Loading...
HomeMy WebLinkAbout20140523 Ver 1_More Info Received_20140530 (3)Strickland, Bev From: Mike Schneider <mikes@piedmontlanddesignzom> Sent: Friday, May 3U'ZUl48:4UAK4 To: 8urdette, Jennifer a Cc: Strickland, Bev; DSHIRLEY@SANDE[[OK4 Subject: RE: Dunhi||S/D (#14'0523) Attachments: Stormvvater[a|cu|ations.pdf From: Burdette,]ennhera Sent: Thursday, May 29, 2014 1:37 PM To: Cc: Strickland, Bev Subject: Dunhill S/O(#14-OS23) Mr. Schneider, We received your application for a stormwater plan for the subject project. Please email (reply toall) digital file ofthe entire package including site plans. Pdf will work fine. Thanks, Jennifer Jennifer A. Burclette 401/Buffer Coordinator 401 & Buffer Permitting, Unit Wetlands Branch N[DENR Division of Water Resources Water Quality Programs 165O Mail Service Center Raleigh, N[27699-165O (919)8O7-6364phone (919)8O7-6494fax *Email correspondence &oondƒrmm this address may besubject tm the North Carolina Public Records Low and may be disclosed tm third parties unless the content is exempt by statute or other regulation.* 1 PIADPiedmont Land Design, LLP 8522 -204 Sig Forks Road • Raleigh, NC 27615 • (919) 845 -7600 • Fag: (919) 845 -7703 February 27, 2014 Dunhill Subdivision Pittard Sears Road Cary, North Carolina Stormwater Calculations Narrative The proposed single family site is mostly wooded, and is located on a 27.1 acre tract of land located on Pittard -Sears Road. The proposed development includes construction of new public streets and 38 single family homes. The site is located in the Cape Fear river basin. The site will utilize two wet detention basins in order to provide the required nitrogen and phosphorus removal, water quality, and detention requirements. Stormwater Runoff Analysis Hydrograph software by Intelisolve was used to prepare the runoff, time of concentration and routing calculations. The calculations for the 1 and 100 year storms for pre - developed and post - development drainage areas for each stormwater discharge location are provided. This site is predominantly White Store Series soils which have a hydrological soil group type "D ". Refer to the Chatham County Soil Map in Appendix A. The site contains two streams that traverse form north to south through the site. Therefore, there are two discharge points located at the point that the streams leave the site at the southern boundary. Discharge point #1 is the western point, and contains both of the proposed BMP's. Discharge point #2 is the eastern point, and does not contain a BMP. This is due to the large drainage area (100 acres) and negligible change in pre- versus post - development conditions. For purposes of analyzing the site as a whole, this area has been labeled as "bypass area ". Civil Engineers • Landscape Architects • Land Planners Table of Contents Stormwater Calculations Narrative and Summary 2 -3 Wet Detention Pond Surface Area Calculations 4 -6 Appendix A - Chatham County Soils Map Appendix B - Discharge Point #1Pre- Developed Conditions Analysis Appendix C - Discharge Point #1 — BMP # lAnalysis Appendix D - Discharge Point #1 — BMP #2 Analysis Appendix E - Discharge Point #1 — Bypass Area Analysis Appendix F - Discharge Point #2 Analysis Appendix G — Drainage Area Map Appendix H - Nutrient Reporting Form and Toolbox Summary Appendix I — Stormwater System / HGL Calculations Appendix J — Gutter Spread Calculations Appendix K — Culvert Calculations Page 2 Discharge Point #1- Pre - developed Condition Pre - Development Condition Drainage Area - 58.0 acres Pre - development Curve Number Calculations 0.60 acres of Impervious Area CN 98 57.40 acres of Wooded Area (good condition) CN 77 Use CN = 77 Discharge Point #1- Post - developed Condition BMP #1 Post - Development Condition Drainage Area -10.0 acres Post - development Curve Number Calculations 2.10 acres of Impervious Area CN 98 2.60 acres of Open Space (good condition) CN 80 5.30 acres of wooded area CN 77 Use CN = 82 BMP #2 Post - Development Condition Drainage Area - 4.0 acres Post - development Curve Number Calculations 2.50 acres of Impervious Area CN 98 1.50 acres of Open Space (good condition) CN 80 Use CN =91 BYPASS AREA Drainage Area - 45.50 acres Post - development Curve Number Calculations 1.30 acres of Impervious Area CN 98 4.00 acres of Open Space (good condition) CN 80 40.20 acres of wooded area CN 77 Stormwater Runoff Results The results of pre and post - development peak flows for Discharge Point #1 are shown in the table below. Storm Event Pre - Development Post - Development BMP #1 with Detention Post - Development BMP #2 with Detention Post - Development Bypass Area Total Post - Developed WBMP's 1 -Year 75.80 cfs 11.49 cfs 1.16 cfs 54.16 cfs 66.81 cfs 2 -Year 108.61 cfs 19.26 cfs 5.47 cfs 77.47 cfs 102.20 cfs 5 -Year 164.91 cfs 29.01 cfs 9.89 cfs 117.35 cfs 156.25 cfs 10 -Year 208.99 cfs 31.40 cfs 11.24 cfs 148.54 cfs 191.18 cfs 100 -Year 381.74 cfs 37.10 cfs 14.73 cfs 270.69 cfs 322.52 cfs PLD Discharge Point #2 — Pre - developed Condition Pre - Development Condition Drainage Area —100.0 acres Pre - development Curve Number Calculations 100.0 acres of Wooded Area (good condition) CN 77 Use CN = 77 Discharge Point #2 — Post - developed Condition Post - Development Condition Drainage Area —100.0 acres Post - development Curve Number Calculations 0.80 acres of Impervious Area CN 98 1.30 acres of Open Space (good condition) CN 80 97.9 acres of wooded