HomeMy WebLinkAboutR-3434 (10)BEVERLY EAVES PERDUE
GOVERNOR
d,a STATp q.
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
October 10, 2012
EUGENE A. CONTI, JR.
SECRETARY
MEMORANDUM TO: File
FROM: Kristine A. O'Connor, P.E.
Project Planning Engineer
Project Development & Environmental Analysis Unit
SUBJECT: R -3434 CP 1 Meeting Minutes, Proposed Improvements to
SR 1500 (Midway Road) and SR 1401 (Galloway Road) from
US 17 Bypass to NC 211, WBS Element 34545.1.1, TIP
Project No. R -3434
The CP 1 meeting for TIP Project R -3434 was held on Wednesday, September 19,
2012 at 10:30 AM in the Structure Design Conference Room at the Century Center,
Building A. The purpose of this meeting was to determine if the agencies & NCDOT
could obtain concurrence on the Purpose & Need for this project. The following people
attended the meeting:
Ron Lucas
Federal Highway Administration
Brad Shaver
US Army Corps of Engineers
Chris Militscher
US Environmental Protection Agency
Gary Jordan
US Fish & Wildlife Service
Renee Gledhill - Earley
NC Department of Cultural Resources — SHPO
Steve Sollod
NC Division of Coastal Management
Amy Simes
NC Division of Environment & Natural Resources
Mason Herndon
NC Division of Water Quality
Travis Wilson
NC Wildlife Resource Commission
Don Eggert
Cape Fear RPO
Bruce Maxwell
Cape Fear RPO (Town of Saint James)
BenJetta Johnson
NCDOT —Congestion Management
Stonewall Mathis
NCDOT — Division 3
Jackson Provost
NCDOT — Division 3 (on phone)
Patrick Riddle
NCDOT — Division 3 (on phone)
Paul Atkinson
NCDOT — Hydraulics
Kalynn Chambers
NCDOT — PDEA
MAILING ADDRESS:
TELEPHONE: 919- 707 -6000 LOCATION:
NC DEPARTMENT OF TRANSPORTATION
FAX: 919 - 250 -4224 CENTURY CENTER, BUILDING
PROJECT DEVELOPMENT AND ENVIRONMENTAL ANALYSIS
1000 BIRCH RIDGE DRIVE
1548 MAIL SERVICE CENTER
WEBSITE: WINW.NCDOT.ORG /DOH /PRECONSTRUCT /PE/ RALEIGH NC 27610
RALEIGH NC 27699 -1548
Charles Cox
Rob Hanson
Kristine O'Connor
Martha Hodge
Chris Rivenbark
Tyler Stanton
Hardee Cox
Cedric Butler
Tatia White
Emily Murray
Brian Murphy
Memory Washaya
Shane York
Discussion:
NCDOT — PDEA
NCDOT — PDEA
NCDOT — PDEA
NCDOT — PDEA — Human Environment Section
NCDOT — PDEA — Natural Environment Section
NCDOT — PDEA — Natural Environment Section
NCDOT — Program Development Unit
NCDOT — Roadway Design
NCDOT — Roadway Design
NCDOT —Structures Management Unit
NCDOT— Traffic Safety Unit
NCDOT— Traffic Safety Unit
NCDOT— Transportation Planning Branch
• Kristine O'Connor opened the meeting with a presentation about the project and
the agenda for the meeting (see attached). Once each agenda item was
introduced and reviewed, the floor was opened to allow each agency a chance to
discuss their particular concerns or contribute their relevant information
regarding this proposed project.
• During a discussion about potential right of way impacts to adjacent churches,
Bruce Maxwell noted that the Kingdom Hall of Jehovah's Witnesses Church may
be relocating to NC 211.
• At the Scoping meeting in May, Chris Militscher asked for more information
regarding the boundary of the Voluntary Agricultural District (VAD) located on
Midway Road. It was determined that for this particular property, the boundary
of the VAD is the same as the existing right of way line. Don Eggert wanted to
know what the significance of a VAD was, and Martha Hodge responded that the
presence of VADs are important to be aware of because impacting one typically
triggers a requirement to hold a public hearing. She noted that we don't have
details on what will specifically be required for this project right now, but that
they will investigate this further in the Community Impact Analysis (CIA).
