote: Hey Tony, here are the two crossing that we discussed today. Let me know if you have any questions. Thanks, John Perry Environmental Specialist II Divison of Water Resources Department of Environmental Quality 127 Cardinal Drive Extension Wilmington, NC 28405 Office: (910) 796-7341 Cell: (910) 617-9577 From: Tony Moctezuma <tmoctezuma@tidewaterenc.com> Sent: Monday, April 25, 2022 1:18 PM To: Perry, John M <John.Perry@ncdenr.gov> Cc: Jessop, Jordan E CIV USARMY CESAW (USA) <Jordan.E.Jessop@usace.army.mil>; Mickey Sugg 1 <Mickey.t.sugg@usace.army.mil> Subject: [External] Re: The Vineyards 20210829 CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Good afternoon, Do you have an update on this project? Were you able to gather the additional information you were looking for, and if not is there anything I can provide you on my end? thanks, Tony Moctezuma, El 306 New Bridge Street Jacksonville NC, 28540 910-455-2414 ext 116 TIDEWATER ASSOCIATES, INC. On 3/8/2022 9:54 AM, Perry, John M wrote: Hello Tony, I hope you are doing well. I am writing this email to inform you that I will have to place this project on hold. I am coordinating to with the Army Corps of Engineers (Jordan Jessup) to work through a few issues with this project. Until I can get answers from the Corps I will not be able to process this 401 request. One of the issues that I am trying to sort out is the stormwater basin that is located in a wetland, as I understand this is prohibited under the NW 29. I am reaching out to the Corps to clarify. We will also discuss the cumulative impacts of all of the sub -divisions within the Vineyards project. The existing culverts on the Windsor Run, Twisted Vine and Secret Garden do not, to my understanding have any previous permits associated with them and are currently failing. Will these culverts be removed and the streams restored or will they become part of a new crossing and new culverts installed? The Division of Water Resources (DWR) has additional questions regarding the proposed development and has determined that additional information will be necessary to complete the review of your permit application. The application is on hold until all of the following information has been received by our office. Please let me know if you have any questions. Thanks, John Perry Environmental Specialist II Divison of Water Resources Department of Environmental Quality 127 Cardinal Drive Extension Wilmington, NC 28405 Office: (910) 796-7341 2 Cell: (910) 617-9577 3 Drainage Pipe Chart AREA Q10 DIAMETER GRADE LENGTH PIPE (acres) (cfs) (inches) M (if) Kl 0.2 1.3 18" RCP 0.3 32 K2 0.4 2.6 18" RCP 0.4 364 K3 0.1 0.6 18" RCP 0.6 32 K4 0.9 5.8 18" RCP 0.4 300 K5 0.4 2.6 18" RCP 0.6 32 K6 1.7 11.0 24" RCP 0.4 440 K7 0.3 1.9 18" RCP 0.6 48 K8 0.6 3.9 18" RCP 0.5 260 K9 0.3 1.9 18" RCP 0.6 32 K10a 3.0 19.4 30" RCP 0.4 24 K10b 3.0 19.4 30" RCP 0.3 304 Kll 8.2 53.1 42" RCP 4.0 45 Q=CiA c=0.9 RCP = Reinforced Concrete Pipe tc=5 min. CFS = Cubic Feet per Second i10=7.2 in/hr. LF = Linear Feet FPS = Feet per Second NOTE: 1. Contractor shall use invert elevations shown on plans for construction Grades shown above are rounded Drainage Pipe Chart AREA Q10 DIAMETER GRADE LENGTH PIPE (acres) (cfs) (inches) M (If) Ll --- --- 18" RCP 0.4 50 L2 --- --- 18" RCP 0.4 50 L3 --- --- 18" RCP 0.3 60 L4 --- --- 18" RCP 0.4 50 L5 --- --- 18" RCP 0.4 50 Q=CiA c=0.9 RCP = Reinforced Concrete Pipe tc=5 min. CFS = Cubic Feet per Second i10=7.2 in/hr. LF = Linear Feet FPS = Feet per Second NOTE: 1. Contractor shall use invert elevations shown on plans for construction. Grades shown above are rounded. Typical Lot Grading Scale: Not to Scale 1 I rain I awards _ - _ I ear I I I I I I S I \ Notes: •\ \ �\\\ \ 1. Ensure Front Lawn and Front Half of House Drain Towards Road. 2. Roof Gutter Can Be Configured to