area CN 77 Use CN = 77 Storm Event Pre - Development Post Development 1 -Year 76.34 cfs 76.34 cfs 2 -Year 109.90 cfs 109.90 cfs 5 -Year 167.52 cfs 167.52 cfs 10 -Year 212.75 cfs 212.75 cfs 100 -Year 392.86 cfs 392.86 cfs Page 3 Wet Detention Pond Surface Area Calculations Page 4 PLD Page 5 PLD Page 6 PLD Appendix A Chatham County Soils Map i tl� d n ti d� Id so jr j.. r _ r +1u 44 J 4l - -t, �' '�S.., i' +s rWr MY,+pF ►� ilM+�lltrt ati� w4 - .w.:ra.o�Y+k�k 00 "0 .. - r+.r +iY =qtr. ��F wM4ei aw+M . of -,wq, 1M►Mft No �' Appendix B Discharge Point #1 Pre - Developed Condition Stormwater Runoff Analysis Hydrograph Plot Hydraflow Hydrographs by Intelisolve Thursday, Dec 19 2013, 12:50 PM Hyd. No. 1 Discharge Point #1 PRE Hydrograph type = SCS Runoff Peak discharge = 75.84 cfs Storm frequency = 1 rs Time interval = 2 min Drainage area = 57.900 ac Curve number = 77 Basin Slope = 0.0 % Hydraulic length = Oft Tc method = TR55 Time of conc. (Tc) = 14.20 min Total precip. = 3.00 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Hydrograph Volume = 219,480 cuft Discharge Point #1 PRE Q (cfs) Hyd. No. 1 -- 1 Yr Q (cfs) 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0 00 0 2 5 7 Hyd No. 1 _f 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0.00 9 12 14 16 19 21 23 26 Time (hrs) Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 1 Curve number Discharge Point #1 PRE Hydrograph type = SCS Runoff Storm frequency = [10� 0 yrs�' Drainage area = 57.900 ac Basin Slope = 0.0 % Tc method = TR55 Total precip. = 8.00 in Storm duration = 24 hrs Q (cfs) 420.00 360.00 300.00 240.00 180.00 120.00 60.00 0.00 0 2 5 7 9 Hyd No. 1 Thursday, Dec 19 2013, 12:50 PM Peak discharge = 381.74 cfs Time interval = 2 min Curve number = 77 Hydraulic length = Oft Time of conc. (Tc) = 14.20 min Distribution = Type II Shape factor = 484 Hydrograph Volume = 1,080,834 cuft Discharge Point #1 PRE Hyd. No. 1 -- 100 Yr Q (cfs) 420.00 360.00 300.00 240.00 180.00 120.00 .1 11 0.00 12 14 16 19 21 23 26 Time (hrs) Appendix C Discharge Point #1 BMP #1 Stormwater Runoff Analysis Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 5 Curve number BMP #1 POST Hydraulic length Hydrograph type = SCS Runoff Storm frequency = 1 yrs Drainage area = 10.000 ac Basin Slope = 0.0% Tc method = TR55 Total precip. = 3.00 in Storm duration = 24 hrs Q (cfs) 18.00 - 15.00 - 12.00 - • M . M 3.00 0.00 0 2 5 7 Hyd No. 5 Thursday, Dec 19 2013, 12:50 PM Peak discharge = 15.92 cfs Time interval = 1 min Curve number = 82 Hydraulic length = Oft Time of conc. (Tc) = 18.60 min Distribution = Type II Shape factor = 484 Hydrograph Volume = 50,057 cuft BMP #1 POST Hyd. No. 5 -- 1 Yr 9 12 14 Q (cfs) 18.00 15.00 12.00 • M WC - 3; 00 — - - - -- 0.00 16 19 21 23 26 Time (hrs) I i I I 1 i — 9 12 14 Q (cfs) 18.00 15.00 12.00 • M WC - 3; 00 — - - - -- 0.00 16 19 21 23 26 Time (hrs) Hydrograph Plot Hydraflow Hydrographs by Intelisolve Thursday, Dec 19 2013, 12:50 PM Hyd. No. 5 BMP #1 POST Hydrograph type = SCS Runoff Peak discharge = 66.56 cfs Storm frequency = 100 yrs Time interval = 1 min Drainage area = 10.000 ac Curve number = 82 Basin Slope = 0.0% Hydraulic length = Oft Tc method = TR55 Time of conc. (Tc) = 18.60 min Total precip. = 8.00 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0.00 0 2 5 7 Hyd No. 5 Hydrograph Volume = 212,709 cuft BMP #1 POST Hyd. No. 5 -- 100 Yr Q (cfs) 70.00 .1 11 50.00 40.00 30.00 20.00 10.00 0.00 9 12 14 16 19 21 23 26 Time (hrs) Hydrograph Plot Hydraflow Hydrographs by Intelisolve Thursday, Dec 19 2013, 3:39 PM Hyd. No. 6 BMP #1 ROUTING Hydrograph type = Reservoir Peak discharge = 11.49 cfs Storm frequency = 1 yrs Time interval = 1 min Inflow hyd. No. = 5 Max. Elevation = 254.86 ft Reservoir name = BMP #!1 Max. Storage = 16,495 cuft Storage Indication method used. Hydrograph Volume = 39,604 cuft Q (cfs) 18.00 - 15.00 - 12.00 - • M 3.00 - BMP #1 ROUTING Hyd. No. 6 -- 1 Yr M 3 5 8 10 13 15 18 20 23 Hyd No. 6 Hyd No. 5 . - I Req. Stor = 16,495 cuft Q (cfs) 18.00 15.00 12.00 m . W MIX 0.00 25 Time (hrs) j j I i 4 I I it i I I I M 3 5 8 10 13 15 18 20 23 Hyd No. 6 Hyd No. 5 . - I Req. Stor = 16,495 cuft Q (cfs) 18.00 15.00 12.00 m . W MIX 0.00 25 Time (hrs) Hydrograph Plot Hydraflow Hydrographs by Intelisolve Thursday, Dec 19 2013, 3:39 PM Hyd. No. 6 BMP #1 ROUTING I I Hydrograph type = Reservoir Peak discharge = 37.10 cfs Storm frequency = 100 yrs Time interval = 1 min Inflow hyd. No. = 5 Max. Elevation = 257.06 ft Reservoir name = BMP #!1 Max. Storage = 45,878 cuft Storage Indication method used. Hydrograph Volume = 202,236 cuft Q (cfs) 70.00 •1 11 50.00 40.00 30.00 20.00 10.00 1 11 1 BMP #1 ROUTING Hyd. No. 6 -- 100 Yr { I I I I i I I I - I i � I i i I --------------------- I _;_ I I i i i i i I 3 5 Hyd No. 6 Q (cfs) 70.00 '• 1 1 1 50.00 40.00 30.00 20.00 10.00 0.00 8 10 13 15 18 20 23 25 Time (hrs) - Hyd No. 5 _» J Req. Stor = 45,878 cuft Pond Report Hydraflow Hydrographs by Intelisolve Thursday, Dec 19 2013, 3:38 PM Pond No. 1 - BMP #!1 Pond Data [B] [C] [D] Pond storage is based on known contour areas. Average end area method used. Stage / Storage Table [C] [D] Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cult) Total storage (cult) 0.00 253.00 7,000 0 0 1.00 254.00 9,210 8,105 8,105 2.00 255.00 10,366 9,788 17,893 3.00 256.00 11,584 10,975 28,868 4.00 257.00 12,863 12,224 41,092 5.00 258.00 142,040 77,452 118,543 Culvert / Orifice Structures Weir Structures [A] [B] [C] [D] [A] [B] [C] [D] Rise (in) = 24.00 1.00 0.00 0.00 Crest Len (ft) = 16.00 0.00 0.00 0.00 Span (in) = 24.00 1.00 0.00 0.00 Crest El. (ft) = 254.50 0.00 0.00 0.00 No. Barrels = 1 1 0 0 Weir Coeff. = 3.33 0.00 0.00 0.00 Invert El. (ft) = 250.00 253.00 0.00 0.00 Weir Type = Riser - -- - -- - -- Length (ft) = 60.00 0.00 0.00 0.00 Multi -Stage = Yes No No No Slope ( %) = 0.50 0.00 0.00 0.00 N -Value = .013 .013 .000 .000 Orif. Coeff. = 0.60 0.60 0.00 0.00 Multi -Stage = n/a Yes No No Exfiltration = 0.000 in /hr (Contour) Tailwater Elev. = 0.00 ft Note: Culvert/Orifice outflows have been analyzed under inlet and outlet control. Weir riser checked for orifice conditions. Stage / Storage / Discharge Table Stage Storage Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Exfil Total ft cult ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 253.00 0.00 0.00 - -- - -- 0.00 - -- - -- - -- - -- 0.00 1.00 8,105 254.00 19.21 0.03 - -- - -- 0.00 - -- - -- - -- - -- 0.03 2.00 17,893 255.00 19.21 0.04 - -- - -- 18.84 - -- - -- - -- - -- 18.87 3.00 28,868 256.00 33.61 0.01 - -- - -- 33.59 - -- - -- - -- - -- 33.60 4.00 41,092 257.00 36.95 0.00 - -- -- 36.91 - -- - -- - -- - -- 36.91 5.00 118,543 258.00 39.92 0.00 - -- - -- 39.87 - -- - -- - -- - -- 39.88 Appendix D Discharge Point #1 BMP #2 Stormwater Runoff Analysis Hydrograph Plot Hydraflow Hydrographs by Intelisolve Thursday, Dec 19 2013, 12:50 PM Hyd. No. 7 BMP #2 POST Hydrograph type = SCS Runoff Peak discharge = 9.88 cfs Storm frequency = 1 yrs Time interval = 1 min Drainage area = 4.000 ac Curve number = 91 Basin Slope = 0.0% Hydraulic length = Oft Tc method = TR55 Time of conc. (Tc) = 17.40 min Total precip. = 3.00 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 10.00 w IR 4.00 2.00 a 22 w Hydrograph Volume = 29,732 cuft BMP #2 POST Hyd. No. 7 -- 1 Yr 2 5 7 9 Hyd No. 7 Q (cfs) 10.00 11 M 4.00 2.00 0.00 12 14 16 19 21 23 26 Time (hrs) Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 7 Curve number BMP #2 POST Hydraulic length Hydrograph type = SCS Runoff Storm frequency = 100 yrs Drainage area = 4.000 ac Basin Slope = 0.0% Tc method = TR55 Total precip. = 8.00 in Storm duration = 24 hrs Thursday, Dec 19 2013, 12:50 PM Peak discharge = 31.11 cfs Time interval = 1 min Curve number = 91 Hydraulic length = Oft Time of conc. (Tc) = 17.40 min Distribution = Type II Shape factor = 484 Hydrograph Volume = 99,401 cuft BMP #2 POST Q (cfs) Hyd. No. 7 - -100 Yr Q (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 0 00 35.00 30.00 25.00 20.00 15.00 10.00 5.00' 0 00 0 2 5 7 9 12 14 16 19 21 23 26 Hyd No. 7 Time (hrs) Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 8 Time interval BMP #2 ROUTING Max. Elevation Hydrograph type = Reservoir Storm frequency = 1 yrs Inflow hyd. No. = 7 Reservoir name = BMP #2 Storage Indication method used. Q (cfs) 10.00 fe M 4.00 2.00 Thursday, Dec 19 2013, 3:38 PM Peak discharge = 1.16 cfs Time interval = 1 min Max. Elevation = 253.07 ft Max. Storage = 17,864 cuft Hydrograph Volume = 15,526 cuft BMP #2 ROUTING Hyd. No. 8 -- 1 Yr we 5 10 15 19 24 29 34 39 Hyd No. 8 Hyd No. 7 LLE11 ] Req. Stor = 17,864 cuft 44 Q (cfs) 10.00 MR M 4.00 2.00 0.00 48 Time (hrs) Hydrograph Plot Hydraflow Hydrographs by Intelisolve Thursday, Dec 19 2013, 3:37 PM Hyd. No. 8 BMP #2 ROUTING Hydrograph type = Reservoir Peak discharge = 14.73 cfs Storm frequency = 100 yrs Time interval = 1 min Inflow hyd. No. = 7 Max. Elevation = 254.83 ft Reservoir name = BMP #2 Max. Storage = 37,435 cuft Storage Indication method used. Elev (ft) 256.00 255.00 254.00 253.00 252.00 Hydrograph Volume = 85,173 cuft BMP #2 ROUTING Hyd. No. 8 -- 100 Yr Elev (ft) 256.00 255.00 254.00 253.00 252.00 251.00 ' ' ' ' ' ' ' ' ' ' ' 251.00 0 3 5 8 10 13 15 18 20 23 25 2. BMP #2 Time (hrs) Pond Report Hydraflow Hydrographs by Intelisolve Thursday, Dec 19 2013, 3:41 PM Pond No. 2 - BMP #2 Pond Data [B] [C] [D] Pond storage is based on known contour areas. Average end area method used. Stage / Storage Table [C] [D] Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cult) Total storage (cult) 0.00 251.00 6,725 0 0 1.00 252.00 8,831 7,778 7,778 2.00 253.00 9,935 9,383 17,161 3.00 254.00 11,095 10,515 27,676 4.00 255.00 12,313 11,704 39,380 5.00 256.00 13,587 12,950 52,330 Culvert / Orifice Structures Weir Structures [A] [B] [C] [D] [A] [B] [C] [D] Rise (in) = 18.00 1.00 0.00 0.00 Crest Len (ft) = 16.00 0.00 0.00 0.00 Span (in) = 18.00 1.00 0.00 0.00 Crest El. (ft) = 253.00 0.00 0.00 0.00 No. Barrels = 1 1 0 0 Weir Coeff. = 3.33 0.00 0.00 0.00 Invert El. (ft) = 251.00 251.00 0.00 0.00 Weir Type = Riser - -- - -- - -- Length (ft) = 48.00 0.00 0.00 0.00 Multi -Stage = Yes No No No Slope ( %) = 0.50 0.00 0.00 0.00 N -Value = .013 .013 .000 .000 Orif. Coeff. = 0.60 0.60 0.00 0.00 Multi -Stage = n/a Yes No No Exfiltration = 0.000 in /hr (Contour) Tailwater Elev. = 0.00 ft Note: Culvert/Orifice outflows have been analysed under inlet and outlet control. Weir riser checked for orifice conditions. Stage / Storage / Discharge Table Stage Storage Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Exfil Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 251.00 0.00 0.00 - -- - -- 0.00 - -- - -- -- - -- 0.00 1.00 7,778 252.00 0.03 0.03 - -- - -- 0.00 - -- - -- - -- - -- 0.03 2.00 17,161 253.00 0.04 0.04 - -- - -- 0.00 - -- - -- - -- - -- 0.04 3.00 27,676 254.00 12.11 0.00 - -- - -- 12.08 - -- - -- - -- - -- 12.08 4.00 39,380 255.00 15.25 0.00 - -- - -- 15.22 - -- - -- - -- - -- 15.22 5.00 52,330 256.00 17.53 0.00 - -- - -- 17.51 - -- - -- - -- - -- 17.51 Appendix E Discharge Point #1 Bypass Area Stormwater Runoff Analysis Hydrograph Plot Hydraflow Hydrographs by Intelisolve Thursday, Dec 19 2013, 12:50 PM Hyd. No. 2 Discharge Point #1 BYPASS Hydrograph type = SCS Runoff Peak discharge = 54.16 cfs Storm frequency = 1 yrs Time interval = 6 min Drainage area = 45.500 ac Curve number = 78 Basin Slope = 0.0% Hydraulic length = Oft Tc method = TR55 Time of conc. (Tc) = 14.20 min Total precip. = 3.00 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Hydrograph Volume = 174,790 cult Discharge Point #1 BYPASS Q (cfs) Q (cfs) Hyd. No. 2 -- 1 Yr 60.00 50.00 40.00 30.00 20.00 10.00 0 00 60.00 50.00 40.00 30.00 20.00 10.00 0 00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 2 Time (hrs) Hydrograph Plot Hydraflow Hydrographs by Intelisolve Thursday, Dec 19 2013, 12:50 PM Hyd. No. 2 Discharge Point #1 BYPASS Hydrograph type = SCS Runoff Peak discharge = 270.69 cfs Storm frequency = 100 yrs Time interval = 6 min Drainage area = 45.500 ac Curve number = 78 Basin Slope = 0.0% Hydraulic length = Oft Tc method = TR55 Time of conc. (Tc) = 14.20 min Total precip. = 8.00 in Distribution = Type 11 Storm duration = 24 hrs Shape factor = 484 Q (Cfs) 280.00 240.00 200.00 160.00 120.00 :1 11 40.00 1 11 Hydrograph Volume = 834,756 cuft Discharge Point #1 BYPASS Hyd. No. 2 -- 100 Yr 2 4 6 8 Hyd No. 2 Q (Cfs) 280.00 240.00 200.00 160.00 120.00 40.00 0.00 10 12 14 16 18 20 22 24 26 Time (hrs) 1 F it I -7 2 4 6 8 Hyd No. 2 Q (Cfs) 280.00 240.00 200.00 160.00 120.00 40.00 0.00 10 12 14 16 18 20 22 24 26 Time (hrs) Appendix F Discharge Point #2 Stormwater Runoff Analysis Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 3 Curve number Discharge Point #2 PRE Hydrograph type = SCS Runoff Storm frequency = 1 yrs Drainage area = 100.000 ac Basin Slope = 0.0% Tc method = TR55 Total precip. = 3.00 in Storm duration = 24 hrs Q (cfs) 80.00 - 70.00 - •1 11 50.00 - 40.00 - 30.00 - 20.00 10.00 Thursday, Dec 19 2013, 12:50 PM Peak discharge = 76.34 cfs Time interval = 6 min Curve number = 77 Hydraulic length = Oft Time of conc. (Tc) = 34.00 min Distribution = Type II Shape factor = 484 Hydrograph Volume = 400,936 cult Discharge Point #2 PRE Hyd. No. 3 -- 1 Yr Q (cfs) 80.00 70.00 •1 11 50.00 40.00 30.00 20.00 10.00 0.00 i 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 3 Time (hrs) I I -- 1 I I i i I I Q (cfs) 80.00 70.00 •1 11 50.00 40.00 30.00 20.00 10.00 0.00 i 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 3 Time (hrs) Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 3 Discharge Point #2 PRE Hydrograph type = SCS Runoff Storm frequency = 100 yrs Drainage area = 100.000 ac Basin Slope = 0.0% Tc method = TR55 Total precip. = 8.00 in Storm duration = 24 hrs Q (cfs) 420.00 360.00 300.00 240.00 180.00 120.00 .0 0I Thursday, Dec 19 2013, 12:50 PM Peak discharge = 392.86 cfs Time interval = 6 min Curve number = 77 Hydraulic length = Oft Time of conc. (Tc) = 34.00 min Distribution = Type II Shape factor = 484 Hydrograph Volume = 1,974,420 cuft Discharge Point #2 PRE Hyd. No. 3 -- 100 Yr I I i ; I i i I I v 1 I I I � ; I ; i I _ i I 2 4 6 8 Hyd No. 3 Q (cfs) 420.00 360.00 240.00 180.00 120.00 .M - — — 0.00 10 12 14 16 18 20 22 24 26 Time (hrs) Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 4 Curve number Discharge Point #2 POST Hydrograph type = SCS Runoff Storm frequency = 1 yrs Drainage area = 100.000 ac Basin Slope = 0.0% Tc method = TR55 Total precip. = 3.00 in Storm duration = 24 hrs Q (cfs) 80.00 - 70.00 • W I I 50.00 - 40.00 - 30.00 20.00 10.00 Thursday, Dec 19 2013, 12:50 PM Peak discharge = 76.34 cfs Time interval = 6 min Curve number = 77 Hydraulic length = Oft Time of conc. (Tc) = 34.00 min Distribution = Type II Shape factor = 484 Hydrograph Volume = 400,936 cuft Discharge Point #2 POST Hyd. No. 4 -- 1 Yr Q (cfs) 80.00 50.00 40.00 30.00 20.00 - 10.00 0.00 - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 4 Time (hrs) it it i I I i I it I i I 'I II I Q (cfs) 80.00 50.00 40.00 30.00 20.00 - 10.00 0.00 - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 4 Time (hrs) Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 4 Discharge Point #2 POST Hydrograph type = SCS Runoff Storm frequency = 100 yrs Drainage area = 100.000 ac Basin Slope = 0.0% Tc method = TR55 Total precip. = 8.00 in Storm duration = 24 hrs Q (cfs) 420.00 360.00 300.00 240.00 180.00 120.00 •1 11 1 11 1 Thursday, Dec 19 2013, 12:50 PM Peak discharge = 392.86 cfs Time interval = 6 min Curve number = 77 Hydraulic length = Oft Time of conc. (Tc) = 34.00 min Distribution = Type II Shape factor = 484 Hydrograph Volume = 1,974,420 cuft Discharge Point #2 POST Hyd. No. 4 -- 100 Yr ICI � II i I — i i ! 