Loading...
HomeMy WebLinkAboutSite Inspection 6.10.22 Br 22 Back BranchWetland Inspection Report Inspection Type: Reason for Inspection: Inspection Date: Site Owner Name: Latitude: County: Project Name: Project Num: Location: SW Plan Location: 20211248 TPB NCDOT - Replace Bridge 222 on SR 1151 (B-6012)Madison TPB NCDOT - Replace Bridge 222 on SR 1151 (B-6012) NC DOT Division 13 6/10/2022 Routine Site Inspection (DOT) Version: 1 Status:Issued Project Type:Replace bridge with bridge Region:Asheville Longitude:-82° 48' 26''+35° 47' 48'' Inspection Contact Person:Title:Phone: On-Site Representative(s): Secondary Inspector(s): Primary Inspector:Phone:Robert K Mitchell Facility Compliance Status:Compliant Not Compliant Question Areas: Program Areas:401 (includes isolated/non-404) Permit (401 WQC) Site inspection was conducted by Kevin Mitchell with the Asheville Regional Office on June 10, 2022. No one was present during the inspection. The site is compliant with the 401 Water Quality Certification with additional conditions. NPDES reccords were up to date. Ground cover needed per NPDES stabilization timeframes. Inspection Summary: page:1 Inspection Date: Site Number: Inspection Type: Owner: Reason for Visit: 20211248 6/10/2022 Bryan, Roger D Site Inspection (DOT)Routine Permit (401 WQC)Yes No NA NE Does the impact(s) match what was approved in the 401 WQC or non 404 permit? Are the culverts and/or filled areas installed properly? Is the site compliant with additional conditions of the 401 WQC or non 404 permit? Comment: page:2