Ensure at Least Half of House Drains Towards the Road. \ \ \ \ \v \ \ \ IlkYip Wetlands \ � C Line(TYpj-=--------------- / - - - FES Inv. i ` \ tormwater �� / \ \ \\ \ Out 40.30 �\ \ Vegetated I / ` - - _ Setback Jurisdictional I \ inv. 39.60 A ` \ Limits of Strewn / CL 50 Seegetated tback epp i 141 L.F. 30" RCP \\ epp A. Sydes Construction, Inc. \ Silt Fence and I \ \ \:'• ••� j� S !. ) D.B. b.8. Construction, 208 Clearing Limits 1' 11 \ 1 \ L �; •0`_ \ \Outlet Structure / in Front of Sidewalk 1' I I \ \ ii� \ (See Detail) / / Stock Pile P )I 11i ,' \I \ �`\l ` / Add 6" thick anti -seep collar ( Location / 2'Bi er than 1 on all sides / (Wrapped 99 pipe FES I in silt fence) Inv. Out & I 39.50 Inv. In 40.00 \ 1 \ 1 \ Commercial FES -PP I I \ I \ \ Inv. In\40.00 To 48.20 elp I � 1 111 \\ Stor%iwater Pond \ tnv. 40.70 I Concrete See Sheet 26 of 30 \ Spillway 40 L.F. For Detail 1 I I I IIII`` 5' Conc. 42 RCP I-PPIIII SidewalkIII -) FES Concrete (TYP / Irv. Out Spillway / / ' 120 L.F. 39.50 / Commercial 2-42" RCP l I III \ I roI // Stormwater Pond I) I I ro -J- Concrete / See Sheet 26 of 30 iO I I IIII // Spillway // For Detail j I I IIII / ro r--- ro z I I II I I I I I 6 pp % JB#109a I I \ I III co I Inv.42.10 �Top 48.00 �� 1 IIII U I / I I I I I III ��4� / II I I I I r U A. Sydes Construction, Inc. '� p / D.B. 4862, Pg. 208 / \\ e I II .65'. b-b I/ I/ II l I I I I j I\ I KIO P ) r 1 'I l� M I 11'/ l i CZCB#106 Concrete Wash OutTop47.42 Station (See Detail) Z-_" Inv. 44.32 YI #109a CZCB #106a Stabilized Top 48.89± / Construction a a a' Im. 43.04 o_ a- Im. 44.70 ' / / Entrance Driveway Stubout l Insure Flush With Ex. Curb For Future CICB #109 Connection To 4876 Fill .e I 13 Sheet 4a i I I I I Overall Grading Inset Scale: P=600' / W l .. ... ., ..r. :.. ; : 11 Irv. 43.14 Ex. Swale - Vineyar s Avenue 70' R/ W -•esdmh I I w 11 55 L.F. y f :, I !� to 48.26 ,j I"11 ----- K ----- O -... K6 18" RCP .. .. .. ..: .., .: :. ,. P � e �-----I-- KS ---- --- coot. Valle inv. 44.75 I 48' B-B Y ! ! / tbpl78.42-------- -_�-1'----- --•` Gutter -- K10 ) �- I I'Iy ex 12' 1 47.89 _ I \ =� I -� - \ I \ - - I \ - \ / ' I x 49.67 I` I elp I I I I �or�' ---. � -- -- �pe�l I p K9L, �!!! o o inv. 44.49 '\' - ! ! Convert Ex. Inlet to a I I�,/ "'•' l ..: - ; - - - - _� Manhole(NCDOT 1 I , .`' b.�_ =.J - ':.> •-. `-.-.. e. .. :,.:+-a: 840.34). Insure ep , I' ' / - - _ -6t= - - �fm - - = _ - - =n- - - _ - _ - _ - .. -.•// : i . .. „ .: Flush with Pavement -_= = = RRA.a-- I 1--�=�z= - - _ - N --- -- t=--------. CICB #105 a LJ ecb �- To 47.42 I 5' Conc. l Conc. Headwall 'll "I I P Inv. Out 44.80 Il I� Inv. in Iry 43.34 Conc. Headwall rl Ir\\ \ I 1 op 48.21 Inv. 44.42 Sidewalk _ II II Il Ir f 47AD (Typ') '� 1 i �v ii 18"RCP 46.80 Inv. Out 46.10 Il Conc. Headwall I III inv. 441 Conc. Headwall ll - II Irv. In 46.30 IIII nv. In 45.40 FE rx 'I- u ! .-l/ Design . Desi n 9 Driveway Stubout 1Dri219' ew I For Future r / IB Ex. Desigy. IDrvveway I IDriveway I Connection Sidewalk I Lone Ec nl i L Connection - - J Note: Contractor shall insure that he and all his workers (contractors, subcontractors and other site personnel) do not damage construction stakes or other measures used in laying out the project whether by the Engineer or another entity including those under the employ of the contractor. Contractor shall cause his workers to observe and verify to the fullest extent practicable that stakes, other measures and grades are, or appear to be, accurate and correct, and immediately, but prior to arty associated work, notify the staking entity of any potential conflict, error or question regarding the work. The Engineer shall not be responsible if all of the above measures are not strictly adhered to. The Engineer shall not be responsible where due to damage, his staking can not be verified. For critical or costly components