MEMORANDUM TO: File
FROM: Kristine A. O'Connor, P.E.
Project Planning Engineer
Project Development & Environmental Analysis Unit
SUBJECT: R -3434 CP 2 Meeting Minutes, Proposed Improvements to
SR 1500 (Midway Road) and SR 1401 (Galloway Road) from
US 17 Bypass to NC 211, WBS Element 34545.1.1, TIP
Project No. R -3434
The CP 2 meeting for TIP Project R -3434 was held on Thursday, October 11, 2012
at 10:00 AM in the Structure Design Conference Room at the Century Center, Building A.
The purpose of this meeting was for the agencies & NCDOT to obtain concurrence on
the alternatives to be carried forward for additional study as part of this project. The
following people attended the meeting:
Ron Lucas
Brad Shaver
Chris Militscher
Gary Jordan
Steve Sollod
Mason Herndon
Don Eggert
BenJetta Johnson
Karen Fussell
Stonewall Mathis
Jackson Provost
Paul Atkinson
Kalynn Chambers
Charles Cox
Kristine O'Connor
Martha Hodge
Elizabeth Lusk
Chris Rivenbark
MAILING ADDRESS:
NC DEPARTMENT OF TRANSPORTATION
PROJECT DEVELOPMENT AND ENVIRONMENTAL ANALYSIS
1548 MAIL SERVICE CENTER
RALEIGH NC 27699 -1548
Federal Highway Administration
US Army Corps of Engineers
US Environmental Protection Agency (on phone)
US Fish & Wildlife Service
NC Division of Coastal Management
NC Division of Water Quality
Cape Fear RPO
NCDOT —Congestion Management
NCDOT — Division 3
NCDOT — Division 3 (on phone)
NCDOT — Division 3
NCDOT — Hydraulics
NCDOT — PDEA
NCDOT — PDEA
NCDOT — PDEA
NCDOT — PDEA — Human Environment Section
NCDOT — PDEA — Natural Environment Section
NCDOT — PDEA — Natural Environment Section
TELEPHONE: 919- 707 -6000 LOCATION:
FAX: 919- 250 -4224 CENTURY CENTER, BUILDING A
1000 BIRCH RIDGE DRIVE
WEBSITE: WWW.NCDOT.ORG /DOH /PRECONSTRUCT /PE/ RALEIGH NC 27610
Tyler Stanton
NCDOT — PDEA — Natural Environment Section
Hardee Cox
NCDOT— Program Development Unit
Cedrick Butler
NCDOT — Roadway Design
Tatia White
NCDOT — Roadway Design
Emily Murray
NCDOT —Structures Management Unit
Brian Mayhew
NCDOT — Traffic Safety Unit (on phone)
Brian Murphy
NCDOT— Traffic Safety Unit (on phone)
Shane York
NCDOT— Transportation Planning Branch
Discussion:
• Kristine O'Connor opened the meeting with a brief recap of the discussion from
the previous meeting. Back in September at the CP 1 meeting, NCDOT proposed
carrying forward Alternatives 1 and 2, and eliminating Alternative 3 (the 3 -lane
alternative on 4 -lanes of right of way) due to safety concerns. After this, the
floor was then opened to allow each agency a chance to discuss their particular
concerns about the alternatives to be carried forward.
• Brad Shaver suggested replacing Alternative 3 with a 2 -lane alternative on 4
lanes of right of way that would have extra wide (5 or 6 -feet) paved shoulders in
order to accommodate emergency vehicles and /or evacuation traffic. The paved
section would be wide enough to handle three lanes of traffic, but would only be
striped for two lanes. Mason Herndon concurred with this, although he noted
that if Alternative 3 is chosen as the LEDPA, the only impacts that will be
authorized at the time of permitting will be those which are within the footprint
required to build the expanded 2 -lane facility, unless the justification for a 4 -lane
facility is strengthened. Chris Militscher noted that NCDOT could propose a
phased approach to this project by upgrading only 2 -lanes initially, and then
constructing the remaining two lanes and the median at a later date. Brad added
that under this phased approach, NCDOT could also come back at a later date to
request a permit modification or a new permit for the ultimate 4 -lane section.
Roadway Design had no real concerns about this, beyond the fact that it would
be problematic to then come back and build out to a 4 -lane median divided
facility later due to all of the additional asphalt that would be required.
• Ron Lucas noted that since the document is a disclosure document, and the
federal action describes the entire footprint, including the impacts associated
with the acquisition of right of way, the document must include impacts
associated with the ultimate footprint of construction. However, Chris Militscher
stated that the document should also show the impacts associated with the
initial construction that will be covered under the first phase of permitting.