• Don Eggert & Bruce Maxwell expressed their concern about the existing and
projected traffic numbers. Mr. Maxwell was particularly concerned that the
summer peak numbers are low and do not reflect the actual summer traffic
numbers. He also requested that a new traffic forecast be completed to account
for the potential traffic increase from the new Wilmington Bypass (1 -140). Rob
Hanson suggested that PDEA, Division 3, and the Transportation Planning Branch
(TPB) sit down with Mr. Maxwell and Mr. Eggert in a separate forum to discuss
their concerns.
• Mason Herndon & Brad Shaver both noted their concern that the purpose and
need statement was not reflective of what NCDOT is trying to accomplish. Ron
Lucas proposed that the purpose and need statement focus on the individual
areas of concern like safety, emergency response, and traffic operations. During
the meeting, the Merger team crafted a new purpose and need statement that
more aptly describes the project. The statement that the team concurred on is
as follows:
The purpose of this project is to make safety and operational
improvements and facilitate weather - related evacuations and general
emergency response events.
• Although the team did not fully address or reach concurrence on Concurrence
Point 2 (Alternatives to be Carried Forward) due to a fire drill that occurred
during the meeting, there was some discussion about which alternatives would
best meet the purpose & need. Chris Militscher stated that he believes
safety /emergency response issues can be handled with a 2 -lane facility if wider
shoulders and /or sections of center turn lane were added. Mason Herndon
concurred that adding 6 -foot paved shoulders would enable emergency
responders to utilize this facility during periods of congestion or evacuation.
• Chris Militscher asked if SR 1500 (Midway Road) was currently posted as an
evacuation route. Charles Cox noted that Division 3 would like to have this
roadway posted as an evacuation route, but is not able to do so because it is
considered substandard. Jackson Provost stated that the Division of Emergency
Management handles the posting of evacuation routes.
• In discussing potential alternatives, Jackson Provost noted that there are safety
issues with having a three -lane facility with a center turn lane for long stretches
in a rural setting. Chris Militscher responded that although the 3 -lane facility
may not be the team's Least Environmentally Damaging Preferred Alternative
(LEDPA), he would like to see it carried forward for additional study, even if there
are only sections of center turn lane, as opposed to a continuous third lane. He
stated that 3 -lane and 5 -lanes facilities exist on other projects with no capacity or
level of service issues, and that 3 -lane facilities still meet the need of emergency
response teams. Tatia White noted that a facility with intermittent turn lanes
and wide shoulders would be considered as a modified 2 -lane option, rather than
a full 3 -lane facility.
Action Items:
• NCDOT will reschedule the CP 2 meeting so the Merger team will have ample
time to discuss the alternatives to be carried forward.
• NCDOT will also schedule a meeting with the Cape Fear RPO and local
representatives to discuss their concerns related to the existing traffic forecast
and the need for additional traffic forecasts in the future.
If you have any questions or comments, please contact me at (919) 707 -6034 or at
kaoconnor @ncdot.gov.
September 19, 2012
Section 404 /NEPA Merger Project Team Agreement
Concurrence Point No. 1: Purpose & Need
TIP Project R -3434
Project Name /Description: Proposed Improvements to SR 1500 (Midway Road) and SR 1401
(Galloway Road) from US 17 Bypass to NC 211, Brunswick County
The Project Team Members listed below have concurred with the following statement as the
Purpose & Need for this project:
The purpose of this project is to make safety and operational improvements and facilitate
weather - related evacuations and general emergency response events.
The Project Team members have also concurred with the following project study area:
As depicted on Figure 3 of the Merger packet, the following project study area is agreed upon. A
map of the study area is attached.