of the work, where the contractor believes that staking may not be preserved, the contractor shall request the staking entity to place staking in an area where its preservation can be insured. Rev. xx/xx/xx BLD - Move Commercial Pond Out of Wetlands Rev. 02/04/22 BLD - Revise Silt Fence Along Vineyards Avenue and Revise Turnlane Rev. 04/23/21 BLD - Revise Pipe Inverts for pipe Kll and Outfall Pipe Rev. 04/09/21 BLD - Rev. Per COJ Erosion Control Comments Rev. 03/15/21 BLD/KHW - Rev. per COJ SW and PAI review comments Rev. 01/06/21 BLD - Add Conc. Spillway To Main Pond Rev. 12/15/20 BLD - Rev. Per COJ Erosion and Stormwater Comments -------- ----- Sheet 4 14IO3 51slPaif P 3' Mix sin F. silt Fenre fbv - ire Mesh - Fk D'veclion Dlrectim ® 8'w.wslam At T, CB)I Flw Dmsfim Plan View N"f fo smb Filim a ds"x. 3' MaK. Section A -A Nor to 5mb steel P. Welded WreMeA va•z3 sage N".S ..' ¢ Section B-B wt.s 6WNe=2V TdB srerma urc sld Gnp"<ti<n W. 5): NWe Wlre 1"hek 2. Wire uhn11b1v1km rM mfe many asatypiwlsili ferr<e suiim. Mbimmbnil m depth fba M the robe 8'vith 4•foMrraxhldrd Semm� a ^ bottom rymmfim of -&.6r<rM lire AB•stesW1b ushWpm dam tl, 43'. 3. Wime zh"II bee Fb nonb 4dmn. VP Wire Mesh. sin Fm r iMmfas IY min. Yn Fence senior my<m" m ere mesb ante mIM "I me typiml sin ferns aeldW are meA aifM1a mx.zful pan sya<irg of 6'. I Wire Mesh Stone Outlet Not to Scale Legend: See Master Legend (Sheet I. of 30) 3 v Tract Data: Z Total Acreage ............... 84.86 ac. m F Windsor Run, Twisted Vine, 7a 3 SITE 1324 & Secret Garden .......... 82.49 ac. Offsite Commercial Area .. 2.37 ac. Total Acreage of Land to be Disturbed and Exposed .... 81.20 ac. Psi Windsor Run, Twiited Vine, enG Ph & Secret Garden .......... 78.83 ac. Offsite Commercial Area .. 2.37 ac. Syr\ Acreage in Parks or other land usage .......... 6.63 Ac. 4 °oo, Average Lot Size ............ 13,145 s.f. ,Se P4 - Minimum Lot Size Allowed .... 7, 000 s.f. y 4i Ps Minimum Lot Size Proposed ... 12,000 s.f. o�O Nuger of Lots Existing ..... 1 NS n'�c, Number of Lots Proposed ..... 198 + 3 Open Space � N Linear Feet of Streets ...... 11,738± L.F. RZ'( Zone ........................ CC / RMF-HD / RSF-7 Density Allowed ............. 6 Units / Ac. Jacksonville Density Proposed ............ 2.4 Units / Ac. Vicinity Sketch Deed References: Not to Scale D.B. 4862, Pg. 208 M.B. 77, Pg. 30 Erosion and Sedimentation Control Notes: Tax Map 338 Parcel 18.13 Pin Number: 437801191259 1. Clearing or grading operations shall begin at low points of outfall release or other locations where sediment control measures ore shown on the plan and the sediment control devices (sediment traps, silt fences, etc.) shall be installed before or simultaneously with the disturbance of any area draining to the device. - A 2. Sediment control devices and structures shall be installed, maintained and amended as needed L 4a� ``�'0�3 to provide effective control of accelerated erosion and sedimentation until the contributing sfmpmf watersheds are stabilized. 3. Requirements for materials handling shall follow rules set forth in NC601, Part II. Section F. my 4. Self -Inspection, record keeping, p, e p ng, and reporting, shall follow rules set forth in NCG01, Part ZZI, � Sections A, B, and C. ? 1. Construction Sequence: A. Notify City of Jacksonville Public Works Department, Engineer and Owner prior to beginning W construction. - B. Sediment control measures are required to be installed at the earliest practicable date after start of work. Grading operations shall begin at low points, points of outfall release or at other locations of where sediment control measures are shown on plan; and the sediment control devices (sediment traps, silt fences, diversions storm water treatment areas, etc.) shall be installed before or simultaneously with the grading of arty area