• All of the Merger team members were onboard with this approach and agreed to
carry the following three alternatives forward for further study:
o Alternative 1: A 2 -lane section on 2 -lanes of right of way
o Alternative 2: A 4 -lane section on 4 -lanes of right of way
o Alternative 3: An expanded 2 -lane section on 4 -lanes of right of way
• It was determined that as additional information is gathered throughout the
study process, it could be possible to eliminate further alternatives if they no
longer meet the purpose and need, or if the purpose and need is revised due to
an increase in traffic volumes.
Action Items:
• NCDOT has scheduled a meeting with the Cape Fear RPO and local
representatives for October 30, 2012 to discuss their concerns related to the
existing traffic forecast and the need for additional traffic forecasts in the future.
• NCDOT will proceed forward with additional study of the three alternatives and
will reconvene with the Merger team at CP 2A.
If you have any questions or comments, please contact me at (919) 707 -6034 or at
kaoconnor @ncdot.gov.
cc: Meeting attendees
October 11, 2012
Section 404 /NEPA Merger Project Team Agreement
Concurrence Point No. 2: Alternatives to be Carried Forward
TIP Project R -3434
Project Name /Description: Proposed Improvements to SR 1500 (Midway Road) and SR
1401 (Galloway Road) from US 17 Bypass to NC 211, Brunswick County
The Project Team Members listed below have concurred with the following
alternatives to be carried forward for detailed study:
• Alternative 1 -2 -lane section on 2 -lane right of way
• Alternative 2-4-lane section on 4 -lane right of way
• Alternative 3 — Enhanced 2 -lane section on 4 -lane right of way
Alternative 3 , which was presented at the Concurrence Point 2 meeting on this date,
was modified from a 3 -lane section on 4 -lane of right of way to an enhanced 2 -lane
section on 4 -lane right of way. All alternatives will be best fit.
US Army Corps of Engineers
US Fish & Wildlife Servi
Brad Shaver
101111 ZV1 Z
DATE
& /l1 /.2-0; Z
Gary JordA J DATE
NC Division of Water Quality ; ? Y.,.., Z /6/ I/ �2C) IIZ
Mason Herndon DATE
NC Division of Marine Fish
Jessi Baker
DATE
NC Division of Coastal Management
Steve Sollod" DATE
National Marine Fisheries
Fritz Rohde DATE
Wildlife Resources Commission
Travis Wilson DATE
Environmental Protection Agency
Chris Militscher DATE
Federal Highway Administration
NC Department of Transportatic
R -3434
Page 1 of 2
October 11, 2012
State Historic Preservation Office V, =
Renee Gle ill -Ea ley DATE
Cape Fear Rural Planning Organization
Don Eggert DATE
R -3434
Page 2 of 2
October 11, 2012
Section 404 /NEPA Merger Project Team Agreement
Concurrence Point No. 2: Alternatives to be Carried Forward
TIP Project R -3434
Project Name/ Description: Proposed Improvements to SR 1500 (Midway Road) and SR
1401 (Galloway Road) from US 17 Bypass to NC 211, Brunswick County
The Project Team Members listed below have concurred with the following
alternatives to be carried forward for detailed study:
+ Alternative 1--2 -lane section on 2 -lane right of way
• Alternative 2 - 4 -lane section on 4 -lane right of way
• Alternative 3 - Enhanced 2 -lane section on 4 -lane right of way
Alternative 3 , which was presented at the Concurrence Point 2 meeting on this date,
was modified from a 3 -lane section on 4 -lane of right of way to an enhanced 2 -lane
section on 4 -lane right of way. All alternatives will be best fit.
US Army Corps of Engineers for I1 ! 2p17-
Brad Shaver DATE
US Fish & Wildlife
/()//11.2-&2,
Gary Jordh J DATE
NC Division of Water Quality _ ._.L_- /0/11 lZol-L
Mason Herndon DATE
NC Division of Marine Fisheries
Jessi Baker
DATE
NC Division of Coastal Management J� ` "c ry -1,//1 :Z-
Steve Sallod DATE
National Marine Fisheries
Fritz Rohde DATE
Wildlife Resources Comm
Travis Wilson
/ DATE
Environmental Protection Age4� L" 1 c f 2� 1Z,
i
Chris Militscher / DATE
Federal Highway Administration {�-�(:��`��— - - -- 1011-12
Ro ucas ' DATE
NC Department of Transportatio
Kristine O'Connor DATE
R -3434
Page 1 of 2
IF--
October 11, 2012
State Historic Preservation Office
Renee Gle ill -Ea ley DATE
Cape Fear Rural Planning Organization
Don Eggert DATE
R -3434
Page 2 of 2
October 11, 2912
Section 404 /NEPA Merger Project Team Agreement
Concurrence Point No. 2: Alternatives to be Carried Forward
TIP Project R -3434
Project Name /Description: Proposed Improvements to SR 1500 (Midway Road) and SR
1401 (Galloway Road) from US 17 Bypass to NC 211, Brunswick County
The Project Team Members listed below have concurred with the following
alternatives to be carried forward for detailed study:
o Alternative 1 -2 -lane section on 2 -lane right of way
o Alternative 2-4-lane section on 4 -lane right of way
o Alternative 3 - Enhanced 2 -lane section on 4 -lane right of way
Alternative 3 , which was presented at the Concurrence Point 2 meeting on this date,
was modified from a Vane section on 4 -lane of right of way to an enhanced 2 -lane
section on 4 -lane right of way. All alternatives will be best fit.