1 i I I I I I 2 4 6 8 Hyd No. 4 Q (cfs) 420.00 360.00 ill 11 240.00 180.00 120.00 •1 11 0.00 10 12 14 16 18 20 22 24 26 Time (hrs) Appendix G Drainage Area Map Appendix H Nutrient Reporting Form and Toolbox Summary Jordan Lake Developer Nutrient Reporting Form Please complete and submit the following information to the local government permitting your development project to characterize it and assess the need to purchase nutrient offsets. Contact and rule implementation information can be found online at htti): / /Dortal.ncdenr.org/ web /wq /ps /ni)s /nutrientoffsetintro. PROJECT INFORMATION (for Jordan Lake) Applicant Name: Project Name: Project Address (if available): Street: CityfTown: County: Pt Septf,S 125 l t PP-✓> P.,�) COQ C. H X11 -' NA Date: (mo/d/yr) i / Z Project Lat: (decimal degrees) Long: (decimal degrees) / Location : '31 A 3 5 —7 r: 9 Z Is this Redevelopment? ❑ - Yes Development Type (Please check all that apply) K-- No Impervious Cover ( %): ca P ❑ Commercial ❑ Mixed -Use ® Single Fam. Residential (Pre - Construction) ❑ El Industrial Institutional I ❑ Duplex Residential El Multi -Fam. Residential Impervious Cover ( %): (Post- Construction) %' Z7 U JORDAN WATERSHED INFORMATION Small Watershed ID (6 digits): (See next page or online man.) New Development Load Requirements (See individual rules (p O " o for a full description of nutrient requirements.) Jordan Subwatershed (Please check one) Loading Rate Targets Offsite Thresholds Nitrogen N & Phosphorus P 6 N Ibs /ac Residential; ® Upper New Hope 2.2 N Ib /ac /yr 10 N Ibs /ac Commercial 0.82 P Ib /ac /yr (must meet all onsite treatment requirements) I Lower New Hope 4.4 N Ib /ac /yr 0.78 P Ib /ac /yr NUTRIENT OFFSET REQUEST (Must meet the offsite thresholds —see above) Nitrogen Loading / Offset Needs (A) (B) I (() (D) (E) I (F) (G) (H) Untreated Treated Loading Rate Reduction Need Project Offset Delivery State Buy Down Loading Rate Loading Rate Target (Ibs /ac/yr) Size (ac) Duration (yrs) Factor (%) Amount (jib (Ibs /ac /yr) (Ibs /aclyr) (Ibs /ac /yr) B- C D* E* F* G �.�lti 3.G "7 Z,L t��rS1 21_I 30 g> 110 "01,21 Phosphorus Loading / Offset Needs (A) (B) I (C) (D) (E) I (F) (G) (H) Untreated Treated Loading Rate Reduction Need Project Offset Delivery State Buy Down Load Rate Load Rate Target (Ibs /aclyr) Size (ac) Duration (yrs) Factor ( %) Amount (Ibs) (Ibs /ac /yr) (Ibs /ac /yr) (Ibs /ac /yr) B- C D* E* F* G Ci y �tiS C) s'$Z 0 L'I -( 30 Control of Peak Stormwater Flow (1 year 24 hour design storm) Calculated Predevelopment Peak Flow Calculated Post Development Peak Flow Flow Control Method ( 152. ILA 1 `13. i 7 w�� n i��'16rJ %ti'i >: Authorizing Local Government Name: Staff Name: Staff Email: Phone: Jordan Nutrient Load Reporting Form. September 12, 2012 uwzz3mm= WATERSHED SUMMARY Var2. P--lop—.�.dft- P—.-lop—../BMP. 0096 26.8% M ..... . --- - ------- (.f.) W —,356 1.182,836 (-A) N�p,MC 1.47 1- 1.13 To l Nlbo[.n WWI,g 0.76 3,78 T-1 P�ph- MC oll M7 0.16 . F— Taal P"� W Aft I 0.13 0.80 0. 45 OMP VOLUME REDUCTIONS /EFFLUENT CONCENTRATIONS P- TN EMu.rrtronan. TP m-. i M/A I 095 012 27. IR.-ffV.I—(,f.) 183% 43096 -9 —7 W.D-e.. T.taINlboP EMC( .Vl) :14% -23% !Dry D..mbnPond Tlih—h. 466i 306% T�Whnph—MC(­A) d S-1. 10% 3 T-- L�ftpbl.,',; P.m 1.08 Us ;69.lspdGF l P OMP VOLUME REDUCTIONS /EFFLUENT CONCENTRATIONS L--!t ............ . V.I.— R.du - TN EMu.rrtronan. TP m-. —.M3 BMP1 BM 2 BMP3 M/A I 095 012 ,Bloretentlon weo- wteh.ut -9 —7 W.D-e.. 50% 1.0o.12 !Dry D..mbnPond ----------- 1.20 Uo d S-1. 10% 1.21 0,21 G—. Roof P.m 1.08 Us ;69.lspdGF l P 50% 1.20 Us P—bl. 1-44 0.39 TeWM.T—d 393.9fi4 15% 403ASa 15% wtear Narva.Bn[ user deened 108 1 ols 15% Sol 011 25% 1.o8 o.12 L--!t ............ . amp I 1 BMPt emp. "M.W2 1 np I OMP BM —.M3 BMP1 BM 2 BMP3 GTCNMEM4 RMPI BMP. MP3-- —mms BMPI mpi GMP3 —.Ws BmPl amp z BMP3 weo- -9 —7 W.D-e.. P.m P.m TeWM.T—d 393.9fi4 15% 403ASa 15% 130 3.20 1.24 7..l MO.. PhWh.— MC 03. 0.302 T. 1.91 0'. Ph. Total Nft pn gb/­ W) 2.18 R. Cft,hmfflO Pheph—MC (nvA) 0.136 0.135 0.2. 0.7B P.— du . In Pl..pf.— WA (%) 13% 11% NCDENR - Nutrient Offset Watershed Information NC Department of Environment and Natural Resources Water Quality - Nutrient Offset Watershed Information Planning - Non -point Source - Nutrient Offset Information � Watershed Information Nutrient Offset Watershed Information The following map provides watershed information for developers to complete a nutrient_reporting-form n J�rtatn<aenr.a gfwebfwyr�s npslnataentaffsetpaymenq for their development project. The map enables the following activities for developers: Locate the watershed in which their project is located; Identify the nutrient strategy rules under which nutrients are being regulated; Determine delivery factors where needed; and Extract information they need to report to the local government overseeing their development. In some cases, this information is then needed to authorize use of nutrient offsets for developers who have not achieved the loading rate targets for their project. 9-4 plttard Sears hea roaJ" hin the watershed boundaries, click near it to Search open al in Reset ormat +l � •. "'??? .. i'I' , 2. .. , � ,I� art, r- i ,(,.1t � � n � � t R I r lh 1 . ®► _ r Hide Legend Page 1 of 1 a ix a N.C. Department of Environment and Natural Resources 1601 Mail Service Center, Raleigh, NC 2769 9 -1 601 Headquarters (Environment and Natural Resources Building): 217 W. Jones St. Archdale Building: 512 N. Salisbury St. Toll Free: (877) 623 -6748 http: / /portal.nedenr.org/ web /wq/ nutrient- offset - watershed - information ?p _p_id =15 M�CDIEFIR 12/23/2013 Appendix I Stormwater / HGL Calculations W-131 wo C-9, -4 3 WC9 2-7 (_fS- 14Lk � Li Storm Sewer Tabulation Page 1 Station Len Drng Area Rnoff coeff Area x C Tc Rain (I) Total flow Cap full Vel Pipe Invert Elev HGL Elev Grnd / Rim Elev Line ID Line To Incr Total Incr Total Inlet Syst Size Slope Up Dn Up Dn Up Dn Line (ft) (ac) (ac) (C) (min) (min) (in /hr) (cfs) (cfs) (ft/s) (in) ( %) (ft) (ft) (ft) (ft) (ft) (ft) 1 End 35.0 0.39 4.20 0.50 0.20 2.13 5.0 5.0 7.2 15.38 31.00 