draining to the device. me McA C. Limits of clearing will be as shown. Owner may lessen the amount to clear. Confirm prior to �av can. sfa. start of work. Silt fence shall be installed at the down slope edge of clearing immediately rna Fa66rlc after a lot is cleared. Silt fence shall be maintained until the lot is stobilized completely. Silt fences are shown based on topographic information in the locations expected to be needed to trap sediment prior to entering down slope areas. Actual locations of installation shall be adjusted to the actual physical on site topography. That is, where silt fence is not shown on the plan but the actual topography reflects a downward slope, silt fence shall be installed. Notes: Where the actual topography reflects an upward slope silt fence is not required. D. Install stabilized construction entrance prior to beginning construction. 1. Total development area is wooded. E. Clear and grub street right-of-way and 120' beyond right-of-way on each side. Clear and grub 2. No Register of Deed search done by or furnished to surveyor regarding drainage easements. Haul off all cleared debris. No burning allowed. Deed or Covenant Restrictions. F. Install silt fence where shown immediately after clearing. Rough grade and temporary seed lots 3. All distances are horizontal ground, U.S. survey feet. if not to be disturbed during street construction. 4. Boundary information taken from survey by Parker & Associates, Inc. G. Construct drainage swales. Immediately construct sediment traps and rock check dams where dated October 2012 and Computed Information. shown. Within 15 days, temporary seed swales if not in final condition or permanent seed and 5. Wetlands Furnished by D.R. Horton, delineated by Southern Environmental install swale liners, if in final condition. Group, Inc. and Signed by The U.S.A.C.O.E. on 06/18/2018 and Expires H. Strip and stockpile topsoil for later use. Rough grade street and muck and fill existing ditches. 06/18/2023, unless there is a change in the law or published regulations. I. Temporary seed arty areas that are not to be disturbed within 14 days. 6. There are no Areas of Environmental Concern (AEC) as defined by Coastal J. Install water and sewer mains. Area Management Act (CAMA) on this site. K Install storm drainage piping and install rip rap aprons. 7. Flood lines drawn from an electronic overlay of the digital flood map L. Fine grade street. Place CABC over compacted subgrade, and install concrete curb & gutter and FIRM CPN 370178 4368J, 370178 4378J and 370178 4379 J (The City of outlet chutes. Install asphalt surface course. Jacksonville) effective Nov. 3, 2005. M. Contractor must conduct and pass a proof roll test, on the subgrade prior to installing stone, 8. The existence of utilities may imply the existence of an easement. and on the stone rior to installi curb & utter and / or as halt The roof roll tests shall be n9 r 9 r r conducted in the presence of a City of Jacksonville Construction Inspector. N. Fine grade lots. TOB Max elevations are provided to constrain swales within the drainage Maintenance Plan: easements. See typical lot grading detail for more information. O. Seed, fertilize, and mulch all disturbed areas within 14 days of completing any phase of the 1. All erosion and sedimentation control devices shall be checked for stability and operation following every runoff- grading work. Apply temporary seeding if area is to be disturbed again and permanent if areas producing rainfall event and in no case less than once every week. Any needed repairs will be made immediately to have been final graded and accepted by engineer and owner. maintain all devices in the operating conditions intended. P. Wetland crossings: initial disturbance of these areas shall be limited to only that area minimally 2. Sediment shall