HomeMy WebLinkAbout20140350_Meeting Minutes_20121213U -3338B
Meeting Minutes for 4C
11 DEC 12
Page 2 of 3
Plan Sheet 21, Site 3
Wetland should not be shown as a "closed shape" and the wetland extends to the
southwest.
Plan Sheet 35 and 38, Sites 4, 5, 6, and 7
The USACE, DWQ, and NCDOT NES will coordinate necessary changes and
modifications to Plan Sheets 35 and 38. Both jurisdictional and non - jurisdictional
features did not agree with field observations. Once coordination is complete, the new
information will be incorporated into the permit drawings. In addition to the above, the
following are noted:
Wetlands on site 4 need to be shown on the plans.
There were concerns over the graphics of the rip rap at pipe outlets being placed in areas
designated at "TEMPORARY IMPACT." The permit drawings will be revised to clarify
the length of rip rap.
Plan Sheets 40 and 41, Site 8
The wetland graphics overlap the JS graphic. The stream as shown on the plans may not
be shown in the proper location. NCDOT NES will coordinate with Locations and
Survey and verify the correct location of the stream. The permit drawings will be revised
to show the proper location of the stream.
U -3338B
Meeting Minutes for 4C
11 DEC 12
Page 3 of 3
U -3338B
SR 1176 (Karr Ave) from
Randall Parkway to
SR 2649 (Martin Luther King, Jr. Parkway)
New Hanover County
Merger Process 4C Meeting
Tuesday 11 DEC 2012
Sgn on Shat
NAME
ORGANVATION
PHONE NU1ABER, EMAIL ADDRESS
JxuM. �fir�tanr
'fe1
�m1ru�+x:,tt a
SIM 11 t
VJAc f-
#. .�r...
ac I
N- -2
GD -
i�7o -
or
Qv4
90.7 -
•D 1, c .2
Q �D Dts►G►�
- 7o7 -G3i2
f ' w o �cl�, •✓
M