NEPA/4O4 MERGER TEAM MEETING AGREEMENT
Concurrence Point No. 2: Design Options for Detailed Study
Federal Aid Project Number: NA
State Project Number: WBS Element 34466.4.1
TIP Project Number: R -2561
TIP Description: NC 87 Improvements from US 74 -76 to NC 87 Bypass (Elizabethtown
Bypass), Columbus and Bladen Counties
On November 9, 2010, the Project Team concurred that the following sections of Alternative A and
Alternative B be carried forward as detailed study alternatives.
SECTIONS COMMON TO NC 87 AND NC 87 /NC 11 PRELIMINARYBUILD ALTERNATIVES (A & B
SECTIONS SPECIFIC TO NC 87 PRELIMINARYBUILD ALTERNATIVE (A) ONLY
Section 16 East
Section 17 East Section 18 West
SECTIONS SPECIFIC TO THE NC 87 /NC 11 PRELIMINARY BUILD ALTERNATIVE (B)ONLY
Section 19 East Section 20 East
Section 21 East Section 22 East
On this date of June 13, 2013, the Project Team concurred that the Riegelwood Bypass, as shown
in the CP2 meeting handout (June 2013), be carried forward for detailed study as Alternative C.
This form supersedes the form signed November 9, 2010.
�DocuSigned by:
US Army Corps of Engineers
US Environmental Protection Agency
US Fish and Wildlife Service
National Marine Fisheries Service
NC Wildlife Resources Commission
NC Division of Marine Fisheries
NC Department of Cultural Resources
NCDENR, Division of Water Quality
Mid - Carolina Rural Planning Organization
Cape Fear Rural Planning Organization
NC Department of Transportation
7o41Al."" '5""Z ,.
Cgs' M; &14144
FInf,, r6LJJ_
x�ns srte by. \--7D10D31C923E4AC_
T�w�is W. Witsoti
31585DOB682E436... /�- DaeuSi- grtepd -by,�'
J e.AZ-1 .
2A7E32CA73394E9...
ocu igne y:
or =780929 - DocuSi- gmd-by:
G�1Ori W. 4*V
� -E795F316CA9F438
r ...
0F19A21BD448422._ -0oeu5igne�d -�by"
05412734A84940C...
CD Q�
UV, ✓Jae.Pe,
E9AA3A8EE2573F_E__
Section 6
East
Section 11
East West
Section 1
East
Section 7
East West
Section 12
East
Section 2
East
Section 8
East
Section 13
East
Section 3
East
Section 9
East
Section 14
West
Section 4
East
Section 10
East
Section 15
East
Section 5
East
SECTIONS SPECIFIC TO NC 87 PRELIMINARYBUILD ALTERNATIVE (A) ONLY
Section 16 East
Section 17 East Section 18 West
SECTIONS SPECIFIC TO THE NC 87 /NC 11 PRELIMINARY BUILD ALTERNATIVE (B)ONLY
Section 19 East Section 20 East
Section 21 East Section 22 East
On this date of June 13, 2013, the Project Team concurred that the Riegelwood Bypass, as shown
in the CP2 meeting handout (June 2013), be carried forward for detailed study as Alternative C.
This form supersedes the form signed November 9, 2010.
�DocuSigned by:
US Army Corps of Engineers
US Environmental Protection Agency
US Fish and Wildlife Service
National Marine Fisheries Service
NC Wildlife Resources Commission
NC Division of Marine Fisheries
NC Department of Cultural Resources
NCDENR, Division of Water Quality
Mid - Carolina Rural Planning Organization
Cape Fear Rural Planning Organization
NC Department of Transportation
7o41Al."" '5""Z ,.
Cgs' M; &14144
FInf,, r6LJJ_
x�ns srte by. \--7D10D31C923E4AC_
T�w�is W. Witsoti
31585DOB682E436... /�- DaeuSi- grtepd -by,�'
J e.AZ-1 .
2A7E32CA73394E9...
ocu igne y:
or =780929 - DocuSi- gmd-by:
G�1Ori W. 4*V
� -E795F316CA9F438
r ...
0F19A21BD448422._ -0oeu5igne�d -�by"
05412734A84940C...
CD Q�
UV, ✓Jae.Pe,
E9AA3A8EE2573F_E__