3.35 30 0.57 251.20 251.00 253.33 253.31 256.96 0.00 Inserted Line 2 1 27.0 0.17 3.81 0.50 0.09 1.94 5.0 5.0 7.2 13.97 23.84 4.59 24 1.11 251.70 251.40 253.48 253.42 256.96 256.96 3 2 105.0 0.43 3.64 0.50 0.22 1.85 5.0 5.0 7.2 13.36 17.10 4.47 24 0.57 252.60 252.00 254.30 254.00 258.56 256.96 4 3 278.0 0.28 3.21 0.50 0.14 1.64 5.0 5.0 7.2 11.81 24.64 4.96 24 1.19 256.00 252.70 257.22 254.47 262.55 258.56 5 4 27.0 0.30 0.30 0.50 0.15 0.15 5.0 5.0 7.2 1.08 9.04 2.74 18 0.74 257.80 257.60 258.20 258.03 262.55 262.55 6 4 207.0 0.25 2.63 0.50 0.13 1.35 5.0 5.0 7.2 9.71 28.56 4.50 24 1.59 259.70 256.40 260.80 258.03 265.53 262.55 7 6 27.0 0.27 0.27 0.50 0.14 0.14 5.0 5.0 7.2 0.97 9.04 0.61 18 0.74 260.30 260.10 261.50 261.50 265.53 265.53 8 6 179.0 0.16 2.11 0.50 0.08 1.09 5.0 5.0 7.2 7.84 12.41 6.45 18 1.40 263.10 260.60 264.17 261.50 268.15 265.53 9 8 27.0 0.33 0.33 0.50 0.17 0.17 5.0 5.0 7.2 1.19 6.39 0.69 18 0.37 263.60 263.50 264.96 264.96 268.15 268.15 10 8 101.0 0.22 1.62 0.50 0.11 0.84 5.0 5.0 7.2 6.07 16.52 5.50 18 2.48 266.60 264.10 267.54 264.96 271.75 268.15 11 10 146.0 0.25 1.40 0.50 0.13 0.73 5.0 5.0 7.2 5.28 12.19 5.41 15 3.56 272.10 266.90 273.02 267.84 280.55 271.75 12 11 27.0 0.60 1.15 0.50 0.30 0.61 5.0 5.0 7.2 4.37 7.86 4.40 15 1.48 273.00 272.60 273.84 273.71 280.55 280.55 13 12 43.0 0.24 0.55 0.50 0.12 0.31 5.0 5.0 7.2 2.21 5.39 2.00 15 0.70 273.40 273.10 274.35 274.32 278.15 280.55 14 13 27.0 0.31 0.31 0.60 0.19 0.19 5.0 5.0 7.2 1.34 5.56 1.65 15 0.74 273.70 273.50 274.41 274.41 278.15 278.15 15 End 184.0 0.35 2.79 0.60 0.21 1.39 5.0 5.0 7.2 10.05 16.67 5.52 24 0.54 253.00 252.00 254.13 253.12 264.20 0.00 16 15 27.0 0.14 2.44 0.50 0.07 1.18 5.0 5.0 7.2 8.54 41.29 4.64 24 3.33 254.00 253.10 255.03 254.36 264.20 264.20 17 16 153.0 0.17 0.33 0.70 0.12 0.23 5.0 5.0 7.2 1.67 5.95 2.42 15 0.85 255.60 254.30 256.12 255.56 260.59 264.20 18 17 27.0 0.16 0.16 0.70 0.11 0.11 5.0 5.0 7.2 0.81 6.81 1.88 15 1.11 256.00 255.70 256.37 256.40 260.59 260.59 19 16 155.0 0.02 1.97 0.60 0.01 0.88 5.0 5.0 7.2 6.37 16.55 7.00 18 2.48 262.35 258.50 263.31 259.15 271.65 264.20 20 19 27.0 0.17 0.47 0.50 0.09 0.24 5.0 5.0 7.2 1.70 6.81 4.02 15 1.11 266.30 266.00 266.82 266.43 271.28 271.65 21 19 365.0 0.43 1.48 0.50 0.22 0.64 5.0 5.0 7.2 4.58 8.24 3.66 18 0.62 264.70 262.45 265.52 263.86 269.73 271.65 Project File: storm.stm Number of lines: 25 Run Date: 02 -24 -2014 NOTES: Intensity = 105.70 / (Inlet time + 16.80) A 0.87; Return period = 10 Yrs. Pipe travel time suppressed. Hytlraeow btorm hewers zuw Storm Sewer Tabulation Page 2 Station Len Drng Area Rnoff Area x C Tc Rain Total Cap Vel Pipe Invert Elev HGL Elev Grnd / Rim Elev Line ID coeff (1) flow full Line To Incr Total Incr Total Inlet Syst Size Slope Up Dn Up Dn Up Dn Line (ft) (ac) (ac) (C) (min) (min) (in /hr) (cfs) (cfs) (ft/s) (in) ( %) (ft) (ft) (ft) (ft) (ft) (ft) 22 21 27.0 1.05 1.05 0.40 0.42 0.42 5.0 5.0 7.2 3.03 5.56 2.61 15 0.74 265.00 264.80 266.06 266.02 269.71 269.73 x.25 268-00- - 66A - 368 2- -- -267:0 27-3.0e 24 End 154.0 1.40 1.40 0.40 0.56 0.56 5.0 5.0 7.2 4.04 22.32 4.03 24 0.97 265.00 263.50 265.71 264.21 268.00 0.00 25 End 81.0 0.10 0.50 0.70 0.07 0.35 5.0 5.0 7.2 2.53 12.83 4.01 15 3.95 247.30 244.10 247.94 244.74 253.00 0.00 Project File: storm.stm Number of lines: 25 Run Date: 02 -24 -2014 NOTES: Intensity = 105.70 / (Inlet time + 16.80) A 0.87; Return period = 10 Yrs. ; Pipe travel time suppressed. nyuranow a[orm oeweis cwo Hydraulic Grade Line Computations Page 1 Line Size Q Downstream Len Upstream Check JL Minor coeff loss Invert HGL Depth Area Vel Vel EGL Sf Invert HGL Depth Area Vel Vel EGL Sf Ave Enrgy elev elev head elev elev elev head elev Sf loss (in) (cfs) (ft) (ft) (ft) (sqft) (ft/s) (ft) (ft) N (ft) (ft) (ft) (ft) (sqft) (ft/s) (ft) (ft) N N (ft) (K) (ft) 1 30 15.38 251.00 253.31 2.31 4.74 3.25 0.16 253.47 0.122 35.0 251.20 253.33 2.13 4.46 3.45 0.18 253.52 0.132 0.127 0.044 0.50 0.09 2 24 13.97 251.40 253.42 2.00 3.14 4.45 0.31 253.73 0.382 27.0 251.70 253.48 1.78 2.96 4.72 0.35 253.83 0.339 0.360 0.097 1.50 0.52 3 24 13.36 252.00 254.00 2.00 3.14 4.25 0.28 254.28 0.349 105 252.60 254.30 1.70 2.84 4.70 0.34 254.64 0.329 0.339 0.356 0.50 0.17 4 24 11.81 252.70 254.47 1.77 2.94 4.01 0.25 254.72 0.244 278 256.00 257.22 1.22 ** 2.00 5.90 0.54 257.76 0.578 0.411 n/a 1.50 0.81 5 18 1.08 257.60 258.03 0.43 0.42 2.60 0.10 258.13 0.335 27.0 257.80 258.20 0.40 ** 0.37 2.89 0.13 258.33 0.452 0.393 n/a 1.00 0.13 6 24 9.71 256.40 258.03 1.63 2.74 3.55 0.20 258.22 0.187 207 259.70 260.80 1.10 ** 1.78 5.46 0.46 261.27 0.532 0.359 n/a 1.50 0.70 7 18 0.97 260.10 261.50 1.40 1.72 0.57 0.01 261.50 0.007 27.0 260.30 261.50 1.20 1.52 0.64 0.01 261.51 0.009 0.008 0.002 1.00 0.01 8 18 7.84 260.60 261.50 0.90 1.11 7.08 0.78 262.28 1.235 179 263.10 264.17 1.07 ** 1.35 5.82 0.53 264.70 0.759 0.997 n/a 1.50 0.79 9 18 1.19 263.50 264.96 1.46 1.75 0.68 0.01 264.97 0.011 27.0 263.60 264.96 1.36 1.69 0.71 0.01 264.97 0.011 0.011 0.003 1.00 0.01 10 18 6.07 264.10 264.96 0.86 1.05 5.80 0.52 265.48 0.857 101 266.60 267.54 0.94 ** 1.17 5.21 0.42 267.96 0.649 0.753 n/a 0.70 0.29 11 15 5.28 266.90 267.84 0.94 0.98 5.36 0.45 268.28 0.807 146 272.10 273.02 0.92 ** 0.97 5.45 0.46 273.48 0.841 0.824 n/a 1.50 0.69 12 15 4.37 272.60 273.71 1.11 1.15 3.79 0.22 273.94 0.408 27.0 273.00 273.84 0.84 ** 0.87 5.01 039 274.23 0.738 0.573 n/a 1.25 0.49 13 15 2.21 273.10 274.32 1.22 1.22 1.81 0.05 274.38 0.105 