US Army Corps of Engineers I i 2012-
Brad Shaver DATE
j
US Fish &Wildlife Service
Gary Jordan DATE
NC Division of Water Quality_ ;,77'
Mason Herndon DATE
NC Division of Marine Fisheries
Jessi Baker DATE
NC Division of Coastal Management__
Steve Soilou � DAT,E� ,!
National Marine Fisheries I l v � , V t 1
Fritz Rohde_ DATE
Wildlife Resources Commission
Travis Wilson
Environmental Protection Agency
DATE
Chris Militscher DATE
Federal Highway Administration t ri� �,_. �� j� /_
Ron'Lucas , DATE
NC Department of Transportation, k
Kristine O'Connor DA T E
R -3434
Page t. of 2
Sectioi
Concurrent
Project Name /Descripti(
1401 (Galloway Road) frc
The Project Team ME
alternatives to be carries
0 Alternative 1 -2 -1
• Alternative 2 — 4-
• Alternative 3 — En
Alternative 3 , which wa
was modified from a 3 -1
section on 4 -lane right o
US Army Corps of Engine
US Fish & Wildlife ServicE
NC Division of Water Quo
NC Division of Marine Fis
NC Division of Coastal Mz
National Marine Fisherie!
Wildlife Resources Comm
Environmental Protection
Federal Highway Adminis
NC Department of Transp
A
IZ
October 11, 201:
i 404 /NEPA Merger Project Team Agreement
e Point No. 2: Alternatives to be Carried Forward
TIP Project R -3434
m: Proposed Improvements to SR 1500 (Midway [toad)
and SF
im US 17 Bypass to NC 211, Brunswick County
!mbers listed below have concurred with the
following
J forward for detailed study:
ane section on 2 -1ane right of way
ane section on 4 -1ane right of way
hanced 2 -lane section on 4 -lane right of way
s presented at the Concurrence Point 2 meeting
on this date,
ane section on 4 -1ane of right of way to an enhanced
2 -lane
:way. All alternatives will be best fit.
ors C ............
I t 7PI7 .
Brad Shaver
DATE
Gary Jordan /
DATE
lity
/0/11 2dl'
Mason Herndon
DATE
series
Jessi Baker
DATE
_.
nagement
Steve Solid
DATE
Fritz Rohde
DATE
/ ��` 2.t
isSio
`
Travis Wilson
DATE
Agency
Chris Militscher
DATE
n
:ration
Ro Lucas --
DATE
artatiori
Kristine O'Connor
DATE i
R -3434
Page 1 of 2
A
IZ
State Historic Preservation Office
Renee Gledhill -E
Cape fear Rural Planning Organization j u --{
Don Eggert
11, 2012
_ DATE
DATE
R -3434
Page 2 of 2
October 11, 2012
Section 404 /NEPA Merger Project Team Agreement
Concurrence Point No. 2: Alternatives to be Carried Forward
TIP Project R -3434
Project Name /Description: Proposed Improvements to SR 1500 (Midway Road) and SR
1401 (Galloway Road) from US 17 Bypass to NC 211, Brunswick County
The Project Team Members listed below have concurred with the following
alternatives to be carried forward for detailed study:
• Alternative 1 -2 -lane section on 2 -lane right of way
• Alternative 2 — 4 -lane section on 4 -lane right of way
• Alternative 3 — Enhanced 2 -lane section on 4 -lane right of way
Alternative 3 , which was presented at the Concurrence Point, 2 meeting on this date,
was modified from a 3 -lane section on 4 -lane of right of way to an enhanced 2 -lane
section on 4 -lane right of way. All alternatives will be best fit.
US Army Corps of Engineers
Brad Shaver DATE
US Fish & Wildlife Service
Gary Jordan DATE
NC Division of Water Quality
M son Herndon
i
NC Division of Marine Fisheries i D
Ba
NC Divisionn of Coastal Management
Steve Sollod
National Marine Fisheries
Fritz Rohde
Wildlife Resources Commission
Travis Wilson
Environmental Protection Agency
Chris Militscher
Federal Highway Administration
Ron Lucas
NC Department of Transportation
Kristine O'Connor
DATE
>0,w✓ IDIZ111t
D TE
DATE
DATE
DATE
DATE
DATE
DATE
R -3434
Page 1 of 2