be removed from behind silt fence when it accumulates to a depth of six inches.. needed to allow passage of construction equipment to prepare for the installation of the crossing 3. Sediment shall be removed from the inlet protection devices when storage capacity has been approximately 50 % and to execute upland construction on the opposing side of the crossing. Grubbing or land filled. disturbance of the subject area shall not be performed until the culverts, backf ill material, erosion 4. Any sediment tracked onto adjacent pavement shall be removed immediately, and sediment control materials or devices sufficient to substantially complete the construction and 5. A maintenance log of all erosion control inspections and maintenance performed shall be kept onsite at all times. stabilization of the crossing are staged or stockpiled at the location. Due consideration shall be 6. Stormwater Pond shall act as a sediment basin during construction until contributing areas are stabilized, then given to impending inclement weather conditions that may adversely affect the completion of the shall be converted to approved design state. crossing in the shortest time practicable. - A. Sydes Construction, Inc. 7. All catch basins to be installed with inlet protection. 2. Seeding Specifications: D.B. 4862, Pg. 208 Apply lime and fertilizer and work into seed bed, seed mixture shall be distributed uniformly and - -- covered with a clean straw mulch. Mulch shall be crimped or tacked to help hold in place. See Detail sheet 29 of 30 for material and application rates. a' a a a a a 3. Contractor is responsible for maintaining all erosion control measures and shall amend measures as CICB #111 5' Conc' a - CICB #113 required to prevent accelerated erosion from taking place on this site, until site is restabilized and Top 44.71 Sidewalk T ( ') Driveway Stubout To 50.51 _ _ _ - - - accepted b Cityof Jacksonville, engineer and owner. p y Inv. 44.88 For Future Inv. 46.09 ,r- 4. Upon restabilization of all disturbed areas and swales, contractor shall remove all temporary erosion Connection - - - - 9 control facilities and grade, grass, mulch, and restabilize the areas. - _ - I 48-71 IO I _� f Top 48.71 i / Inv. 45.08 2 River of Ufe Inc. M.B. 75 Pg. 5 Church I$ II II F':t u n r y onc. Irv. I I I r u u r•1 u uri rx. Design 137' 8-8 1 IDriveway I Ex. Desig­nl Connection 1 I Sidewalk) 47.32 I Top 50.51 Inv. 46.29 Conc. Headwall Irv. Out 47.66 11 " n u it Con leway Stubout Inv Future nection Ex. Design 129' 8-8 1 IDriveway I LConnectioni Field Book: Vineyards, Pg. 16-24 Disk Name: Acad #2422 Filename: Vineyards-Gen.dwg BLD Job No.: 5181025-6930 b 5. Once contractor has completed job and site Is restabilized, the developer shall be responsible to •'� •-. ^ ,. ,. K2 } maintain the restabilized areas until time when the lots are sold to individual lot owners. 6. For any dewatering or pumping water out of sediment basins, Catch basins, ect., Contractor p _= In to use Sediment Bags. g I .0 7. For additional information, see specifications and other plans. 0 8. For erosion control details, see sheet 29 and 30 of 30. CC 0 Silt Fence and LL USE FOR CORSTRUT1OR Headwall :eadw Clearing Limits Grading, Drainage, at Boundary Erosion and Sedimentation Control Plan with Existing Conditions WINDSOR RUN, TWISTED VINE, & SECRET GARDEN AT THE VINEYARDS Jacksonville Twp., Onslow Co., North Carolina Owner/ Developer: A. Sydes Construction Inc. 100 Carolina Plantation Boulevard Jacksonville, North Carolina (910)455-6956 DATE: 10/19/2020 GRAPHIC SCALE: 1"=60' 0 30 60 120 180 SCALE: 1"-60' FEET PARKER & ASSOCIATES, INC. Engineers - Surveyors - Planners Jacksonville, North Carolina AL P.O. Box 976 - 306 New Bridge Street - 28540 Sheet 4a of 30 Phone (910) 455-2414 - www.ParkerJacksonville.com N.C. Firm License Number: F-0108 I