43.0 273.40 274.35 0.95 1.00 2.20 0.08 274.43 0.136 0.120 0.052 0.70 0.05 14 15 1.34 273.50 274.41 0.91 0.95 1.41 0.03 274.44 0.057 27.0 273.70 274.41 0.71 0.71 1.88 0.05 274.46 0.116 0.086 0.023 1.00 0.05 15 24 10.05 252.00 253.12 1.12* 1.82 5.54 0.48 253.60 0.539 184 253.00 254.13 1.13 1.83 5.51 0.47 254.60 0.531 0.535 0.984 0.50 0.24 16 24 8.54 253.10 254.36 1.26 2.09 4.08 0.26 254.62 0.270 27.0 254.00 255.03 1.03 ** 1.64 5.20 0.42 255.46 0.508 0.389 n/a 1.25 0.53 17 15 1.67 254.30 255.56 1.25 1.23 1.36 0.03 255.59 0.067 153 255.60 256.12 0.52 ** 0.48 3.48 0.19 256.31 0.521 0.294 n/a 1.50 0.28 18 15 0.81 255.70 256.40 0.70 0.71 1.14 0.02 256.42 0.043 27.0 256.00 256.37 0.37 0.31 2.62 0.11 256.48 0.413 0.228 0.062 1.00 0.11 19 18 6.37 258.50 259.15 0.65* 0.73 8.70 1.18 260.32 2.443 155 262.35 263.31 0.96 ** 1.20 5.31 0.44 263.75 0.665 1.554 n/a 1.25 0.55 20 15 1.70 266.00 266.43 0.43* 0.37 4.57 0.32 266.75 1.085 27.0 266.30 266.82 0.52 0.49 3.47 0.19 267.01 0.511 0.798 0.216 1.10 0.21 21 18 4.58 262.45 263.86 1.41 1.72 2.66 0.11 263.97 0.165 365 264.70 265.52 0.82 ** 0.98 4.66 0.34 265.85 0.573 0.369 n/a 1.50 0.51 Project File: storm.stm Number of lines: 25 Run Date: 02 -24 -2014 NOTES: * Normal depth assumed., ** Critical depth assumed. lyu'dl- o."' l o.-. G V V J Hydraulic Grade Line Computations Page 2 Line Size Q Downstream Len Upstream Check JL Minor coeff loss Invert HGL Depth Area Vel Vel EGL Sf Invert HGL Depth Area Vel Vel EGL Sf Ave Enrgy elev elev head elev elev elev head elev Sf loss (in) (cfs) (ft) (ft) (ft) (sqft) (ft/s) (ft) (ft) (%) (ft) (ft) (ft) (ft) (sqft) (ft/s) (ft) (ft) ( %) ( %) (ft) (K) (ft) 22 15 3.03 264.80 266.02 1.22 1.22 2.48 0.10 266.12 0.197 27.0 265.00 266.06 1.06 1.11 2.74 0.12 266.17 0.209 0.203 0.055 1.00 0.12 23 8- 2 -66:40 £7. 8-06 68 -42- 9 42 -0 -36- 3:03- 0 -1 268 6 - - 0-- 24 24 4.04 263.50 264.21 0.71* 1.00 4.03 0.25 264.46 0.433 154 265.00 265.71 0.71 ** 1.00 4.03 0.25 265.96 0.433 0.433 n/a 1.00 0.25 25 15 2.53 244.10 244.74 0.64 0.63 3.99 0.25 244.99 0.565 81.0 247.30 247.94 0.64 ** 0.63 4.03 0.25 248.19 0.577 0.571 n/a 0.50 0.13 Project File: storm.stm Number of lines: 25 Run Date: 02 -24 -2014 NOTES: * Normal depth assumed., ** Critical depth assumed. iyurariow awnn auwulb cuuu Storm Sewer Profile Elev. (ft) 276.0( 270.00 264.00 258.00 252.00 246 00 Proj. file: storm.stm 0 50 100 150 200 250 300 350 400 450 500 550 600 650 700 Reach (ft) Hydraflow Storm Sewers 2003 Storm Sewer Profile Elev. (ft) Proj. file: storm.stm Hydraflow Storm Sewers 2003 Storm Sewer Profile Elev. (ft) 283.0( 277.00 271.00 265.00 259.00 253.00 0 i 50 100 150 200 250 300 350 400 450 500 Reach (ft) Proj. file: storm.stm Hydraflow Storm Sewers 2003 Storm Sewer Profile Elev. (ft) 292.00 286.00 280.00 274.00 268.00 262.00 0 25 50 75 100 125 150 175 Reach (ft) Proj. file: storm.stm 200 225 250 Hydraflow Storm Sewers 2003 Storm Sewer Profile Elev. (ft) Proj. file: storm.stm Hydraflow Storm Sewers 2003 Storm Sewer Profile Elev. (ft) Proj. file: storm.stm 276.00 -- — - i 273.00 - Ln: 9 270.00 — I 267.00 —I -- - - - - — — 264.00 261.00 0 10 20 30 40 50 60 70 80 90 100 Reach (ft) Hydraflow Storm Sewers 2003 Storm Sewer Profile Elev. (ft) 273.00 263.00 258.00 253.00 WTI«.T.W Proj. file: storm.stm L°4V.VV 0 25 50 75 100 125 150 175 200 225 250 275 300 325 350 375 400 Reach (ft) Hydraflow Storm Sewers 2003 Storm Sewer Profile Elev. (ft) 284.00 278.00 272.00 266.00 260.00 254.00 — 0 2 1) 50 100 150 200 250 300 350 400 450 500 550 Reach (ft) Proj. file: storm.stm Hydraflow Storm Sewers 2003 Storm Sewer Profile Elev. (ft) Proj. file: storm.stm Hydraflow Storm Sewers 2003 Storm Sewer Profile Elev. (ft) Proj. file: storm.stm 0 10 20 30 40 50 60 70 80 90 100 Reach (ft) Hydraflow Storm Sewers 2003 Storm Sewer Profile Elev. (ft) 276.00 273.00 270.00 267.00 264.00 261.00 Proj. file: storm.stm 0 25 50 75 100 125 150 175 Reach (ft) Hydraflow Storm Sewers 2003 Storm Sewer Profile Elev. (ft) 270.00 264.00 258.00 252.00 246.00 240 00 0 25 50 75 100 125 150 175 Reach (ft) Proj. file: storm.stm Hydraflow Storm Sewers 2003 Storm Sewer Profile Elev. (ft) 267.00 261.00 255.00 249.00 243.00 237.00 0 25 50 75 100 125 150 Reach (ft) 175 Proj. file: storm.stm Hydraflow Storm Sewers 2003 Appendix J Gutter Spread Calculations Inlet Report I Page 1 Line Inlet ID Q = Q Q Q Junc Curb Inlet Grate Inlet Gutter Inlet Byp No CIA carry capt byp type line No Ht L area L W So W SW Sx n depth spread depth spread Dep (cfs) (cfs) (cfs) (cfs) (in) (ft) (sgft) (ft) (ft) (ft/ft) (ft) (ft/ft) (ft/ft) (ft) (ft) (ft) (ft) (in) 1 CB -2 0.78 0.00 0.78 0.00 Comb 6.0 3.00 0.00 3.00 2.00 0.014 2.00 0.046 0.021 0.013 0.16 5.24 0.21 2.21 2.00 Off I 2 CB -3 0.34 0.00 0.34 0.00 Comb 6.0 3.00 0.00 3.00 2.00 0.014 2.00 0.046 0.021 0.013 0.12 3.33 0.16 1.50 2.00 Off 3 CB -4 0.86 0.00 0.86 0.00 Comb 6.0 3.00 0.00 3.00 2.00 0.014 2.00 0.046 0.021 0.013 0.16 5.24 0.22 2.59 2.00 2 4 CB -5 0.56 0.00 0.56 0.00 Comb 6.0 3.00 0.00 3.00 2.00 0.014 2.00 0.046 0.021 0.013 0.14 4.29 0.19 1.80 2.00 3 5 CB -14 0.60 0.00 0.60 0.00 Comb 6.0 3.00 0.00 3.00 2.00 0.014 2.00 0.046 0.021 0.013 0.14 4.29 0.19 1.85 2.00 1 6 CB -6 0.50 0.00 0.50 0.00 Comb 6.0 3.00 0.00 3.00 2.00 0.014 2.00 0.046 0.021 0.013 0.14 4.29 0.18 1.73 2.00 4 7 CB -15 0.54 0.00 0.54 0.00 Comb 6.0 3.00 0.00 3.00 2.00 0.014 2.00 0.046 0.021 0.013 0.14 4.29 0.19 1.78 2.00 5 8 CB -7 0.32 0.00 0.32 0.00 Comb 6.0 3.00 0.00 3.00 2.00 0.014 2.00 0.046 0.021 0.013 0.12 3.33 0.15 1.47 2.00 6 9 CB -16 0.66 0.00 0.66 0.00 Comb 6.0 3.00 0.00 3.00 2.00 0.014 2.00 0.046 0.021 0.013 0.15 4.76 0.20 1.92 2.00 7 10 CB -8 0.44 0.00 0.44 0.00 Comb 6.0 3.00 0.00 3.00 2.00 0.050 2.00 0.046 0.021 0.013 0.10 2.38 0.14 1.30 2.00 8 11 CB -9 0.50 0.00 0.50 0.00 Comb 6.0 3.00 0.00 3.00 2.00 0.050 2.00 0.046 0.021 0.013 0.11 2.86 0.14 1.36 2.00 10 12 CB -10 1.20 0.00 1.20 0.00 Comb 6.0 3.00 0.00 3.00 2.00 0.060 2.00 0.046 0.021 0.013 0.14 4.29 0.19 1.82 2.00 . 