US Army Corps of Enginee
US Fish & Wildlife Service
NC Division of Water Quality
NC Division of Marine Fisherie
Brad Shaver
9f/I /Zo17–
DATE
g1/91 0 )
Gary Jordan DATE
' ZL-4 f� e / /.,
Mason Herndon DATE
Jessi Baker DATE
NC Division of Coastal Management
Steve Sollod DATE
National Marine Fisheries
FItvrz 2o'i4DE DATE
Wildlife Resources Commission 9-1,9- `A,)Y1L
Travis Wilson DATE
Environmental Protection Agenc
Chris Militscher q DATE
Federal Highway Administration
Ron Lucas DATE
j
NC Department of Transportation _
Kristine O'Connor DATE
State Historic Preservation Office ".1 q • 1q. 1,R
Renee Gledhill - Earley DATE
R -3434
Page 1 of 2
September 19, 2012
Cape Fear RPO
Don Eggert DATE
R -3434
Page 2 of 2
September 19, 2012
Section 404 /NEPA Merger Project Team Agreement
Concurrence Point No. 1: Purpose & Need
TIP Project R -3434
Project Name /Description: Proposed Improvements to SR 1500 (Midway Road) and SR 1401
(Galloway Road) from US 17 Bypass to NC 211, Brunswick County
The Project Team Members listed below have concurred with the following statement as the
Purpose & Need for this project:
The purpose of this project is to make safety and operational improvements and facilitate
weather- related evacuations and general emergency response events.
The Project Team members have also concurred with the following project study area:
As depicted on Figure 3 of the Merger packet, the following project study area is agreed upon. A
map of the study area is attached.
US Army Corps of Engineers
NC Division of Coastal Management
Steve Sol lod DATE
National Marine Fisheries
Fritz Rohde DATE
Wildlife Resources Commission
Travis Wilson DATE
Environmental Protection Agency
Chris Militscher
Federal Highway Administration
DATE
Ron Lucas DATE
NC Department of Transportation
Kristine O'Connor DATE
State Historic Preservation Office
Renee Gledhill Earley DATE
R -3434
Page 1 of 2
Brad Shaver
DATE
US Fish & Wildlife Service
Gary Jordan
DATE
NC Division of Water Quality
Mason Herndon
DATE
NC Division of Marine Fisheries
Jessi Baker
DATE
NC Division of Coastal Management
Steve Sol lod DATE
National Marine Fisheries
Fritz Rohde DATE
Wildlife Resources Commission
Travis Wilson DATE
Environmental Protection Agency
Chris Militscher
Federal Highway Administration
DATE
Ron Lucas DATE
NC Department of Transportation
Kristine O'Connor DATE
State Historic Preservation Office
Renee Gledhill Earley DATE
R -3434
Page 1 of 2
September 19, 2012
Section 404 /NEPA Merger Project Team Agreement
Concurrence Point No. 1: Purpose & Need
TIP Project R -3434
Project Name /Description: Proposed Improvements to SR 1500 (Midway Road) and SR 1401
(Galloway Road) from US 17 Bypass to NC 211, Brunswick County
The Project Team Members listed below have concurred with the following statement as the
Purpose & Need for this project:
The purpose of this project is to make safety and operational improvements and facilitate
weather - related evacuations and general emergency response events.
The Project Team members have also concurred with the following project study area:
As depicted on Figure 3 of the Merger packet, the following project study area is agreed upon. A
map of the study area is attached.
US Army Corps of Engineers
Brad Shaver
US Fish & Wildlife Service
Gary Jordan
NC Division of Water,Quality
DATE
DATE
Mason Herndon DATE
1 2.
NC Division of Marine Fisheries�
J si Baker DATE
NC Division of Coastal Management
Steve Sollod DATE
National Marine Fisheries
Fritz Rohde
DATE
Wildlife Resources Commission
Travis Wilson
DATE
Environmental Protection Agency
Chris Militscher
DATE
Federal Highway Administration
Ron Lucas
DATE
NC Department of Transportation
Kristine O'Connor
DATE
State Historic Preservation Office
Renee Gledhill - Earley DATE
R -3434
Page 1 of 2