9 13 CB12 0.48 0.00 0.48 0.00 Comb 6.0 3.00 0.00 3.00 2.00 0.060 2.00 0.046 0.021 0.013 0.10 2.38 0.14 1.29 2.00 9 14 CB -13 0.74 0.00 0.74 0.00 Comb 6.0 3.00 0.00 3.00 2.00 0.010 2.00 0.046 0.021 0.013 0.16 5.24 0.22 2.63 2.00 9 15 CB -21 0.84 0.00 0.84 0.00 Comb 6.0 3.00 0.00 3.00 2.00 0.044 2.00 0.046 0.021 0.013 0.13 3.81 0.18 1.70 2.00 Off 16 CB -22 0.28 0.00 0.28 0.00 Comb 6.0 3.00 0.00 3.00 2.00 0.044 2.00 0.046 0.021 0.013 0.09 1.96 0.12 1.12 2.00 17 17 CB -23 0.48 0.00 0.48 0.00 Comb 6.0 3.00 0.29 3.00 2.00 Sag 2.00 0.046 0.021 0.000 -0.02 0.36 0.10 0.96 2.00 Off 18 CB -24 0.45 0.00 0.45 0.00 Comb 6.0 3.00 0.27 3.00 2.00 Sag 2.00 0.046 0.021 0.000 -0.02 0.36 0.10 0.96 2.00 Off 19 CB -25 0.05 0.00 0.05 0.00 Comb 6.0 3.00 0.00 3.00 2.00 0.044 2.00 0.046 0.021 0.013 0.05 1.09 0.06 0.58 2.00 16 20 CB -28 0.94 0.00 0.94 0.00 Comb 6.0 3.00 0.00 3.00 2.00 0.044 2.00 0.046 0.021 0.013 0.14 4.29 0.18 1.76 2.00 16 21 CB -26 0.86 0.00 0.86 0.00 Comb 6.0 3.00 0.53 3.00 2.00 Sag 2.00 0.046 0.021 0.000 0.00 0.07 0.12 1.15 2.00 Off 22 CB -27 1.68 0.00 1.68 0.00 Comb 6.0 3.00 1.03 3.00 2.00 Sag 2.00 0.046 0.021 0.000 0.07 1.59 0.19 1.82 2.00 Off Project File: gutter spread2.stm I -D -F File: idf wake county.IDF Number of lines: 25 Run Date: 12 -19 -2013 NOTES: Inlet N- Values = 0.016; Intensity = 4.46 / (Inlet time + 6.60) ^ 0.04; Return period = 1 Yrs. ; ' Indicates Known O added hyaranow ,wrorm oewers zwa N I� Inlet Report Page 2 Line Inlet ID Q = Q Q Q Junc Curb Inlet Grate Inlet Gutter Inlet Byp No CIA carry capt byp type line Ht L area L W So W SW Sx n depth spread depth spread Dep No (cfs) (cfs) (cfs) (cfs) (in) (ft) (sgft) (ft) (ft) (ft/ft) (ft) (ft/ft) (ft/ft) (ft) (ft) (ft) (ft) (in) -"G- 2-2 - GuFb -m 4 -06- -- -"a-- o 0- ©e - ag A0 0-030- -0?000 x-0: 4 m4-1 --,- - 0.4-2-» 4- . • 0-- Qf - 24 CB -41 1.40 0.00 1.40 0.00 Curb 6.0 4.00 0.00 0.00 0.00 Sag 2.00 0.100 0.030 0.000 0.32 6.14 0.35 6.14 2.00 Off 25 CB -44 1.96 0.00 1.96 0.00 Curb 6.0 4.00 0.00 0.00 0.00 Sag 2.00 0.100 0.030 0.000 0.37 7.69 0.40 7.69 2.00 Off Project File: gutter spread2.stm I -D -F File: idf wake county.IDF TNumber of lines: 25 Run Date: 12 -19 -2013 NOTES: Inlet N- Values = 0.016; Intensity = 4.46 / (Inlet time + 6.60) ^ 0.04; Return period = 1 Yrs. ; * Indicates Known Q added nyarariow aiarm sewers cvw Al Appendix K Culvert Calculations Hydrograph Plot Hydraflow Hydrographs by Intelisolve Thursday, Dec 19 2013,1:37 PM Hyd. No. 1 culvert Hydrograph type = Rational Peak discharge = 50.22 cfs Storm frequency = 25 yrs Time interval = 1 min Drainage area = 42.000 ac Runoff coeff. = 0.2 Intensity = 5.978 in /hr Tc by User = 15.00 min OF Curve = Raleigh.IDF Asc /Rec limb fact = 1/1 Q (cfs) 60.00 50.00 40.00 30.00 20.00 10.00 0 00 Hydrograph Volume = 45,195 cuft culvert Hyd. No. 1 -- 25 Yr Q (cfs) 60.00 50.00 40.00 30.00 20.00 10.00 0 00 0 5 10 15 20 25 30 Hyd No. 1 Time (min) Hydrograph Plot Hydraflow Hydrographs by Intelisolve Thursday, Dec 19 2013,1:36 PM Hyd. No. 1 culvert Hydrograph type = Rational Peak discharge = 60.65 cfs Storm frequency = 100 yrs Time interval = 1 min Drainage area = 42.000 ac Runoff coeff. = 0.2 Intensity = 7.221 in /hr Tc by User = 15.00 min OF Curve = Raleigh.IDF Asc /Rec limb fact = 1/1 Q (cfs) 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0 00 culvert Hyd. No. 1 - -100 Yr Hydrograph Volume = 54,589 cuft Q (cfs) 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0 00 0 5 10 15 20 25 30 Hyd No. 1 Time (min) HY -8 Culvert Analysis Report Table 1 - Culvert Summary Table: Culvert 1 Straight Culvert Inlet Elevation (invert): 250.50 ft, Outlet Elevation (invert): 250.00 ft Culvert Length: 76.00 ft, Culvert Slope: 0.0066 Total Culvert Headwater Inlet Outlet Outlet Tailwater Discharge Discharge Discharge Elevation Control Control Flow Normal Critical Outlet Tailwater Velocity Velocity Names (cfs) (cfs) (ft) Depth (ft) Depth (ft) Type Depth (ft) Depth (ft) Depth (ft) Depth (ft) (ft/s) (ft/s) 25 -YR 61.00 61.00 254.07 3.567 0.924 1 -S2n 2.050 2.352 2.093 0.424 9.168 2.656 100 -YR 71.00 71.00 254.45 3.947 0.963 1 -S2n 2.253 2.543 2.293 0.463 9.538 2.807 Table 1 - Culvert Summary Table: Culvert 1 Straight Culvert Inlet Elevation (invert): 250.50 ft, Outlet Elevation (invert): 250.00 ft Culvert Length: 76.00 ft, Culvert Slope: 0.0066 Water Surface Profile Plot for Culvert: Culvert 1 260 258 256 ro at w 254 252 250 Crossing - Crossing 1, Design Discharge - 71.0 cfs Ctdvert - Cuh-ert 1;. Cuh -ert Discharge - 71.0 cfs 20 40 60 80 Station (ft) Site Data - Culvert 1 Site Data Option: Culvert Invert Data Inlet Station: 0.00 ft Inlet Elevation: 250.50 ft Outlet Station: 76.00 ft Outlet Elevation: 250.00 ft Number of Barrels: 1 Culvert Data Summary - Culvert 1 Barrel Shape: Circular Barrel Diameter: 4.00 ft Barrel Material: Concrete Embedment: 0.00 in Barrel Manning's n: 0.0130 Culvert Type: Straight Inlet Configuration: Square Edge with Headwall Inlet Depression: NONE